    • POWER PLANT WITH INTEGRATED FUEL GAS PREHEATING
    • 具有集成燃料气体预热的动力装置
    • US20150007575A1
    • 2015-01-08
    • US14317723
    • 2014-06-27
    • ALSTOM Technology Ltd.
    • Paul DrouvotFrançois DrouxKlara Berg
    • F01K17/02F02C7/224
    • F01K17/025F01K23/10F02C6/18F02C7/224Y02E20/16
    • The invention refers to a CCPP comprising a gas turbine, a water steam cycle with a steam turbine and a HRSG with at least two pressure levels, and a fuel preheater for preheating the fuel of the gas turbine. The fuel preheater includes a first heat exchanger for preheating the fuel to a first elevated temperature, which is connected to a feed water line from a pressure level of the HRSG, which is below the highest HRSG pressure level, and a second heat exchanger for further preheating the fuel gas to a second elevated temperature, which is connected to the high pressure feed water with the highest pressure level of the HRSG. The disclosure further refers to a method for operating a CCPP with such a fuel preheater.
    • 本发明涉及一种CCPP,其包括燃气轮机,具有蒸汽轮机的水蒸汽循环和具有至少两个压力水平的HRSG,以及用于预热燃气轮机的燃料的燃料预热器。 燃料预热器包括用于将燃料预热到第一高温的第一热交换器,该第一升高温度从低于最高HRSG压力水平的HRSG的压力水平连接到给水管线,以及用于进一步的第二热交换器 将燃料气体预热到第二高温,其连接到具有最高压力水平的高压给水。 本公开还涉及用这种燃料预热器操作CCPP的方法。