会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 133. 发明申请
    • ROTATIONAL SPEED DETERMINATION
    • 转速测定
    • US20080303281A1
    • 2008-12-11
    • US12133768
    • 2008-06-05
    • Thomas Krueger
    • Thomas Krueger
    • F03D7/00G01P3/44
    • F03D7/042F03D17/00F05B2260/821F05B2270/327Y02E10/723
    • The invention relates to a method for the operation of a wind power plant (11) with a rotor (10) and a rotating apparatus (20, 22, 24) connected with the rotor (10), wherein a rotor speed (nR) and a rotating apparatus speed (n) are interrelated via a specifiable transmission ratio, wherein the rotating apparatus speed (n) is determined, and wherein a rotational speed measurement value (rpmi) is captured for the determination of the rotating apparatus speed (n). The method according to the invention is characterized in that the rotational speed measurement value (rpmi) is corrected with an intermittently variable correction value (rpmi,c) so that the determined rotating apparatus speed (rpmi,f) results, and wherein the determined rotating apparatus speed (rpmi,f) is fed as the actual value into a regulation apparatus (36) of the wind power plant (11).
    • 本发明涉及一种具有转子(10)和与转子(10)连接的旋转装置(20,22,24)的风力发电设备(11)的操作方法,其中转子速度(nR)和 旋转装置速度(n)经由可指定的传动比相互关联,其中确定旋转装置速度(n),并且其中捕获转速测量值(rpmi)用于确定旋转装置速度(n)。 根据本发明的方法的特征在于,以间歇可变校正值(rpmi,c)校正旋转速度测量值(rpmi),从而得到所确定的旋转设备速度(rpmi,f),并且其中确定的旋转 设备速度(rpmi,f)作为实际值被馈送到风力发电厂(11)的调节装置(36)中。
    • 134. 发明申请
    • Power Control of a Wind Park
    • 风力发电场的功率控制
    • US20080265577A1
    • 2008-10-30
    • US11995309
    • 2006-07-12
    • Jens FortmannJens AltemarkJorg Zeumer
    • Jens FortmannJens AltemarkJorg Zeumer
    • H02P9/04
    • F03D7/0284F03D7/028F03D9/255F03D9/257F05B2240/95F05B2240/96H02J3/16H02J3/1885H02J3/383H02J3/386H02P9/04Y02E10/563Y02E10/723Y02E10/763Y02E40/32Y02E40/34Y10T307/522
    • A method for regulating a wind energy installation including a rotor-driven generator, a converter connected to the generator, and a controller that regulates power emitted into an energy transmission system to within a limit value involves determining a maximum current value in a connection path, determining a current reserve value for power emitted into an energy transmission system, and determining a correction value for following a limit value of the emitted power from the maximum current value and the current reserve value. The wind energy installation and the method for its regulation also includes the use of a limitation device configured to set a phase angle between an emitted current and voltage of an electrical system in response to a selection signal in such a way that primarily active power or primarily reactive power is fed into the energy transmission system when the maximum current value is reached.
    • 一种用于调节包括​​转子驱动的发电机,连接到发电机的转换器和将发射到能量传输系统中的功率调节到限制值内的控制器的风能设备的方法包括确定连接路径中的最大电流值, 确定发射到能量传输系统的功率的当前储备值,以及根据最大电流值和当前储备值确定跟随发射功率的极限值的校正值。 风能装置及其调节方法还包括使用限制装置,该限制装置被配置成响应于选择信号来设置电气系统的发射电流和电压之间的相位角,使得主要有功功率或主要功率 当达到最大电流值时,无功功率被馈送到能量传输系统中。
    • 135. 发明申请
    • METHOD AND SYSTEM FOR REGULATION OF THE ROTATIONAL SPEED OF A ROTOR ON A WIND TURBINE
    • 用于调节风轮转子转速的方法和系统
    • US20080136188A1
    • 2008-06-12
    • US11960150
    • 2007-12-19
    • Thomas Krueger
    • Thomas Krueger
    • F03D7/04F03D9/00
    • H02P9/04F03D7/0276F03D7/042F03D9/25F03D9/255F05B2270/101F05B2270/1032F05B2270/20H02P9/305H02P2101/15Y02E10/723Y02E10/725
    • The invention relates to a method and a system for regulation of the rotational speed (52) of a rotor on a wind energy unit with a generator and a rotor blade. The first set parameter is a pitch angle (Pitch) of the rotor blade and the second set parameter is the torque of the generator. The system comprises a pitch angle control or regulation device (32), a torque control or regulation device (33), a first device for determination of a first rotational speed set value (28) (first rotational speed set value determination device (29)) and a second device (26) for determination of a second rotational speed set value (29) (second rotational speed set value determination device (26)). The first rotational speed set value (28) may be supplied to the pitch angle control or regulation device (32) and the second rotational speed set value (29) may be supplied to the torque control or regulation device (33), wherein the first and second rotational speed set value (28, 2)) may be different from each other.
    • 本发明涉及一种用于调节具有发电机和转子叶片的风能单元上的转子的转速(52)的方法和系统。 第一设定参数是转子叶片的桨距角(Pitch),第二设定参数是发电机的转矩。 该系统包括俯仰角控制或调节装置(32),转矩控制或调节装置(33),用于确定第一转速设定值(28)的第一装置(第一转速设定值确定装置) )和用于确定第二转速设定值(29)(第二转速设定值确定装置(26))的第二装置(26)。 第一转速设定值(28)可以提供给俯仰角控制或调节装置(32),第二转速设定值(29)可以被提供给转矩控制或调节装置(33),其中第一转速设定值 和第二转速设定值(28,2))可以彼此不同。
    • 137. 发明申请
    • Method for Optimizing the Operation of Wind Farms
    • 优化风电场运行的方法
    • US20070299548A1
    • 2007-12-27
    • US11667707
    • 2005-11-22
    • Roland Weitkamp
    • Roland Weitkamp
    • G05B13/02
    • F03D7/046F05B2240/96F05B2270/20F05B2270/335Y02E10/723
    • A method for optimizing the operation of wind energy installations includes operating target and reference wind energy installations to optimize the target installation first using a first set of operating parameters and then using a second set of operating parameters different from the first operating parameters, recording target variables for the target wind energy installation and recording reference results of the reference wind energy installation in each case for both sets of operating parameters, performing an automated evaluation of the target variables by calculation of a quality measure taking account of the reference results, and determining in an automated manner based on the automated evaluation which of the sets of operating parameters has better quality measure. Each wind installation includes comprise a rotor, a generator driven by the rotor to produce electrical energy, and a controller operating the wind energy installation on the basis of a set of operating parameters.
    • 一种用于优化风力设备运行的方法包括运行目标和参考风能装置,首先使用第一组运行参数优化目标设备,然后使用与第一运行参数不同的第二组运行参数,记录目标变量 针对目标风能安装和记录参考风能设备的参考结果,在每种情况下都适用于两组运行参数,通过计算参考结果的质量度量来执行目标变量的自动评估,并确定 基于自动评估的自动化方式,哪组操作参数具有更好的质量测量。 每个风力设备包括转子,由转子驱动以产生电能的发电机,以及基于一组操作参数操作风能设备的控制器。