会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 31. 发明申请
    • Rotating Electric Machine and Method of Manufacturing Same
    • 旋转电机及其制造方法
    • US20140084713A1
    • 2014-03-27
    • US14117778
    • 2012-05-21
    • Yoshimi KuraharaKoji ObataShuya Hagiwara
    • Yoshimi KuraharaKoji ObataShuya Hagiwara
    • H02K3/30H02K15/02
    • H02K3/30H02K3/34H02K3/38H02K15/02H02K15/12Y10T29/49012
    • A rotating electric machine includes: a stator including a stator core, slots provided in the stator core at equal intervals along the circumferential direction, and coils placed in the stator slots and configured to generate a rotating magnetic field; and a rotor rotatably provided with a predetermined rotation gap between the stator core and the rotor, wherein the rotating electric machine further comprising a first varnish applied between the slots in the stator core and the coils for impregnation, and a second varnish applied directly onto enamel coating of the coils outside of the slots in the axial direction, the first varnish is a thermosetting varnish having a shear bond strength of a flat wire between the coils and the varnish is higher than that of the second varnish, and the second varnish is a thermosetting varnish having a glass transition temperature of approximately 104° C. or lower and the glass transition temperature of the second varnish by the DMA method is lower than that of the first varnish.
    • 旋转电机包括:定子,其包括定子芯,沿着圆周方向等间隔地设置在定子芯中的槽,以及设置在定子槽中并被配置为产生旋转磁场的线圈; 以及转子,其在所述定子铁芯和所述转子之间可旋转地设置有预定的旋转间隙,其中所述旋转电机还包括施加在所述定子铁心中的槽和用于浸渍的线圈之间的第一清漆,以及直接施加到搪瓷上的第二清漆 线圈在轴向外侧涂敷线圈,第一清漆是在线圈之间具有扁平线的剪切粘合强度的清漆,并且清漆比第二清漆的剪切粘合强度高,第二清漆是 玻璃化转变温度为约104℃以下,通过DMA法的第二清漆的玻璃化转变温度低于第一清漆的热固性清漆。
    • 34. 发明授权
    • Data multiplexer, data multiplexing method, and recording medium
    • 数据复用器,数据复用方法和记录介质
    • US07496675B2
    • 2009-02-24
    • US09824367
    • 2001-04-02
    • Koji ObataNoriaki OishiTomoyuki SatoHajime NittaKiyoshi Ota
    • Koji ObataNoriaki OishiTomoyuki SatoHajime NittaKiyoshi Ota
    • G06F15/16H06J3/24H06N7/12
    • H04N21/23406G11B20/10527H04N7/52H04N21/44004
    • FIG. 3B shows buffer occupancy rate of a transport stream buffer 21 when a TS packet is transferred to the transport stream buffer 21 having a transport rate Rt and a leak rate Rx. A time T1 during which the buffer occupancy rate of the transport stream buffer 21 increases and a time T2 during which the buffer occupancy rate of the transport stream buffer 21 decreases are expressed by (Rt−Rx)×T1=Rx×T2 and T1=(188×8)/Rt. A time T is T=T1+T2=(188×8)/Rx. Therefore, the time T is equal to a time T′ shown in FIG. 3C. Thus, when a TS packet is transferred in a cycle of the time T′, the transport stream buffer 21 will not overflow and the transport stream buffer 21 becomes empty at least once a second, whereby simulation for the transport stream buffer 21 is not required in the simulation for the T-STD model.
    • 图。 图3B示出了当TS分组被传送到具有传输速率Rt和泄漏速率Rx的传输流缓冲器21时的传输流缓冲器21的缓冲器占用率。 传输流缓冲器21的缓冲器占用率增加的时间T1和传输流缓冲器21的缓冲器占用率减小的时间T2由(Rt-Rx)xT1 = RxxT2和T1 =(188×8)表示, / Rt。 时间T为T = T1 + T2 =(188x8)/ Rx。 因此,时间T等于图1所示的时间T'。 3C。 因此,当在时间T'的周期中传送TS分组时,传输流缓冲器21将不会溢出,并且传输流缓冲器21至少一秒钟变空,由此不需要传输流缓冲器21的模拟 在T-STD模型的模拟中。
    • 37. 发明申请
    • INVERTER-DRIVEN ROTARY ELECTRIC MACHINE, PHASE-TO-PHASE INSULATION PARTIAL DISCHARGE INSPECTION METHOD AND PHASE-TO-PHASE INSULATION PARTIAL DISCHARGE INSPECTION APPARATUS
    • 逆变器旋转电机,相间绝缘部分放电检查方法和相间绝缘部分放电检查装置
    • US20140180617A1
    • 2014-06-26
    • US14112828
    • 2011-04-26
    • Koji Obata
    • Koji Obata
    • G01R25/00H02K3/00
    • G01R25/00G01R31/1272G01R31/343G01R31/346H02K3/00
    • A phase-to-phase insulation partial discharge inspection apparatus includes: an impulse power supply (1) configured to apply an impulse voltage having a voltage rise time period tr which satisfies an expression “tr>(τcoil·Vmax)/(PDIV)” to a rotary electric machine (2); a measurement section (12) configured to measure partial discharge which occurs when the impulse voltage is applied to the rotary electric machine (2); and a decision section (15) configured to determine that, when partial discharge is not measured by the measurement section (12), a phase-to-phase insulation performance is acceptable. In the expression, τcoil is a surge propagation time period of one coil of a rotary electric machine winding, PDIV a partial discharge inception voltage between winding turns, and Vmax a peak of a partial discharge testing voltage for the phase-to-phase insulation.
    • 一种相间绝缘部分放电检查装置,包括:脉冲电源(1),其配置为施加满足表达式“tr>(τcoil·Vmax)/(PDIV))的电压上升时间段tr的脉冲电压 旋转电机(2); 测量部分(12),其被配置为测量当所述脉冲电压施加到所述旋转电机(2)时发生的局部放电; 以及判定部(15),其被配置为确定当所述测量部(12)未测量到局部放电时,相间绝缘性能是可以接受的。 在表达式中,τcoil是旋转电机绕组的一个线圈的浪涌传播时间周期,PDIV是绕组匝之间的局部放电起始电压,Vmax是用于相间绝缘的局部放电测试电压的峰值。