会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 68. 发明申请
    • Method and device for manufacturing bellows tube
    • 波纹管制造方法及装置
    • US20050012249A1
    • 2005-01-20
    • US10496220
    • 2002-12-09
    • Hideki Kimura
    • Hideki Kimura
    • B29C48/32B29C33/30B29C48/30B29C48/90B29C48/92B29C49/00B29C49/04B29C49/78B29L23/18B29D23/18B29C33/24B29C53/30
    • B29C49/0021B29C33/308B29C48/001B29C48/09B29C48/13B29C48/30B29C48/303B29C48/92B29C49/04B29C49/78B29C2791/001B29C2791/006B29C2791/007B29C2948/9258B29C2948/92609B29C2948/92933B29K2021/00B29L2016/00B29L2023/18B29L2023/183
    • A bellows tube manufacturing method and a system for manufacturing bellows tubes enables composing new mold block trains for molding a bellows tube of a new pattern and sending the new mold block trains into a molding zone without requiring any preparatory operation and without stopping the bellows tube manufacturing system, and manufacturing bellows tubes at high productivity. Elemental mold blocks MBa, MBb, MBc and MBd necessary for composing a first mold block train 20 and a second mold block train 22 for forming elemental molds having molding surfaces conforming to the shape of a bellows tube to be manufactured are selected and arranged according to composition data specifying the numbers, types and order of arrangement of the elemental mold blocks MBa, MBb, MBc and MBd to compose the first mold block train 20 and the second mold block train 22, and the mold block trains 20 and 22 are moved into a molding zone 24. A molten resin is extruded into a space between the mold block trains 20 and 22 moving in the molding zone 24 through an extrusion die 25 by an extruder 26. The corresponding elemental mold blocks MB of the mold block trains 20 and 22 are clamped to form the elemental molds having cavities as the mold block trains 20 and 22 move in the same direction, and a negative pressure is produced in the cavities to mold a bellows tube. The elemental mold blocks MB of the mold block trains 20 and 22 returned from the molding zone 24 are sorted according to type.
    • 波纹管制造方法和用于制造波纹管的系统能够组成新的模块列车,用于模制新图案的波纹管,并将新的模块列车送入模制区域,而不需要任何预备操作,并且不停止波纹管制造 系统和制造波纹管,生产率高。 元件模块MBa,MBb,MBc和MBd组成第一模块组20所必需的模具块和第二模块组22,用于形成具有与要制造的波纹管形状一致的模制表面的元模具,根据 组成数据,指定组成第一模块组20和第二模块组22的元件模块MBa,MBb,MBc和MBd的排列的数量,类型和顺序以及模块组20和22移动到 模制区24.熔融树脂通过挤出机26挤出到在成型区24中通过挤出模具25移动的模块列20和22之间的空间中。相应的元件模块阻挡模块列20的MB和 22被夹紧以形成具有空腔的元模具,因为模块列20和22沿相同方向移动,并且在空腔中产生负压以模制波纹管。 从模制区24返回的模块列20和22的元模具块MB根据类型进行分类。