会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 17. 发明申请
    • STORAGE SYSTEM AND OWNERSHIP CONTROL METHOD FOR STORAGE SYSTEM
    • 存储系统的存储系统和所有权控制方法
    • US20120005430A1
    • 2012-01-05
    • US12741482
    • 2010-04-21
    • Koji WatanabeToshiya SekiTakashi Sakaguchi
    • Koji WatanabeToshiya SekiTakashi Sakaguchi
    • G06F12/08
    • G06F3/064G06F3/0613G06F3/0622G06F3/0637
    • Access to various types of resources is controlled efficiently, thereby enhancing the throughput. A storage system includes: a disk device for providing a volume for storing data to a host system; a channel adapter for writing data from the host system to the disk device via a cache memory; a disk adapter for transferring data to and from the disk device; and at least one processor package including a plurality of processors for controlling the channel adapter and the disk adapter; wherein any one of the processor packages includes a processor for incorporatively transferring related types of ownership based on specific control information for managing the plurality of types of ownership for each of the plurality of types of resources.
    • 有效控制对各种资源的访问,从而提高吞吐量。 存储系统包括:磁盘设备,用于提供用于向主机系统存储数据的卷; 用于经由高速缓冲存储器将数据从主机系统写入磁盘设备的通道适配器; 用于向磁盘设备传送数据的磁盘适配器; 以及包括用于控制所述通道适配器和所述盘适配器的多个处理器的至少一个处理器包; 其中所述处理器包中的任何一个包括用于基于用于管理所述多种类型的资源中的每一种的多种所有权类型的特定控制信息来合并传送相关类型的所有权的处理器。
    • 18. 发明授权
    • Node device, packet control device, radio communication device, and transmission control method
    • 节点设备,分组控制设备,无线电通信设备和传输控制方法
    • US08068500B2
    • 2011-11-29
    • US11658594
    • 2005-07-28
    • Koji WatanabeYousuke Takahashi
    • Koji WatanabeYousuke Takahashi
    • H04L12/56
    • H04W28/06H04W4/18H04W80/00H04W88/06H04W88/08
    • A conventional node 3 divides an IP packet into data fragments and prepares a packet for RAN 9 transmission. There has been a problem that, since a RAN 6 cannot identify an IP packet unit, affinity is low relative to an IP network 1 that serves as a core. A node 3 prepares A10 packets by dividing an IP packet, and adds, to each A10 packet, a concatenation flag that indicates information stored in the A10 packet is the head or the tail of the IP packet. A base station 5 and a packet control device 4 employ the concatenation flag to control transmission for each IP packet unit. For example, a packet control device 4 employs a concatenation flag to discard information for a series of A10 packets received by the node, including information that constitutes the same IP packet.
    • 常规节点3将IP分组划分成数据片段并准备用于RAN 9传输的分组。 存在由于RAN 6无法识别IP分组单元的问题,相对于作为核心的IP网络1的亲和度较低。 节点3通过划分IP分组来准备A10分组,并且向每个A10分组添加指示存储在A10分组中的信息的级联标志是IP分组的头部或尾部。 基站5和分组控制装置4采用级联标志来控制每个IP分组单元的传输。 例如,分组控制装置4采用级联标志来丢弃由节点接收的一系列A10分组的信息,包括构成相同IP分组的信息。
    • 20. 发明申请
    • MOBILE COMMUNICATION SYSTEM AND ACCESS GATEWAY HAVING PLURAL USER PLANE AGWs
    • 移动通信系统和具有多用户平面设备的接入网关
    • US20100208653A1
    • 2010-08-19
    • US12625831
    • 2009-11-25
    • Yasutaka MORINAGAKoji Watanabe
    • Yasutaka MORINAGAKoji Watanabe
    • H04W40/00H04L12/56
    • H04W28/08H04W36/0016H04W80/04H04W88/182
    • In an access gateway (AGW) comprising a C-AGW for handling control messages and a plurality of U-AGWs for handling data packets, when a tunnel setup request is issued from one of base stations to hand over a mobile station, the C-AGW selects a new U-AGW being in the lowest load status out of the U-AGWs, estimates the load status of the new U-AGW in the case of changing the tunnel endpoint for the mobile station from a current U-AGW to the new U-AGW. The C-AGW designates the new U-AGW as the tunnel endpoint for the mobile station if the estimated load status satisfies a predetermined condition, but designates the current U-AGW as the tunnel endpoint if the estimated load status does not satisfy the predetermined condition.
    • 在包括用于处理控制消息的C-AGW的接入网关(AGW)和用于处理数据分组的多个U-AGW的情况下,当从基站之一发出隧道建立请求以移交移动台时,C- AGW选择在U-AGW中处于最低负载状态的新U-AGW,在将移动台的隧道端点从当前U-AGW更改为至少的情况下,估计新的U-AGW的负载状态 新的U-AGW。 如果估计的负载状态满足预定条件,则C-AGW将新的U-AGW指定为移动台的隧道端点,但是如果估计的负载状态不满足预定条件,则将当前的U-AGW指定为隧道端点 。