会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • Filling-tube construction for providing a connection between a mould to be filled with molten metal and a mould-filling furnace
    • 填充管结构,用于在填充有熔融金属的模具和模具填充炉之间提供连接
    • US07134480B2
    • 2006-11-14
    • US10478371
    • 2001-05-31
    • Peter Møller IversenUffe Andersen
    • Peter Møller IversenUffe Andersen
    • B22D37/00
    • B22D35/04B22D18/04
    • In a filling-tube construction (1, 2) for providing a connection between a mould (6) to be filled with molten metal and a mould-filling furnace (3) containing molten metal (5), said mould (6) having at least one casting cavity (7), the lowermost part of each such cavity communicating with a filling duct (8), at least one end of which is open to the outside of said mould (6) and adapted to be temporarily connected to the filling-tube construction (1, 2) to receive molten metal (5) from the mould-filling furnace (3), the mould-filling furnace being adapted to contain molten metal (5) and to transfer said molten metal (5) under a controlled pressure through the filling-tube construction (1, 2) and to the filling duct (8), the filling-tube construction comprises a first section (1) extending from a position close to the bottom of said mould-filling furnace (3) up to an intermediate position closer to the filling duct (8) and at least one separate second section (2) providing a connection from the upper end of the first section (1) to the open end of the filling duct (8) and adapted to provide a fluid-tight connection to the upper end of the first section (1) and the open end of the filling duct (8). In this way an easy adjustment and/or exchange of parts of the filling-tube constructions can be provided by simply adjusting and/or exchanging the second section (2), without disassembly of the connection between the first section (1) and the mould-filling furnace (3). The invention also includes a method of modifying a conventional constructed filling tube to a filling tube as described above.
    • 在用于提供填充有熔融金属的模具(6)和含有熔融金属(5)的模具填充炉(3)之间的连接的填充管结构(1,2)中,所述模具(6)具有 至少一个铸造腔(7),每个这样的空腔的最下部分与填充管道(8)连通,其中至少一个端部向所述​​模具(6)的外部敞开,并且适于临时连接到填充物 (1)从铸模填充炉(3)接收熔融金属(5),模具填充炉适于容纳熔融金属(5),并将所述熔融金属(5)转移到一个 通过填充管结构(1,2)和填充管道(8)的控制压力,填充管构造包括从靠近所述模具填充炉(3)的底部的位置延伸的第一部分(1) )到达靠近填充管道(8)的中间位置和至少一个单独的第二位置 (2)提供从第一部分(1)的上端到填充管道(8)的开口端的连接,并且适于提供与第一部分(1)的上端的流体密封连接,以及 填充导管(8)的开口端。 以这种方式,可以通过简单地调整和/或更换第二部分(2)而不拆卸第一部分(1)和模具之间的连接来提供填充管结构的部分的容易的调整和/或更换 (3)。 本发明还包括如上所述将常规构造的填充管修改为填充管的方法。
    • 2. 发明授权
    • Transport system for a mould-string casting plant
    • 模具铸造厂的运输系统
    • US07032641B2
    • 2006-04-25
    • US10514496
    • 2002-05-16
    • Ole Anders JacobsenVagn Mogensen
    • Ole Anders JacobsenVagn Mogensen
    • B22C9/20
    • B22D33/005
    • In a transport system for a mould-string casting plant comprising a moulding machine (1) delivering a plurality of uniform mould parts (3) to a string of moulds on the transport system transporting the moulds from the moulding machine (1) to a pouring station (4) and further on to a solidification and cooling section (II, III, IV) and ending at a knock-out station in which the castings are taken out of the moulds (3), the transport system comprises in combination—a second section (II), in which the moulds (3) in the string are transported slidingly by means of movable longitudinal side rails (8) applying a positive lateral force on each side of the mould string (3) and moving in an advancing and longitudinal stepwise manner synchronised with the movement provided by the pressure plate (2) of the moulding machine (1), and—a third section (III), in which the transport is effected by means of a walling beam system (6, 7). In this way it is possible to provide a longer high-precision transport than possible when only using either side rail transport or walking beam transport.
    • 一种用于模具铸造设备的运输系统,包括一个模制机器(1),将多个均匀的模具部件(3)输送到运输系统上的模具系列上,该模具将模具从成形机(1)运送到浇注 站(4),并进一步处于凝固和冷却段(II,III,IV),并且在铸件从铸模(3)中取出的淘汰站结束,运输系统包括组合 第二部分(II),其中绳索中的模具(3)通过在模具串(3)的每一侧上施加正侧向力的可动纵向侧轨(8)滑动地运送并且在前进和 纵向逐步方式与由成型机(1)的压板(2)提供的运动同步的第三部分(III),其中通过壁梁系统(6,7)进行运输, 。 以这种方式,当仅使用侧轨运输或步进梁运输时,可以提供比可能的更长的高精度运输。
    • 3. 发明授权
    • Apparatus for producing casting mould parts
    • 铸模件生产设备
    • US06942008B1
    • 2005-09-13
    • US10239402
    • 2000-03-31
    • Ole Anders JacobsenVagn Mogensen
    • Ole Anders JacobsenVagn Mogensen
    • B22C11/10B22C21/10B22C15/08
    • B22C21/10B22C11/10
    • The present invention provides an apparatus for producing casting mould parts by compacting mould material between a first squeeze plate and a second squeeze plate forming movable end walls of a moulding chamber, which subsequent to the compacting can be opened by moving the second squeeze plate out of the way, after which the mould part can be pushed out of the moulding chamber by a further movement of the first squeeze plate in its compacting direction, the movement of the first squeeze plate being provided by a hydraulic drive unit comprising a movable cylinder member connected to the first squeeze plate and an associated stationary piston member having a piston rod extending tightly through an inner wall of the cylinder member and a piston. The movable cylinder member is guided in its linear movement by the piston and by the piston rod. By further providing supplementary means for guiding the movable cylinder member, it is possible to reduce the sag of the piston rod and cylinder member, when the cylinder member is advanced to the full extent to push out the produced mould part and improve the rigidity of the first squeeze plate against tilting movement during compacting.
    • 本发明提供了一种通过在第一挤压板和第二挤压板之间压实成形模具部件的装置,所述第一挤压板和第二挤压板形成成型室的可移动端壁,所述第二挤压板形成在模制室的可移动端壁之后,通过将第二挤压板移出 之后,通过第一挤压板在其压实方向上的进一步移动,模具部件能够被推出模制室,第一挤压板的运动由液压驱动单元提供,该液压驱动单元包括连接的可动缸构件 到第一挤压板和相关联的静止活塞构件,其具有紧密地延伸通过气缸构件的内壁的活塞杆和活塞。 可动气缸构件通过活塞和活塞杆的直线运动被引导。 通过进一步提供用于引导可动缸体的辅助装置,可以减小活塞杆和气缸构件的垂度,当气缸构件前进到最大程度以推出生产的模具部件并且提高活塞杆和缸体的刚性 第一挤压板在压实过程中反对倾斜运动。
    • 9. 发明授权
    • Method and apparatus for pouring several moulds in a mould-string plant in one pouring operation
    • 在一次浇注操作中将多个模具浇注在模具工厂中的方法和装置
    • US07270169B2
    • 2007-09-18
    • US10547747
    • 2003-12-11
    • Huseyin Erol ErginHenning Rahlf Nielsen
    • Huseyin Erol ErginHenning Rahlf Nielsen
    • B22C11/10B22D47/02
    • B22C11/10B22D33/005
    • In a method for pouring several moulds in a mould-string plant in the pouring operation, the moulds are produced by compression of sand or similar mould material in a pressing chamber comprising pattern plates 3, 4 for providing impressions in the surfaces of the mould parts for forming the mould cavities 11 and inlet runners 8. The moulds are advanced to a pouring track or guideway, on which the casting moulds are formed by positioning the mould parts close together and the advancement of the casting moulds is stepwise through a pouring station, in which the moulds are filled with molten metal. By providing at least one runner 7 for mutually connecting at least two inlet runners 8 for consecutive mould cavities 11, the mutually connected mould cavities can be filled through a single pouring inlet 8, and unused pouring inlets 8 may be plugged by a suitable plug 14 in order to minimise the amount of molten metal needed to fill the mould cavities 11.
    • 在浇注操作中用于将多个模具浇注在模具工厂中的方法中,通过在包括图案板3,4的挤压室中压缩沙子或类似的模具材料来生产模具,以在模具部件的表面中提供印模 用于形成模腔11和入口流道8。 模具推进到浇注轨道或导轨,通过将模具部件紧靠在一起而形成铸模,并且铸模的前进通过浇注站逐步进入,在浇注站中模具被熔融金属填充。 通过提供至少一个流道7,用于相互连接用于连续模具腔11的至少两个入口流道8,可以通过单个浇注入口8填充相互连接的模腔,并且未使用的浇注入口8可以由合适的塞子14堵塞 以便最小化填充模腔11所需的熔融金属的量。