会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明申请
    • Method for Controlling Longwall Operations with Incorporation of Air-Technology and Climate-Technology Resources
    • 通过合并气技技术和气候技术资源控制长壁作业的方法
    • US20110029138A1
    • 2011-02-03
    • US12918478
    • 2008-02-19
    • Martin JunkerWalter HermülheimDetlef RotherArmin Friederich
    • Martin JunkerWalter HermülheimDetlef RotherArmin Friederich
    • G05D23/19
    • E21F3/00E21C41/16E21F1/006
    • A method for controlling the extraction capacity of longwall operations in underground coal mining, including ascertaining the respective demand of the longwall operations, for air-technology and climate-technology resources, as influencing variables for a projected delivery quantity on the basis of data applicable to equipment of the longwall operations and to mineral deposit parameters, and storing the ascertained influencing variables in a computer as target data. Actual data for a raw coal delivery quantity, for air flowing through, for the supplied cooling capacity, and for the exhaust gas during running operation is detected and conveyed to the computer. if an increased demand for resources is recognized, coverage is initiated via a changeover of excess resources available at other longwall operations or if a reduced demand for resources is recognized, excess resources are rerouted to other longwall operations experiencing corresponding demand deficiencies.
    • 一种控制地下采煤长壁作业提取能力的方法,包括确定长城作业对空中技术和气候技术资源的各自需求,作为预测交付数量的影响因素,根据适用于 长壁操作的设备和矿床参数,并将确定的影响变量存储在计算机中作为目标数据。 检测并输送用于供给的制冷能力的空气和运行运转时的废气的原煤输送量的实际数据。 如果识别到对资源的​​需求增加,则通过切换在其他长墙操作中可用的多余资源来启动覆盖,或者如果识别到对资源的​​需求减少,则过多的资源被重新路由到经历相应的需求缺陷的其他长墙操作。
    • 2. 发明授权
    • Method for controlling longwall operations with incorporation of air-technology and climate-technology resources
    • 通过整合空气技术和气候技术资源来控制长城作业的方法
    • US08380345B2
    • 2013-02-19
    • US12918478
    • 2008-02-19
    • Martin JunkerWalter HermülheimDetlef RotherArmin Friederich
    • Martin JunkerWalter HermülheimDetlef RotherArmin Friederich
    • G06F19/00
    • E21F3/00E21C41/16E21F1/006
    • A method for controlling the extraction capacity of longwall operations in underground coal mining, including ascertaining the respective demand of the longwall operations, for air-technology and climate-technology resources, as influencing variables for a projected delivery quantity on the basis of data applicable to equipment of the longwall operations and to mineral deposit parameters, and storing the ascertained influencing variables in a computer as target data. Actual data for a raw coal delivery quantity, for air flowing through, for the supplied cooling capacity, and for the exhaust gas during running operation is detected and conveyed to the computer. If an increased demand for resources is recognized, coverage is initiated via a changeover of excess resources available at other longwall operations or, if a reduced demand for resources is recognized, excess resources are rerouted to other longwall operations experiencing corresponding demand deficiencies.
    • 一种控制地下采煤长壁作业提取能力的方法,包括确定长城作业对空中技术和气候技术资源的各自需求,作为预测交付数量的影响因素,根据适用于 长壁操作的设备和矿床参数,并将确定的影响变量存储在计算机中作为目标数据。 检测并输送用于供给的制冷能力的空气和运行运转时的废气的原煤输送量的实际数据。 如果认识到对资源的​​需求增加,则可以通过切换在其他长墙操作中可用的多余资源来启动覆盖,或者如果识别到对资源的​​需求减少,则会将过多的资源重新路由到其他遇到相应需求缺陷的长城操作。