会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 83. 发明授权
    • Systems and methods for automatic scheduling of a workforce
    • 自动安排员工队伍的系统和方法
    • US07672746B1
    • 2010-03-02
    • US11396063
    • 2006-03-31
    • Edward HamiltonJason FamaMike Bourke
    • Edward HamiltonJason FamaMike Bourke
    • G06F19/00
    • G06Q10/06G06Q10/063116G06Q10/06312G06Q10/103
    • Systems and methods are disclosed for scheduling overtime and time-off for a workforce. In one embodiment, the method comprises: receiving a workforce schedule including assignments of workers to shifts; receiving a template describing alterations to shifts; and applying schedulable objects to the workforce schedule in accordance with a workload forecast and schedule constraints. In one embodiment, the system comprises: a user interface and a scheduler. The user interface allows creation of shift alteration templates and associating templates with workers. The scheduler uses the shift alteration templates to modify an existing schedule of assignments of workers to shifts.
    • 披露了用于为工作人员安排加班和延期的系统和方法。 在一个实施例中,该方法包括:接收劳动者进度表,其中包括工作人员转移的分配; 收到描述变更变更的模板; 以及根据工作负载预测和调度约束将可调度对象应用于人力调度。 在一个实施例中,系统包括:用户界面和调度器。 用户界面允许创建换档更改模板并将模板与工作人员相关联。 调度程序使用班次变更模板来修改现有的工作人员转移时间表。