会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • A Single-Anchor Centrally Grouted Full-Length Anchored Steel Wire Bundle and Supporting Method Thereof
    • US20210340872A1
    • 2021-11-04
    • US16624541
    • 2018-10-29
    • China University of Mining and Technology
    • Nong ZHANGZhengzheng XieJunyao ZhouQun Wei
    • E21D20/02E21D21/00
    • The present invention provides a single-anchor centrally grouted full-length anchored steel wire bundle and a supporting method thereof, which are suitable for use in supporting engineering for the deep dynamic pressure roadway or soft rock roadway. The steel wire bundle consists of parallel steel wires and a central pipe, wherein multiple strands of parallel steel wires are arranged around the central pipe, the central pipe is provided with a slurry output bracket which divides the parallel steel wires into a front part and a rear part, the front part is provided with large stirring jackets, and the rear part is provided with a threaded casing on its tail end. After the coal is cut by a tunneling machine and a roadway is formed, the steel wire bundle is anchored at the ends, and the roadway tunneling speed is increased on a premise of ensuring roadway safety; central grouting is carried out for the steel wire bundle with a pump truck without affecting the quick roadway tunneling, so as to anchor the steel wire bundle in full length and ensure long-time stability of the roadway. The length of the steel wire bundle may be selected according to the geological conditions and the mining environment of the mine, and is not limited by the height of the roadway; the single-anchor centrally grouted supporting method realizes full-length anchoring of the steel wire bundle, and it not only improves the roadway tunneling speed and relieves mining imbalance in the mine, but also solves the problem of large deformation of the roadway.
    • 7. 发明申请
    • CLEAN AND EFFICIENT COAL MINING METHOD
    • US20210189876A1
    • 2021-06-24
    • US16080250
    • 2018-03-13
    • China University of Mining and Technology
    • Nong ZhangZhengzheng XieJunyao Zhou
    • E21F15/00E21F15/06
    • The present invention relates to a clean and efficient coal mining method, which is applicable to the field of solid waste treatment in mines. The method is characterized in: the width of short-segment working faces is designed according to the discharge volume of solid wastes produced in a mine, including downhole gangue and surface coal ash; first, two adjacent short-segment working faces are mined and backfilled, and the edges of the filling face and the solid coal side are supported with anchor rods while roadways are retained; the roadways retained at the two short-segment working faces and the coal mass in the middle constitute a long-segment working face mining system; the long-segment working face is mined, the short-segment backfilled working faces at the two sides are mined and backfilled at the same time, and the gangue produced at the long-segment working face is transported to the short-segment working faces to fill, so that a continuous mining system that consists of backfill mining at short-segment working faces and efficient stopping at long-segment working faces is realized. The method provided in the present invention can deal with all surface and downhole solid wastes in a mine, reduces the cost of gangue treatment, and mitigates damages to the ecological environment; besides, the method utilizes solid wastes to fill the gobs to form roadways, eliminates coal pillars and improve resource recovery rate.