会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 71. 发明授权
    • Armrail release device for a collapsible playpen
    • 扶手释放装置,用于可折叠的幼儿围栏
    • US5978987A
    • 1999-11-09
    • US37501
    • 1998-03-10
    • Kun Wang
    • Kun Wang
    • A47D13/06A47D7/00
    • A47D13/063Y10T403/32409Y10T403/606
    • A playpen includes at least one pivot bracket including a first sidewall having two ends each defining a first through hole. At least one release bracket includes a first sidewall having two ends each defining a second through hole. A pressing member movably received in the release bracket includes two pressing legs. Two retaining legs are each formed on the second sidewall of the release bracket, and each is formed with a retaining hook. At least two armrails each has one end pivotally mounted in the pivot bracket and defining a third through hole. At least two V-shaped biasing members are each mounted in a respective armrail and each has its distal end abutting the pressing leg, and a stub extending through the third through hole, the first through hole and the second through hole.
    • 一个幼儿围栏包括至少一个枢转支架,其包括具有两个端部的第一侧壁,每个端部限定第一通孔。 至少一个释放支架包括具有两个端部的第一侧壁,每个端部限定第二通孔。 可移动地容纳在释放托架中的按压构件包括两个按压腿。 两个保持腿分别形成在释放支架的第二侧壁上,并且每个保持腿形成有保持钩。 至少两个扶手每个都具有枢转地安装在枢转支架中并且限定第三通孔的一端。 至少两个V形偏置构件分别安装在相应的扶手栏中,并且每个至少两个V形偏置构件的远端邻接按压脚,以及延伸穿过第三通孔,第一通孔和第二通孔的短截线。
    • 78. 发明授权
    • Method and system for analyzing parallelism of program code
    • 分析程序代码并行性的方法和系统
    • US09047114B2
    • 2015-06-02
    • US13613572
    • 2012-09-13
    • Bo FengRong YanKun WangHua Yong Wang
    • Bo FengRong YanKun WangHua Yong Wang
    • G06F11/34G06F9/45
    • G06F8/456
    • Methods and systems are provided for analyzing parallelism of program code. According to a method, the sequential execution of the program code is simulated so as to trace the execution procedure of the program code, and parallelism of the program code is analyzed based on the result of the trace to the execution procedure of the program code. Execution information of the program code is collected by simulating the sequential execution of the program code, and parallelism of the program code is analyzed based on the collected execution information, so as to allow programmers to perform parallel task partitioning of the program code with respect to a multi-core architecture more effectively, thus increasing the efficiency of parallel software development.
    • 提供了方法和系统来分析程序代码的并行性。 根据一种方法,模拟程序代码的顺序执行,以便跟踪程序代码的执行过程,并根据对程序代码的执行过程的跟踪结果来分析程序代码的并行性。 通过模拟程序代码的顺序执行来收集程序代码的执行信息,并且基于所收集的执行信息来分析程序代码的并行性,以便程序员能够相对于程序代码执行程序代码的并行任务划分 多核架构更有效,从而提高并行软件开发的效率。