会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 91. 发明授权
    • Permanent ventilation seal
    • 永久通风密封
    • US5385504A
    • 1995-01-31
    • US113860
    • 1993-08-30
    • David A. HusseyFred Stafford, III
    • David A. HusseyFred Stafford, III
    • E21F17/103E21F1/00E02D3/02E21F3/00
    • E21F17/103
    • A mine seal is provided in which two walls are constructed across the mine entry. One of the walls is constructed in layers. After a lower portion of the layered wall is erected, a first layer of gravel is provided between the walls. The gravel is then saturated with a binding material such as a polyurethane composition so that the binding material fills the voids between the gravel particles. Additional layers of gravel subsequently saturated with the binding material are provided until the gravel layer is equal in height to the lower portion of the layered wall. The layered wall is then further erected and the process continues until the layered wall is completely constructed and the binding material-saturated filler material emplaces the mine roof. Finally, the exposed surface of the exposed wall is coated with a sealant. Alternatively, the binding material and filler material can be pre-mixed and injected into the space between the two walls. If desired, binding material alone can be inserted between the two walls.
    • 提供了一个矿井密封件,其中在矿井入口处建造了两个墙壁。 其中一个墙壁是按层次构造的。 在分层壁的下部竖立之后,在壁之间设置第一层砾石。 然后用诸如聚氨酯组合物的粘合材料使砾石饱和,使得粘合材料填充砾石颗粒之间的空隙。 随后用粘合材料饱和的另外的砾石层被提供,直到砾石层的高度与分层壁的下部相等。 然后进一步竖立层状壁,并且该过程继续进行,直到层状壁完全构造,并且粘合材料饱和填充材料露出矿顶。 最后,暴露的壁的暴露表面涂上密封剂。 或者,可以将粘合材料和填充材料预混合并注入到两个壁之间的空间中。 如果需要,单独的粘结材料可以插入两个壁之间。
    • 95. 发明授权
    • Method of grouting a pile in a hole involving the optimized frequency of vibration of the grouting material
    • 在一个涉及灌浆材料振动优化的孔中灌浆的方法
    • US3898848A
    • 1975-08-12
    • US45575474
    • 1974-03-28
    • WYANT REECE E
    • WYANT REECE E
    • E02D3/054E02D3/12E02D5/00E02D15/00E02D3/02
    • E02D3/054E02D3/123E02D5/00E02D15/00
    • A pile is placed in an earth borehole which may or may not have a protective casing along at least a portion of its length. A predetermined amount of water is metered into the bottom of the hole in the annulus exterior to the pile and then dry sand is added to the water in the annulus. Alternatively, cement or other grouting materials are added to the hole around the pile. Various means are provided for vibrating either the pile or the external protective casing or the sand and water mixture itself or the other grouting material. To maximize the amplitude of vibration, the frequency of vibration is varied during the grouting process to match the ungrouted length of the pile, either by continuously varying the frequency of vibration or in steps along the length of the pile. The sand and water or other grouting mixture itself can be vibrated by one or more vibrating rods inserted into the mixture or by a multi-fingered sleeve which fits over the pile and into the annulus external to the pile. In some of the embodiments, the vibrated apparatus is removed while vibrating to successively compact the sand and water or other grouting mixture beginning at the bottom of the hole. When using a pipe pile, the bottom of the pipe pile can be plugged during the compaction of the sand and water or other grouting mixture and then removed if necessary. Dry sand is used as a ballast to prevent the pipe pile from floating when using a closed end.
    • 一堆堆放在地球钻孔中,沿着其长度的至少一部分可以具有或不具有保护性壳体。 将预定量的水计量到桩的外部的环形空间的底部的底部,然后将干燥的砂子添加到环空中的水中。 或者,将水泥或其他灌浆材料加入到桩周围的孔中。 提供了用于使桩或外部保护壳体或砂和水混合物本身或其他灌浆材料振动的各种装置。 为了使振动幅度最大化,在灌浆过程中振动的频率会随着桩的不变长度的变化而变化,通过连续地改变振动的频率或沿着桩的长度逐步变化。 沙子和水或其他灌浆混合物本身可以通过插入混合物中的一个或多个振动杆或者装配在桩上并进入桩外部的环的多指套筒振动。 在一些实施例中,振动的装置被移除,同时振动以连续地压缩从孔的底部开始的砂和水或其它灌浆混合物。 当使用管桩时,可以在砂和水或其他灌浆混合物的压实过程中堵塞管桩的底部,并在必要时将其去除。 干砂用作镇流器,以防止管桩在使用封闭端时浮动。