会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 3. 发明申请
    • Arrangement for the transport of wind turbine components
    • 运输风力发电机组件的安排
    • US20110148072A1
    • 2011-06-23
    • US12954982
    • 2010-11-29
    • Henning Poulsen
    • Henning Poulsen
    • B60P3/40
    • B62D33/0207B60P3/40B66F9/065F03D13/40Y02E10/726
    • A system for the transportation of wind turbine components with a vehicle, especially for the transportation of large wind turbine components, is provided. The vehicle includes at least two wheelsets, a first end frame connected to a first wheelset and a second end frame connected to a second wheelset. The vehicle further includes a support structure for carrying at least one wind turbine component, wherein the support structure is adapted to be detachably connected to the first end frame and/or to the second end frame. Thereby, the wind turbine component is connected solely to the support structure in a fixed but detachable manner.
    • 提供了一种用于运输具有车辆的风力涡轮机部件的系统,特别是用于运输大型风力涡轮机部件的系统。 车辆包括至少两个轮对,连接到第一轮对的第一端框架和连接到第二轮对的第二端框架。 车辆还包括用于承载至少一个风力涡轮机部件的支撑结构,其中支撑结构适于可拆卸地连接到第一端框架和/或第二端部框架。 因此,风力涡轮机部件以固定但可拆卸的方式单独连接到支撑结构。
    • 6. 发明授权
    • Arrangement for lifting a tower wall portion of a wind turbine and method for lifting a tower wall portion of a wind turbine
    • 用于提升风力涡轮机的塔壁部分的装置和用于提升风力涡轮机的塔壁部分的方法
    • US08764082B2
    • 2014-07-01
    • US13166099
    • 2011-06-22
    • Mikkel Verner KroghHenning Poulsen
    • Mikkel Verner KroghHenning Poulsen
    • B66C1/00
    • B66C1/42B66C1/108B66C1/62Y02E10/72
    • An arrangement for lifting a tower wall portion of a wind turbine is provided. The arrangement includes a bar, a first holding member and a second holding member. The bar is connectable to a coupling element of a lift. The first and second holding members have respective first and second engagement portions adapted for engaging the tower wall portion at a first position and a second position respectively, the first position being different from the second position. The first and second holding members are releasably lockable at the bar such that the first engagement portion and the second engagement portion are a first distance away from each other. The first and second holding members are also releasably lockable at the bar such that the first engagement portion and the second engagement portion are a second distance away from each other, the second distance being different from the first distance.
    • 提供了用于提升风力涡轮机的塔壁部分的装置。 该装置包括杆,第一保持构件和第二保持构件。 该杆可连接到电梯的耦合元件。 第一和第二保持构件具有分别适于在第一位置和第二位置处接合塔壁部分的第一和第二接合部分,第一位置与第二位置不同。 第一和第二保持构件可释放地锁定在杆处,使得第一接合部分和第二接合部分彼此离开第一距离。 第一和第二保持构件也可释放地锁定在杆处,使得第一接合部分和第二接合部分彼此离开第二距离,第二距离与第一距离不同。