会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Data normalization in inverse geometry computed tomography system
    • 逆几何计算机断层扫描系统的数据归一化
    • US07860210B2
    • 2010-12-28
    • US12273223
    • 2008-11-18
    • Norbert J. PelcJongduk Baek
    • Norbert J. PelcJongduk Baek
    • A61B6/00
    • A61B6/032A61B6/583
    • A method for imaging an object in a computed tomography (CT) system with a plurality of sources comprising a first source and a second source, wherein the plurality of sources together with a detector array are mounted on a rotatable gantry, and wherein an intensity of the second source has unknown fluctuations is provided. Projection data is collected using the first source in a first gantry position. Projection data is collected using the second source in a second gantry position, wherein projection data from the first source in the first gantry position substantially overlaps projection data from the second source in the second gantry position. Data from the first source at the first gantry position is used to correct for source fluctuations of the second source at the second gantry position.
    • 一种用于在具有多个源的计算机断层摄影(CT)系统中对物体进行成像的方法,所述多个源包括第一源和第二源,其中所述多个源与检测器阵列一起安装在可旋转机架上,并且其中强度 第二个来源提供了未知的波动。 在第一台架位置使用第一源收集投影数据。 在第二台架位置使用第二源收集投影数据,其中来自第一台架位置的第一源的投影数据在第二台架位置中基本上与来自第二源的投影数据重叠。 来自第一台架位置处的第一源的数据用于校正第二机架位置处的第二源的源波动。
    • 3. 发明申请
    • DATA NORMALIZATION IN INVERSE GEOMETRY COMPUTED TOMOGRAPHY SYSTEM
    • 反相几何计算机图像系统中的数据正规化
    • US20100124310A1
    • 2010-05-20
    • US12273223
    • 2008-11-18
    • Norbert J. PelcJongduk Baek
    • Norbert J. PelcJongduk Baek
    • A61B6/00
    • A61B6/032A61B6/583
    • A method for imaging an object in a computed tomography (CT) system with a plurality of sources comprising a first source and a second source, wherein the plurality of sources together with a detector array are mounted on a rotatable gantry, and wherein an intensity of the second source has unknown fluctuations is provided. Projection data is collected using the first source in a first gantry position. Projection data is collected using the second source in a second gantry position, wherein projection data from the first source in the first gantry position substantially overlaps projection data from the second source in the second gantry position. Data from the first source at the first gantry position is used to correct for source fluctuations of the second source at the second gantry position.
    • 一种用于在具有多个源的计算机断层摄影(CT)系统中对物体进行成像的方法,所述多个源包括第一源和第二源,其中所述多个源与检测器阵列一起安装在可旋转机架上,并且其中强度 第二个来源提供了未知的波动。 在第一台架位置使用第一源收集投影数据。 在第二台架位置使用第二源收集投影数据,其中来自第一台架位置的第一源的投影数据在第二台架位置中基本上与来自第二源的投影数据重叠。 来自第一机架位置处的第一源的数据用于校正第二机架位置处的第二源的源波动。