    • 1. 发明授权
    • Compensation method for structural deformation occurring during construction of super tall building
    • 超高层建筑施工过程中结构变形补偿方法
    • US08180588B2
    • 2012-05-15
    • US13194488
    • 2011-07-29
    • Taehun HaSungho LeeBohwan Oh
    • Taehun HaSungho LeeBohwan Oh
    • G01M5/00G01C25/00E04B1/98G06F19/00
    • G06F17/5004
    • The present invention relates to a compensation method for structural deformation occurring during construction of a super tall building, which includes the steps of: selecting horizontal and vertical members predicted to require compensation for horizontal and vertical deformation amounts; calculating deformation amounts based on the casting time of structural concrete for the selected horizontal or vertical members; determining compensation amounts based on the casting time of structural concrete for the selected horizontal or vertical members; calculating deformation amounts of the selected horizontal or vertical members up to and subsequent to the non-structural construction processes; determining compensation amounts by process of the selected horizontal or vertical members; and constructing the selected horizontal or vertical members by floors.
    • 本发明涉及一种在超高层建筑施工期间发生的结构变形的补偿方法,其包括以下步骤:选择预测要求水平和垂直变形量补偿的水平和垂直构件; 根据所选水平或垂直构件的结构混凝土的浇铸时间计算变形量; 根据所选水平或垂直构件的结构混凝土的施工时间确定补偿金额; 计算所述水平或垂直构件在非结构施工过程之前和之后的变形量; 通过所选择的水平或垂直成员的过程确定补偿金额; 并按地板构建选定的水平或垂直构件。
    • 2. 发明申请
    • COMPENSATION METHOD FOR STRUCTURAL DEFORMATION OCCURRING DURING CONSTRUCTION OF SUPER TALL BUILDING
    • 超级建筑施工期间结构变形的补偿方法
    • US20120036940A1
    • 2012-02-16
    • US13194488
    • 2011-07-29
    • Taehun HaSungho LeeBohwan Oh
    • Taehun HaSungho LeeBohwan Oh
    • G01M5/00
    • G06F17/5004
    • The present invention relates to a compensation method for structural deformation occurring during construction of a super tall building, which includes the steps of: selecting horizontal and vertical members predicted to require compensation for horizontal and vertical deformation amounts; calculating deformation amounts based on the casting time of structural concrete for the selected horizontal or vertical members; determining compensation amounts based on the casting time of structural concrete for the selected horizontal or vertical members; calculating deformation amounts of the selected horizontal or vertical members up to and subsequent to the non-structural construction processes; determining compensation amounts by process of the selected horizontal or vertical members; and constructing the selected horizontal or vertical members by floors.
    • 本发明涉及一种在超高层建筑施工期间发生的结构变形的补偿方法,其包括以下步骤:选择预测要求水平和垂直变形量补偿的水平和垂直构件; 根据所选水平或垂直构件的结构混凝土的浇铸时间计算变形量; 根据所选水平或垂直构件的结构混凝土的施工时间确定补偿金额; 计算所述水平或垂直构件在非结构施工过程之前和之后的变形量; 通过所选择的水平或垂直成员的过程确定补偿金额; 并按地板构建选定的水平或垂直构件。