    • System for Supporting Preparation of Schedule for Development Project and the Method Thereof
    • 支持发展项目进度计划制度及方法
    • US20070288919A1
    • 2007-12-13
    • US11751797
    • 2007-05-22
    • Hisatoshi AdachiMakoto KanoAkio KoideToshihiko Nakazawa
    • Hisatoshi AdachiMakoto KanoAkio KoideToshihiko Nakazawa
    • G06F9/445
    • G06Q10/00
    • A system for and method of supporting preparation of an operation schedule table for a development project, including an input accepting section for accepting, for each of a plurality of components to be developed, an input of a utilization method by which a first development project having a timetable already prepared is used in a second development project for which a new timetable is generated; a plan conversion section for converting, for each of the components, a plurality of operation processes planned in the first development project based on the utilization method for each of the components, to generate a plurality of operation processes for developing the components in the second development project; and a schedule section for scheduling the respective operation processes to generate a timetable for the second development project.
    • 一种用于支持开发项目的操作调度表的准备的系统和方法,包括输入接受部分,用于接受要开发的多个组件中的每一个,输入使用方法的输入,通过该输入,第一开发项目具有 已经编制的时间表用于产生新时间表的第二个发展项目; 一个计划转换部分,用于根据每个部件的利用方法,针对每个部件转换在第一开发项目中计划的多个操作处理,以产生用于开发第二开发中的组件的多个操作处理 项目; 以及调度部,用于调度各个操作处理以生成第二开发项目的时间表。
    • 6. 发明授权
    • Design process recording
    • 设计流程记录
    • US08166078B2
    • 2012-04-24
    • US12532389
    • 2008-02-26
    • Toshihiko Nakazawa
    • Toshihiko Nakazawa
    • G06F17/00
    • G06Q10/06
    • Description of works such as “requirement”, “definition”, and “confirmation” in the narrow sense in a design process is made possible. A design work recording unit (22a) records in a data storage device (6) an inputted “design work name” as one of “external requirement name”, “concept definition name”, “internal requirement name”, “detailed definition name”, and so on. An inter-work relation recording unit (22b) records in the data storage device (6) a relation between two “design work names” selected from “external requirement name”, “concept definition name”, “internal requirement name”, “detailed definition name”, and so on recorded in the data storage device (6). Here, the inter-work relation recording unit (22b) records a relation between “external requirement name” and “concept definition name”, a relation between “concept definition name” and “internal requirement name”, a relation between “internal requirement name” and “detailed definition name”, and so on.
    • 在设计过程中,狭义上的“要求”,“定义”和“确认”等作品的描述成为可能。 设计工作记录单元(22a)将输入的“设计作品名称”作为“外部要求名称”,“概念定义名称”,“内部要求名称”,“详细定义名称” , 等等。 工作间关系记录单元(22b)在数据存储装置(6)中记录从“外部要求名称”,“概念定义名称”,“内部要求名称”,“详细说明书”中选择的两个“设计作品名称” 定义名称“等,记录在数据存储装置(6)中。 这里,工作间关系记录单元(22b)记录“外部要求名称”和“概念定义名称”之间的关系,“概念定义名称”和“内部要求名称”之间的关系,“内部要求名称 “和”详细定义名称“等。