    • Process parameter estimation in controlling emission of a non-particulate pollutant into the air
    • 控制空气中非微粒污染物排放的过程参数估计
    • US20060045804A1
    • 2006-03-02
    • US11003336
    • 2004-12-06
    • Scott BoydenStephen Piche
    • Scott BoydenStephen Piche
    • G05D7/00
    • G05B13/027B01D2257/302B01D2257/404G05B13/048Y10T436/12
    • A parameter value estimator is provided for a process performed primarily to control emission of a particular non-particulate pollutant, such as NOx and SO2, into the air. The process has multiple process parameters (MPPs) including a parameter representing an amount of the particular non-particulate pollutant emitted. The parameter value estimator includes either a neural network process model or a non-neural network process model. In either case the model represents a relationship between one of the MPPs, other than the parameter representing the amount of the emitted particular non-particulate pollutant, and one or more other of the MPPs. Also included is a processor configured with the logic, e.g. programmed software, to estimate a value of the one MPP based on a value of each of the one or more other MPPs and the one model.
    • 为主要用于控制特定非微粒污染物(例如NO x和SO 2)的排放进入空气的过程提供了参数值估计器。 该过程具有多个过程参数(MPP),其包括表示特定非微粒污染物排放量的参数。 参数值估计器包括神经网络过程模型或非神经网络过程模型。 在任一情况下,该模型表示MPP之间的关系,而不是表示所发射的特定非微粒污染物的量的参数以及MPP中的一个或多个另外的MPP之间的关系。 还包括配置有逻辑的处理器,例如 基于一个或多个其他MPP和一个模型中的每一个的值来估计一个MPP的值。
    • 52. 发明申请
    • APC process control when process parameters are inaccurately measured
    • 过程参数不准确测量时的APC过程控制
    • US20060045803A1
    • 2006-03-02
    • US11002439
    • 2004-12-03
    • Scott BoydenStephen Piche
    • Scott BoydenStephen Piche
    • G05D7/00
    • G05B13/027B01D2257/302B01D2257/404G05B13/048Y10T436/12
    • A controller is provided for directing control of a process performed to control an amount of a pollutant emitted into the air. The process has multiple process parameters (MPPs) The controller includes either a neural network process model or a non-neural network process model. Whichever type model is included, it will represent a relationship between one of the MPPs and other of the MPPs. The controller also includes a control processor having the logic to determine the validity of a measured value of the one MPP based on the one model. The control processor directs control of the process in accordance with the measured value of the one MPP only if the measured value of the one MPP is determined to be valid. On the other hand, if the measured value is determined to be invalid, the control processor may direct control of the process in accordance with an estimated value of the one MPP.
    • 提供控制器用于引导控制执行的处理以控制排放到空气中的污染物的量。 该过程具有多个过程参数(MPP)。控制器包括神经网络过程模型或非神经网络过程模型。 无论哪种类型的模型都包含在内,它将代表一个MPP和其他MPP之间的关系。 该控制器还包括控制处理器,该控制处理器具有基于一个模型来确定一个MPP的测量值的有效性的逻辑。 只有当一个MPP的测量值被确定为有效时,控制处理器才根据一个MPP的测量值来指导该过程的控制。 另一方面,如果确定测量值无效,则控制处理器可以根据一个MPP的估计值来直接控制处理。
    • 55. 发明授权
    • System for optimizing power generating unit
    • 优化发电机组的系统
    • US08295953B2
    • 2012-10-23
    • US13293568
    • 2011-11-10
    • Stephen Piche
    • Stephen Piche
    • G05B13/02
    • H02J3/38F23N2023/40F23N2023/44H02J2003/007Y02E40/76Y02E60/76Y04S10/545Y04S40/22
    • A method and apparatus for optimizing the operation of a single or multiple power generating units using advanced optimization, modeling, and control techniques. In one embodiment, a plurality of component optimization systems for optimizing power generating unit components are sequentially coordinated to allow optimized values determined by a first component optimization system to be fed forward for use as an input value to a subsequent component optimization system. A unit optimization system may be provided to determine goals and constraints for the plurality of component optimization systems in accordance with economic data. In one embodiment of the invention, a multi-unit optimization system is provided to determine goals and constraints for component optimization systems of different power generating units. Both steady state and dynamic models are used for optimization.
    • 一种使用先进优化,建模和控制技术优化单个或多个发电机组的运行的方法和装置。 在一个实施例中,用于优化功率产生单元组件的多个组件优化系统被顺序地协调,以允许由第一组件优化系统确定的优化值被提前向用作后续组件优化系统的输入值。 可以提供单元优化系统以根据经济数据确定多个部件优化系统的目标和约束。 在本发明的一个实施例中,提供多单元优化系统以确定不同发电单元的部件优化系统的目标和约束。 稳态和动态模型均用于优化。
    • 56. 发明申请
    • APC PROCESS PARAMETER ESTIMATION
    • APC过程参数估计
    • US20110104015A1
    • 2011-05-05
    • US12917985
    • 2010-11-02
    • Scott A. BOYDENStephen Piche
    • Scott A. BOYDENStephen Piche
    • B01D53/48B01D53/56G06N3/02
    • G05B13/027B01D2257/302B01D2257/404G05B13/048Y10T436/12
    • A virtual analyzer is provided to estimate either an attribute of a reactant applied during performance of, or an amount of a reactant exhausted by, a process having multiple process parameters (MPPs) that is performed to control an amount of a pollutant emitted into the air. The virtual analyzer includes an interface which receives signals corresponding to attributes of the MPPs. If the process is a wet flue gas desulfurization (WFGD) process, the signals include a signal corresponding to a measured pH level of the applied reactant. If the process is a selective catalytic reduction (SCR) process, the signals include a signal corresponding to a measured amount of the reactant exhausted by the process.
    • 提供虚拟分析器以估计在执行过程中施加的反应物的属性,或由具有多个处理参数(MPP)的过程所排出的反应物的量的属性,所述过程参数(MPP)被执行以控制排放到空气中的污染物的量 。 虚拟分析器包括接收与MPP的属性对应的信号的接口。 如果该方法是湿式烟道气脱硫(WFGD)方法,信号包括对应于施加的反应物的测量的pH值的信号。 如果该方法是选择性催化还原(SCR)方法,信号包括对应于由该方法排出的反应物的测量量的信号。
    • 58. 发明授权
    • Model based optimization of multiple power generating units
    • 多发电机组的模型优化
    • US07844351B2
    • 2010-11-30
    • US12547558
    • 2009-08-26
    • Stephen Piche
    • Stephen Piche
    • G05D3/12G05B13/02
    • H02J3/38F23N2023/40F23N2023/44H02J2003/007Y02E40/76Y02E60/76Y04S10/545Y04S40/22
    • A method and apparatus for optimizing the operation of a single or multiple power generating units using advanced optimization, modeling, and control techniques. In one embodiment, a plurality of component optimization systems for optimizing power generating unit components are sequentially coordinated to allow optimized values determined by a first component optimization system to be fed forward for use as an input value to a subsequent component optimization system. A unit optimization system may be provided to determine goals and constraints for the plurality of component optimization systems in accordance with economic data. In one embodiment of the invention, a multi-unit optimization system is provided to determine goals and constraints for component optimization systems of different power generating units. Both steady state and dynamic models are used for optimization.
    • 一种使用先进优化,建模和控制技术优化单个或多个发电机组的运行的方法和装置。 在一个实施例中,用于优化功率产生单元组件的多个组件优化系统被顺序地协调,以允许由第一组件优化系统确定的优化值被提前向用作后续组件优化系统的输入值。 可以提供单元优化系统以根据经济数据确定多个部件优化系统的目标和约束。 在本发明的一个实施例中,提供多单元优化系统以确定不同发电单元的部件优化系统的目标和约束。 稳态和动态模型均用于优化。
    • 59. 发明授权
    • APC process control when process parameters are inaccurately measured
    • 过程参数不准确测量时的APC过程控制
    • US07698004B2
    • 2010-04-13
    • US11002439
    • 2004-12-03
    • Scott A. BoydenStephen Piche
    • Scott A. BoydenStephen Piche
    • G05B13/02G05B21/00G06F17/00G06F19/00G01N31/00B01D50/00B01D53/34B01D53/56B01D53/86B01D53/50C01B21/00F01N3/00
    • G05B13/027B01D2257/302B01D2257/404G05B13/048Y10T436/12
    • A controller is provided for directing control of a process performed to control an amount of a pollutant emitted into the air. The process has multiple process parameters (MPPs) The controller includes either a neural network process model or a non-neural network process model. Whichever type model is included, it will represent a relationship between one of the MPPs and other of the MPPs. The controller also includes a control processor having the logic to determine the validity of a measured value of the one MPP based on the one model. The control processor directs control of the process in accordance with the measured value of the one MPP only if the measured value of the one MPP is determined to be valid. On the other hand, if the measured value is determined to be invalid, the control processor may direct control of the process in accordance with an estimated value of the one MPP.
    • 提供控制器用于引导控制执行的处理以控制排放到空气中的污染物的量。 该过程具有多个过程参数(MPP)。控制器包括神经网络过程模型或非神经网络过程模型。 无论哪种类型的模型都包含在内,它将代表一个MPP和其他MPP之间的关系。 控制器还包括控制处理器,该控制处理器具有基于该模型确定一个MPP的测量值的有效性的逻辑。 只有当一个MPP的测量值被确定为有效时,控制处理器才根据一个MPP的测量值来指导该过程的控制。 另一方面,如果确定测量值无效,则控制处理器可以根据一个MPP的估计值来直接控制处理。
    • 60. 发明授权
    • Model predictive control of air pollution control processes
    • 空气污染控制流程模型预测控制
    • US07536232B2
    • 2009-05-19
    • US10927243
    • 2004-08-27
    • Scott A. BoydenStephen Piche
    • Scott A. BoydenStephen Piche
    • G05B13/02G05D7/00
    • G05B13/027B01D2257/302B01D2257/404G05B13/048Y10T436/12
    • A controller for directing operation of an air pollution control system performing a process to control emissions of a pollutant has multiple process parameters (MPPs). One or more of the MPPs is a controllable process parameter (CTPP) and one of the MPPs is an amount of the pollutant (AOP) emitted by the system. A defined AOP value (AOPV) represents an objective or limit on an actual value (AV) of the emitted AOP. The controller includes either a neural network process model or a non-neural network process model representing a relationship between each CTPP and the emitted AOP. A control processor has the logic to predict, based on the model, how changes to the current value of each CTPP will affect a future AV of emitted AOP, to select one of the changes in one CTPP based on the predicted affect of that change and on the AOPV, and to direct control of the one CTPP in accordance with the selected change for that CTPP.
    • 用于指挥执行控制污染物排放的过程的空气污染控制系统的操作的控制器具有多个过程参数(MPP)。 一个或多个MPP是可控制的过程参数(CTPP),其中一个MPP是系统发射的污染物(AOP)量。 定义的AOP值(AOPV)表示对发射的AOP的实际值(AV)的目标或限制。 控制器包括表示每个CTPP和发射的AOP之间的关系的神经网络过程模型或非神经网络过程模型。 控制处理器具有根据该模型预测如何对每个CTPP的当前值的变化将影响发射的AOP的未来AV的逻辑,以根据该变化的预测影响来选择一个CTPP中的一个变化, 在AOPV上,并根据该CTPP的选定变更直接控制一个CTPP。