会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 43. 发明授权
    • Transmission gate-based spin-transfer torque memory unit
    • 基于传输栅极的自旋转移转矩存储单元
    • US08416615B2
    • 2013-04-09
    • US13474839
    • 2012-05-18
    • Yiran ChenHai LiHongyue LiuYong LuYang Li
    • Yiran ChenHai LiHongyue LiuYong LuYang Li
    • G11C11/00
    • G11C11/1657G11C11/1659G11C11/1675Y10S977/935
    • A transmission gate-based spin-transfer torque memory unit is described. The memory unit includes a magnetic tunnel junction data cell electrically coupled to a bit line and a source line. A NMOS transistor is in parallel electrical connection with a PMOS transistor and they are electrically connected with the source line and the magnetic tunnel junction data cell. The magnetic tunnel junction data cell is configured to switch between a high resistance state and a low resistance state by passing a polarized write current through the magnetic tunnel junction data cell. The PMOS transistor and the NMOS transistor are separately addressable so that a first write current in a first direction flows through the PMOS transistor and a second write current in a second direction flows through the NMOS transistor.
    • 描述基于传输门的自旋转移转矩存储单元。 存储单元包括电耦合到位线和源极线的磁性隧道结数据单元。 NMOS晶体管与PMOS晶体管并联电连接,并且它们与源极线和磁性隧道结数据单元电连接。 磁隧道结数据单元被配置为通过使极化写入电流通过磁性隧道结数据单元在高电阻状态和低电阻状态之间切换。 PMOS晶体管和NMOS晶体管可单独寻址,使得第一方向上的第一写入电流流过PMOS晶体管,并且第二方向的第二写入电流流过NMOS晶体管。
    • 44. 发明申请
    • COLLABORATIVE GESTURE-BASED INPUT LANGUAGE
    • 基于合作语言的输入语言
    • US20130074014A1
    • 2013-03-21
    • US13237862
    • 2011-09-20
    • Yu OuyangYang Li
    • Yu OuyangYang Li
    • G06F3/033G06F15/16
    • G06F3/04883G06F3/0488
    • In one example, a method includes receiving, by a server, data representative of a group of gestures detected by the plurality of computing devices and data representative of one or more shortcuts associated with the group of gestures from a plurality of computing devices, wherein each shortcut corresponds to an action performed by at least one of the computing devices. The method may further include aggregating, by the server, the data representative of the gestures and the data representative of the associated shortcuts received from the plurality of computing devices based at least in part on detected similarities between at least one of 1) the group of gestures and 2) the associated shortcuts, and defining, by the server, a gesture-shortcut language based at least in part on the aggregated data.
    • 在一个示例中,方法包括由服务器接收表示由多个计算设备检测到的一组手势的数据和表示来自多个计算设备的与该组手势相关联的一个或多个快捷方式的数据,其中每个 快捷方式对应于由至少一个计算设备执行的动作。 所述方法还可以包括至少部分地基于所检测到的与所述多个计算设备中的至少一个之间的检测到的相似性来聚合代表所述手势的数据和表示从所述多个计算设备接收的相关联的快捷方式的数据 手势和2)相关联的快捷方式,并且由服务器至少部分地基于聚合数据来定义手势快捷语言。
    • 47. 发明授权
    • Heat dissipating apparatus
    • 散热装置
    • US08335082B2
    • 2012-12-18
    • US13095863
    • 2011-04-28
    • Hong-Zhi SunChen ChenYang Li
    • Hong-Zhi SunChen ChenYang Li
    • H05K7/20
    • G06F1/20
    • A heat dissipating apparatus comprises a cooler, an air duct, and a cooling fan. a cooler secured to a circuit board of a host; the cooler is secured to a circuit board of a host; the air duct, covers the cooler, comprises a side tray that is substantially perpendicular to the circuit board; the cooling fan is secured to the cooler and located on a side of the cooler, and adjacent to the side tray; a gap is defined between the side tray and the cooler, an air guiding board is located in the gap and extends towards a VRM that is secured to the circuit board, and the air guiding board is configured to direct air flowing towards the VRM.
    • 散热装置包括冷却器,风道和冷却风扇。 固定在主机电路板上的冷却器; 冷却器固定在主机的电路板上; 空气管道覆盖冷却器,包括基本垂直于电路板的侧托盘; 冷却风扇被固定到冷却器并且位于冷却器的一侧并且靠近侧托盘; 在侧托盘和冷却器之间限定了间隙,空气引导板位于间隙中并且朝向固定到电路板的VRM延伸,并且空气引导板被配置为引导朝向VRM流动的空气。
    • 50. 发明授权
    • Workflow scheduler
    • 工作流调度程序
    • US08078487B2
    • 2011-12-13
    • US11727843
    • 2007-03-28
    • Yang LiSimon Giles ThompsonNick GilesHamid Gharib
    • Yang LiSimon Giles ThompsonNick GilesHamid Gharib
    • G06Q10/00
    • G06Q10/06G06Q10/063G06Q10/0631G06Q10/063116G06Q10/06312G06Q10/06315G06Q10/06316G06Q10/1097
    • An interactive workflow schedule optimizer arranged to enable a user to reconfigure an instantiated workflow for a task comprising a plurality of actions having a predetermined dependency relationship to each other. The optimizer comprises means to input one or more user-specified constraint conditions into the workflow schedule optimizer; means to regenerate a workflow dependent on user specified condition from the instantiated workflow, the regenerated workflow satisfying said one or more user-specified constraint conditions. The optimizer optimises the global utilisation of the resources required to fulfil the user request by processing in parallel the resource requirements of each of said plurality of actions required by the regenerated workflow.
    • 交互式工作流程排定优化器被布置成使得用户能够为包括具有彼此具有预定依赖关系的多个动作的任务重新配置实例化的工作流。 优化器包括将一个或多个用户指定的约束条件输入到工作流调度优化器中的装置; 意味着根据用户指定的条件从实例化的工作流重新生成工作流,再生的工作流满足所述一个或多个用户指定的约束条件。 优化器通过并行处理由再生的工作流所需的所述多个动作中的每一个的资源需求来优化完成用户请求所需的资源的全局利用。