会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • On-chip testing using time-to-digital conversion
    • 使用时间到数字转换的片上测试
    • US08680874B2
    • 2014-03-25
    • US13194818
    • 2011-07-29
    • Nikolaos MinasErik Jan Marinissen
    • Nikolaos MinasErik Jan Marinissen
    • G01R27/02
    • G01R31/2853
    • A method and system for testing the functionality of a through-silicon-via in an integrated circuit is disclosed. In one aspect, the functionality is tested by measuring its capacitance from one side only. The capacitance of the TSV can be determined by measuring a timing delay introduced in a measurement circuit due to the presence of the TSV. The timing delay is determined by comparing the timing of measurement signal from the measurement circuit with the timing of a reference signal provided by a reference circuit. The comparison is carried out using a digital timing measurement circuit, such as a time-to-digital converter.
    • 公开了一种用于测试集成电路中的硅通孔的功能的方法和系统。 在一个方面,通过仅从一侧测量其电容来测试功能。 可以通过测量由于TSV的存在而在测量电路中引入的定时延迟来确定TSV的电容。 定时延迟通过将来自测量电路的测量信号的定时与由参考电路提供的参考信号的定时进行比较来确定。 使用诸如时间 - 数字转换器的数字定时测量电路进行比较。
    • 3. 发明申请
    • ON-CHIP TESTING USING TIME-TO-DIGITAL CONVERSION
    • 使用时间到数字转换的片上测试
    • US20120025846A1
    • 2012-02-02
    • US13194818
    • 2011-07-29
    • Nikolaos MinasErik Jan Marinissen
    • Nikolaos MinasErik Jan Marinissen
    • G01R27/02
    • G01R31/2853
    • A method and system for testing the functionality of a through-silicon-via in an integrated circuit is disclosed. In one aspect, the functionality is tested by measuring its capacitance from one side only. The capacitance of the TSV can be determined by measuring a timing delay introduced in a measurement circuit due to the presence of the TSV. The timing delay is determined by comparing the timing of measurement signal from the measurement circuit with the timing of a reference signal provided by a reference circuit. The comparison is carried out using a digital timing measurement circuit, such as a time-to-digital converter.
    • 公开了一种用于测试集成电路中的硅通孔的功能的方法和系统。 在一个方面,通过仅从一侧测量其电容来测试功能。 可以通过测量由于TSV的存在而在测量电路中引入的定时延迟来确定TSV的电容。 定时延迟通过将来自测量电路的测量信号的定时与由参考电路提供的参考信号的定时进行比较来确定。 使用诸如时间 - 数字转换器的数字定时测量电路进行比较。