会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Container capacity control system
    • 集装箱容量控制系统
    • US06359240B1
    • 2002-03-19
    • US09562838
    • 2000-05-01
    • Ivo DuttoAlfonso ArechagaAntonio AragonFrancisco José Colomino
    • Ivo DuttoAlfonso ArechagaAntonio AragonFrancisco José Colomino
    • G01G1300
    • G01F23/20B67C3/202G01F23/205
    • Container capacity control system, which is comprised of a first horizontal linear guide (3) where there is a clamp head (13), which can move horizontally and rotate on the horizontal plane and which holds a first clamp (1) and a second clamp (2) for the input and output of an empty container (b1) respectively; a second horizontal linear guide (4) where means for the total filling or predetermined partial filling move; some weighing scales (5), which weigh the container (b1) empty and totally full or partially full with the predetermined amount, sending the weight data to a microprocessor, which controls the programmed system, so that it distinguishes between full-to-the-brim containers and containers partially filled, calculating the capacity based on the weighing data.
    • 容器容量控制系统,其由具有夹头(13)的第一水平线性引导件(3)组成,其可水平移动并在水平面上旋转并且保持第一夹具(1)和第二夹具 (2)分别输入和输出空容器(b1); 第二水平线性引导件(4),其中用于总填充或预定部分填充移动的装置; 一些称重秤(5),其将容器(b1)称重为空且完全充满或部分满载预定量,将重量数据发送到控制编程系统的微处理器,以便区分完全到 - 容器和容器部分填充,根据称重数据计算容量。
    • 5. 发明授权
    • Glass melting furnace
    • 玻璃熔化炉
    • US06701751B2
    • 2004-03-09
    • US09881185
    • 2001-06-14
    • Alfonso ArechagaJesús María Ugarte
    • Alfonso ArechagaJesús María Ugarte
    • C03B524
    • C03B5/24
    • Glass melting furnace, of the type consisting of a melting chamber, inside which is found the liquid glass mass, with an outlet, and at least one flue gas recuperative chamber, a means for supplying the influx of fuel, featuring at least one mass temperature gauge immersed in the liquid glass mass and placed approximately at a height (h2) with respect to the bottom of the melting chamber of ⅓ to ⅕ of the height (h) of the level of the liquid glass mass, and ⅕ h≦h2≦⅓ h on the longitudinal axis of the melting chamber at a distance (11) with respect to the wall of the chamber opposite the outlet, of between 0.6 and 0.85 of the length of the melting chamber 0.6 l≦11≦0.85 l. For application in the manufacture of glass containers.
    • 玻璃熔化炉,由熔化室组成,其内部有液体玻璃块,带有出口,以及至少一个废气回收室,用于供应燃料流入的装置,具有至少一个质量温度 在液体玻璃块中浸入液体玻璃块中,并且相对于熔融室底部的高度(h2)设置在液体玻璃质量的高度(h)的1/3至1/5的高度(h2),并且1 在相对于出口相对于腔室的壁的距离(11)处在熔化室的纵向轴线上的熔融室长度的0.6至0.85之间的/ 5小时<= H2 <= 1/3小时 0.6 l <= 11 <= 0.85 L。用于制造玻璃容器。