会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Airflow management
    • 气流管理
    • US08290629B1
    • 2012-10-16
    • US11612114
    • 2006-12-18
    • Christopher Joseph MateskiDavid Wayne HaneyAndrew Lee Davey
    • Christopher Joseph MateskiDavid Wayne HaneyAndrew Lee Davey
    • G05B13/00
    • H05K7/20836Y10T137/0324
    • A method and system are provided for airflow management in a data center. The data center includes network elements, sensors, and heating, cooling and ventilation (HVAC) equipment. The sensors measure climate conditions in the data center and provide an airflow management system with measurements that are utilized to determine which areas in the data center violate data center temperature thresholds and require more air capacity. The airflow management system increases the airflow to areas that contribute to the violation by controlling HVAC equipment to increase air movement or by selecting other areas in the data center or external to the data center that have excess capacity and routing the excess capacity to the areas that contribute to the violation.
    • 为数据中心的气流管理提供了一种方法和系统。 数据中心包括网络元件,传感器,加热,制冷和通风(HVAC)设备。 传感器测量数据中心的气候条件,并为气流管理系统提供测量数据,以确定数据中心哪些区域违反数据中心温度阈值并需要更多的空气容量。 气流管理系统通过控制HVAC设备来增加空气流动或通过选择数据中心的其他区域或数据中心外部具有过剩容量并将过剩容量路由到区域,从而将气流增加到有助于违规的区域 有助于违规。
    • 6. 发明授权
    • Data center emergency power management
    • 数据中心应急电源管理
    • US08195340B1
    • 2012-06-05
    • US11612122
    • 2006-12-18
    • David Wayne HaneyChristopher Joseph MateskiAndrew Lee Davey
    • David Wayne HaneyChristopher Joseph MateskiAndrew Lee Davey
    • G05D17/00
    • H04L41/0833G06F1/30G06F11/143G06F11/2015Y04S40/162
    • A media, method, and data center power management system are provided to manage planned and unplanned data center power outages in a data center having network elements. During a planned outage, a remote device generates a request to simulate a power outage. The data center management system processes the request and suggests powering off one or more network elements based on a role associated with the network element and a measured power consumption associated with each network element. During an unplanned outage, the data center management system receives environmental data that triggers the generation of instructions to power off one or more network elements based on at least one of a calculated uptime associated with one or more backup generators, a role associated with each network element, and a power consumption associated with each network element.
    • 提供媒体,方法和数据中心电源管理系统来管理具有网络元件的数据中心中的计划和非计划的数据中心停电。 在计划停电期间,远程设备产生模拟停电的请求。 数据中心管理系统处理请求,并建议基于与网络元件相关联的角色和与每个网络元件相关联的测量的功率消耗来关闭一个或多个网络元件。 在计划外中断期间,数据中心管理系统接收环境数据,其触发产生指令以基于与一个或多个备用发生器相关联的计算的正常运行时间中的至少一个关闭一个或多个网络元件,与每个网络相关联的角色 元素和与每个网络元件相关联的功耗。