会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 11. 发明授权
    • Power system with method for adding multiple generator sets
    • 具有添加多台发电机组的方法的电力系统
    • US07656060B2
    • 2010-02-02
    • US11980344
    • 2007-10-31
    • Marcelo C. Algrain
    • Marcelo C. Algrain
    • H02J9/00
    • H02J3/42H02J3/48H02J3/50Y10T307/664Y10T307/68Y10T307/718
    • A method of operating a power system is provided. The power system has a plurality of generator sets and a bus. The method monitors the bus and generator sets disconnected from the bus. The method supplies to a control device information associated with the operating state of each of the generator sets and the bus. The method determines a relative frequency mismatch and a relative phase mismatch between the frequency and phase of the bus and a generator, and generates a frequency speed bias and a phase speed bias for the generator. The method adds the frequency and phase speed biases to form a total speed bias, tunes the total speed bias to make the frequency and phase speed biases combine in a complementary manner, and connects the generator to the bus when the voltage, frequency, and phase of the generator are within a permissible range of the bus.
    • 提供了一种操作电力系统的方法。 电力系统具有多个发电机组和总线。 该方法监视与总线断开的总线和发电机组。 该方法向控制装置提供与每个发电机组和总线的操作状态相关联的信息。 该方法确定总线和发生器的频率和相位之间的相对频率失配和相对相位失配,并且产生用于发电机的频率偏差和相位偏移。 该方法增加了频率和相位速度偏差,形成总速度偏置,调整总速度偏置,使频率和相位速度偏置互补结合,并将电压,频率和相位的发生器连接到总线 的发电机在公共汽车的允许范围内。
    • 12. 发明申请
    • Power system with method for adding multiple generator sets
    • 具有添加多台发电机组的方法的电力系统
    • US20090108676A1
    • 2009-04-30
    • US11980344
    • 2007-10-31
    • Marcelo C. Algrain
    • Marcelo C. Algrain
    • H02J3/42H02P9/00
    • H02J3/42H02J3/48H02J3/50Y10T307/664Y10T307/68Y10T307/718
    • A method of operating a power system is provided. The power system has a plurality of generator sets and a bus. The method monitors the bus and generator sets disconnected from the bus. The method supplies to a control device information associated with the operating state of each of the generator sets and the bus. The method determines a relative frequency mismatch and a relative phase mismatch between the frequency and phase of the bus and a generator, and generates a frequency speed bias and a phase speed bias for the generator. The method adds the frequency and phase speed biases to form a total speed bias, tunes the total speed bias to make the frequency and phase speed biases combine in a complementary manner, and connects the generator to the bus when the voltage, frequency, and phase of the generator are within a permissible range of the bus.
    • 提供了一种操作电力系统的方法。 电力系统具有多个发电机组和总线。 该方法监视与总线断开的总线和发电机组。 该方法向控制装置提供与每个发电机组和总线的操作状态相关联的信息。 该方法确定总线和发生器的频率和相位之间的相对频率失配和相对相位失配,并且产生用于发电机的频率偏差和相位偏移。 该方法增加了频率和相位速度偏差,形成总速度偏置,调整总速度偏置,使得频率和相位速度偏置互补结合,并将电压,频率和相位的发生器连接到总线 的发电机在公共汽车的允许范围内。
    • 17. 发明授权
    • Power system with method for adding multiple generator sets
    • 具有添加多台发电机组的方法的电力系统
    • US08198753B2
    • 2012-06-12
    • US12314878
    • 2008-12-18
    • Marcelo C. Algrain
    • Marcelo C. Algrain
    • H02J9/00
    • H02J3/42H02J3/005H02J3/46Y10T307/718Y10T307/735
    • A method of operating a power system is provided. The power system has a plurality of generator sets and a bus. The method monitors the bus and generator sets disconnected from the bus. The method supplies to a control device information associated with the operating state of each of the generator sets and the bus. The method determines a relative frequency mismatch, multiplied by a first weight factor, and a relative phase mismatch, multiplied by a second weight factor, between the frequency and phase of the bus and a generator, and generates a frequency speed bias and a phase speed bias for the generator. The method adds the frequency and phase speed biases to form a total speed bias and connects the generator to the bus when the voltage, frequency, and phase of the generator are within a permissible range of the bus.
    • 提供了一种操作电力系统的方法。 电力系统具有多个发电机组和总线。 该方法监视与总线断开的总线和发电机组。 该方法向控制装置提供与每个发电机组和总线的操作状态相关联的信息。 该方法确定在总线和发生器的频率和相位之间的相对频率失配乘以第一加权因子和乘以第二加权因子的相对相位失配,并且产生频率偏差和相位速度 发电机偏置。 当发电机的电压,频率和相位在总线的允许范围内时,该方法增加了频率和相位速度偏置以形成总速度偏置,并将发生器连接到总线。
    • 18. 发明授权
    • Stationary genset power system having turbo-compounding
    • 具有涡轮增压的固定发电机组动力系统
    • US08143732B2
    • 2012-03-27
    • US12314684
    • 2008-12-15
    • Marcelo C. Algrain
    • Marcelo C. Algrain
    • F02B37/00
    • F02B37/10B60K1/02B60Y2400/435F02B39/10F02B41/10F02B63/04Y02T10/144Y02T10/163Y10T307/718
    • A stationary genset power may have a combustion engine configured to produce a mechanical output, and a main generator driven by the combustion engine to convert a majority portion of the mechanical output to electricity directed to an external load. The stationary genset power system may also have a turbine fluidly connected to the combustion engine, a compressor operatively driven by the turbine to compress combustion air directed to the combustion engine, and a secondary generator operatively driven by the turbine to produce electricity directed to the external load. The stationary genset power system may further have a controller in communication with the primary and second generators. The controller may be configured to synchronize an electrical power output of the secondary generator with an electrical power output of the primary generator prior to connection of the secondary generator to the external load.
    • 固定的发电机组功率可以具有被配置为产生机械输出的内燃机,以及由内燃机驱动的主发电机,以将机械输出的大部分转换成指向外部负载的电力。 静态发电机组动力系统还可以具有流体地连接到内燃机的涡轮机,由涡轮机操作地驱动以压缩被引导到内燃机的燃烧空气的压缩机,以及由涡轮机操作地驱动以产生指向外部的电力的次级发电机 加载。 固定发电机组电力系统还可以具有与主发电机和第二发电机通信的控制器。 控制器可以被配置为在次级发生器连接到外部负载之前将次级发电机的电力输出与主发电机的电力输出同步。