会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明申请
    • Calculation of state of charge offset using a closed integral method
    • 使用封闭积分法计算电荷补偿状态
    • US20060022643A1
    • 2006-02-02
    • US10903314
    • 2004-07-30
    • Ron BrostBruce Blakemore
    • Ron BrostBruce Blakemore
    • H02J7/00
    • G01R31/3648G01R31/006G01R31/3651H02J7/1461Y02T10/7005
    • A state of charge control system and method uses a region of voltage linearity and a long-term average voltage to estimate an average battery state of charge for storage batteries and to eliminate errors due to hysteresis, drift and sensor noncompliance. An average state of charge Sn is calculated using a current integral method and an average state of charge Sv based on an average observed voltage Vn for a time period exceeding a predefined minimum time but before a predefined maximum time has elapsed is also calculated. If the absolute value of the difference between the Sv and Sn are not are within an acceptable error band, then an offset value is calculated to correct the Sn by subtracting the Sv from the Sn, and thus, to maintain a more accurate Sn. Additionally, a closed current integral method is used to reduce errors due to hysteresis.
    • 充电控制系统和方法使用电压线性度和长期平均电压的区域来估计蓄电池的平均电池充电状态,并消除由滞后,漂移和传感器不合格引起的误差。 还计算出使用电流积分法计算平均状态电荷Sn,并且基于平均观测电压Vn超过预定的最小时间但在预定的最大时间过去之前的平均充电状态Sv。 如果Sv和Sn之间的差的绝对值不在可接受的误差带内,则计算偏移值以通过从Sn中减去Sv来校正Sn,从而保持更准确的Sn。 另外,使用闭合电流积分方法来减少由于滞后引起的误差。
    • 5. 发明授权
    • Calculation of state of charge offset using a closed integral method
    • 使用封闭积分法计算电荷补偿状态
    • US07233128B2
    • 2007-06-19
    • US10903314
    • 2004-07-30
    • Ron BrostBruce Blakemore
    • Ron BrostBruce Blakemore
    • H02J7/00H02H7/06
    • G01R31/3648G01R31/006G01R31/3651H02J7/1461Y02T10/7005
    • A state of charge control system and method uses a region of voltage linearity and a long-term average voltage to estimate an average battery state of charge for storage batteries and to eliminate errors due to hysteresis, drift and sensor noncompliance. An average state of charge Sn is calculated using a current integral method and an average state of charge Sv based on an average observed voltage Vn for a time period exceeding a predefined minimum time but before a predefined maximum time has elapsed is also calculated. If the absolute value of the difference between the Sv and Sn are not are within an acceptable error band, then an offset value is calculated to correct the Sn by subtracting the Sv from the Sn, and thus, to maintain a more accurate Sn. Additionally, a closed current integral method is used to reduce errors due to hysteresis.
    • 充电控制系统和方法使用电压线性度和长期平均电压的区域来估计蓄电池的平均电池充电状态,并消除由滞后,漂移和传感器不合格引起的误差。 还计算出使用电流积分法计算平均状态电荷Sn,并且基于平均观测电压Vn超过预定的最小时间但在预定的最大时间过去之前的平均充电状态Sv。 如果Sv和Sn之间的差的绝对值不在可接受的误差带内,则通过从Sn中减去Sv来计算偏移值来校正Sn,从而保持更准确的Sn。 另外,使用闭合电流积分方法来减少由于滞后引起的误差。