会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • PROCESSING OPTIMIZATION LOAD ADJUSTMENT
    • 处理优化负载调整
    • US20120254822A1
    • 2012-10-04
    • US13073626
    • 2011-03-28
    • Zheng LinAkan A. UsoroJonathan M. Class
    • Zheng LinAkan A. UsoroJonathan M. Class
    • G06F9/44
    • G06F8/41G06F9/50G06F9/5083G06F11/3017G06F11/3409G06F2209/5022
    • In embodiments of processing optimization load adjustment, work units of a software build project are processed, and the processing generally maximizes utilization of the processing resources of a computing device. Performance data of the processing resources is collected as the work units of the software build project are processed. A determination is made as to whether utilization of the processing resources is optimal to process the software build project while avoiding adverse resource conditions. The number of the work units that are processing can then be increased in response to determining that utilization of the processing resources is not optimal. Alternatively, the number of the work units that are processing can be decreased in response to determining that utilization of the processing resources exceeds optimal processing. Alternatively, the work units that are processing can be allowed to complete processing without scheduling additional work units for processing.
    • 在处理优化负载调整的实施例中,处理软件构建项目的工作单元,并且处理通常使计算设备的处理资源的利用最大化。 随着处理软件构建项目的工作单位,收集处理资源的性能数据。 确定处理资源的利用是否最佳以处理软件构建项目,同时避免不利的资源状况。 响应于确定处理资源的利用率不是最佳,可以增加正在处理的工作单元的数量。 或者,响应于确定处理资源的利用超过最优处理,可以减少正在处理的工作单元的数量。 或者,可以允许正在处理的工作单元完成处理,而不调度用于处理的附加工作单元。
    • 6. 发明申请
    • DEPENDENCE-BASED SOFTWARE BUILDS
    • 基于依赖的软件构建
    • US20110239195A1
    • 2011-09-29
    • US12732100
    • 2010-03-25
    • Zheng LinMichael L. Rowand, JR.Jonathan M. ClassKiran B. DoreswamyOm K. Sharma
    • Zheng LinMichael L. Rowand, JR.Jonathan M. ClassKiran B. DoreswamyOm K. Sharma
    • G06F9/44
    • G06F8/71
    • Dependence-based software builds are described. In embodiments, authored source code is received as inputs to a computer device to develop a buildable unit of a software build project. The software build project includes multiple buildable units that can be allocated for independent development among multiple developers, such as at computer devices local to each developer. At the computer device, dependent buildable units are identified that have a dependency relationship with the buildable unit for execution. The authored source code of the buildable unit is then validated to determine that the buildable unit executes with the dependent buildable units for error-free execution before the buildable unit is subsequently provided to a software build service that compiles the multiple buildable units to generate the software build project.
    • 描述了基于依赖的软件构建。 在实施例中,创作的源代码作为输入被接收到计算机设备以开发软件构建项目的可构建单元。 软件构建项目包括可以分配给多个开发人员之间的独立开发的多个可构建单元,例如每个开发人员本地的计算机设备。 在计算机设备处,识别与可构建单元具有依赖关系以进行执行的可依赖的可构建单元。 然后验证可构建单元的创作源代码,以确定可构建单元在依赖可构建单元之前执行以实现无差错执行,然后可构建单元随后提供给编译多个可构建单元以生成软件的软件构建服务 建设项目。