会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Coke quenching apparatus
    • 焦炭淬火装置
    • US4743342A
    • 1988-05-10
    • US939163
    • 1986-12-17
    • Georg PollertFriedrich OrywalClaus Meyer-WulfMartin Reinke
    • Georg PollertFriedrich OrywalClaus Meyer-WulfMartin Reinke
    • C10B39/02C10B39/00C10B39/04C10B39/14
    • C10B39/14C10B39/00
    • A coke quenching car comprises an open coke receptacle having a sloping bottom wall inclined toward one side, closely spaced vertical internal walls, a vertical side wall opposite the one side and end walls. All of the walls are formed with cooling fluid passages. The vertical side wall includes a coke discharge opening closed by a swingable L-shaped flap having a leg portion with a cooling fluid passage and a foot portion underhanging the bottom wall in a closed position. The foot portion is provided with aperatures for draining quench water from the receptacle when the flap is swung into a drain position. A fluid cooled slidable cover for the receptacle is provided.
    • PCT No.PCT / EP86 / 00147 Sec。 一九八六年十二月十七日 102(e)日期1986年12月17日PCT提交1986年3月15日PCT公布。 第WO86 / 05507号公报 日本1986年9月25日。焦炭淬火车包括开放焦炭容器,其具有朝向一侧倾斜的底壁,紧密间隔的垂直内壁,与一侧相对的垂直侧壁和端壁。 所有的壁都由冷却液通道形成。 垂直侧壁包括由可摆动的L形挡板封闭的焦炭排出口,其具有带有冷却流体通道的腿部分和在关闭位置下悬置于底壁的脚部分。 当翼片摆放到排放位置时,脚部设置有用于从容器排出骤冷水的温度。 提供了用于插座的流体冷却的可滑动盖。
    • 4. 发明授权
    • Process and apparatus for preheating coking coal
    • 预炼炼焦煤的工艺和设备
    • US4251207A
    • 1981-02-17
    • US14977
    • 1979-02-26
    • Kurt-Gu_nther BeckGeorg PollertWolfgang Rohde
    • Kurt-Gu_nther BeckGeorg PollertWolfgang Rohde
    • C10B57/10C10B57/08F26B3/08
    • C10B57/08
    • Coking coal is preheated and dried by passing hot carrier gas into a generally vertical flash drying pipe, then passing comminuted coal into the same pipe, the carrier gas being blown with a flow speed to move the coal upwards in the pipe and passing at about the midpoint of the pipe a mixture of hot combustion gases and additional hot recycle gas branched off from the other hot waste gas line into the pipe so as to cause further heating and moving of the coal, the further heating being carried out in a uniform and gentle manner. At the end of the pipe the coal and carrier gas are separated and the coal is recovered while the waste gas are recycled into a blower and therefrom into the vertical flash drying pipe with a branch leading part of the recycle gas into a mixing chamber with the combustion gases so as to lower the temperature of the combustion gases when the same are passed into the pipe.
    • 焦化煤通过将热载气通过一般垂直的闪蒸干燥管预热和干燥,然后将粉碎的煤通过相同的管道,载气以流速吹送,以使煤在管中向上移动, 管道的中点是将热燃气体和另一热废气管线分支的另外的热循环气体混合到管道中,以进一步加热和移动煤,进一步加热以均匀且平缓的方式进行 方式。 在管道的末端,煤和载气被分离并且煤被回收,而废气被再循环到鼓风机中并且从而进入垂直的闪蒸干燥管中,其中分支引导部分的再循环气体进入混合室 燃烧气体,以便当其通入管道时降低燃烧气体的温度。