会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • VIDEO REPRODUCING/RECORDING AND PLAYING SYSTEM AND METHOD FOR SETTING AND PLAYING VIDEO SECTION
    • 视频再现/记录和播放系统以及用于设置和播放视频部分的方法
    • US20090136198A1
    • 2009-05-28
    • US12177402
    • 2008-07-22
    • Chung-Jen ChenMeng-Tze LiuHung-Shen Su
    • Chung-Jen ChenMeng-Tze LiuHung-Shen Su
    • H04N5/91
    • H04N5/76H04N5/781
    • A video reproducing/recording and playing system and a method thereof for setting and playing video sections are provided. The system includes a host computer with a data buffer and a database, a video module, and a monitor. While continuously receiving video signals, the video module sets a first section index when a scene difference between a first frame and a second frame represented by a portion of the video signals is greater than a predetermined scene difference wherein the first section index points to a start time of the second frame. Then, the video module stores the first section index and stores the video signals corresponding to the second frame into the data buffer. After retrieving the first section index, the monitor presents the video signals from the second frame points by the first section index.
    • 提供了一种用于设置和播放视频部分的视频再现/记录和播放系统及其方法。 该系统包括具有数据缓冲器和数据库的主机,视频模块和监视器。 当连续接收视频信号时,视频模块设置第一部分索引,当由视频信号的一部分表示的第一帧和第二帧之间的场景差大于预定场景差异时,其中第一部分索引指向开始 第二帧的时间。 然后,视频模块存储第一部分索引,并将对应于第二帧的视频信号存储到数据缓冲器中。 在检索第一部分索引之后,监视器通过第一部分索引从第二帧点呈现视频信号。
    • 4. 发明申请
    • METHOD FOR EXECUTING SCHEDULED TASK
    • 执行调度任务的方法
    • US20100138838A1
    • 2010-06-03
    • US12402365
    • 2009-03-11
    • Sheng-Chang LinMeng-Tze Liu
    • Sheng-Chang LinMeng-Tze Liu
    • G06F9/46G06F1/00
    • G06F9/4401
    • A scheduled task executing method is used in a computer system and a peripheral device. The computer system has a time generator for generating time information and a memory. When the computer system is in a working state, a user input interface is provided, a scheduled time is set via the user input interface, and the scheduled time is automatically stored in the memory. When the computer system is in a power off state, electricity is continuously supplied to the time generator and the memory. If the time information and the scheduled time comply with a specified relation, a power control signal is generated. In response to the power control signal, the computer is switched from the power off state to the working state. When the computer system is in the working status, the peripheral device is activated to execute a scheduled task item corresponding to the scheduled time.
    • 在计算机系统和外围设备中使用计划任务执行方法。 计算机系统具有用于产生时间信息和存储器的时间发生器。 当计算机系统处于工作状态时,提供用户输入接口,通过用户输入接口设置调度时间,并将调度时间自动存储在存储器中。 当计算机系统处于断电状态时,电力被连续供给时间发生器和存储器。 如果时间信息和预定时间符合指定的关系,则产生功率控制信号。 响应于电源控制信号,计算机从断电状态切换到工作状态。 当计算机系统处于工作状态时,外围设备被激活以执行与预定时间相对应的计划任务项目。