会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明授权
    • Multi-site disaster recovery mechanism for distributed cloud orchestration software
    • 用于分布式云编排软件的多站点灾难恢复机制
    • US09582379B2
    • 2017-02-28
    • US14305157
    • 2014-06-16
    • International Business Machines Corporation
    • Pradipta K. BanerjeeSudipta Biswas
    • G06F11/00G06F11/20
    • G06F11/203G06F11/2035G06F11/2048
    • Multi-site disaster recovery mechanism performed by the following steps: (i) providing a disaster recovery (DR) system that includes a plurality of sites where each site of the plurality of sites actively serves infrastructure-as-a-service to a set of tenant(s); (ii) for each site of the plurality of sites, determining the following characteristics of the site: workloads that require DR, workloads characteristics, tenants and capabilities; (iii) for each site of the plurality of sites, determining a plurality of associated sites; and (iv) on condition that a disaster occurs which impacts a first site of the plurality of sites, distributing a primary site workload of the first site across the associated sites of the first site. The determination of the plurality of associated sites associated with each site is based upon at least one of the following characteristics: capacity, workloads that require DR, workloads characteristics, tenants and/or capabilities.
    • 多站点灾难恢复机制通过以下步骤执行:(i)提供灾难恢复(DR)系统,其包括多个站点,其中多个站点的每个站点主动地服务于一组服务的基础设施服务 租客; (ii)对于多个站点的每个站点,确定站点的以下特征:需要DR,工作负载特性,租户和能力的工作负载; (iii)对于所述多个站点的每个站点,确定多个关联站点; 以及(iv)在发生影响多个站点的第一站点的灾害的情况下,将第一站点的主站点工作量分布在第一站点的相关站点。 与每个站点相关联的多个关联站点的确定基于以下特征中的至少一个:容量,需要DR的工作负载,工作负载特性,租户和/或能力。
    • 5. 发明授权
    • Optimization of workload placement
    • 优化工作量布局
    • US09417923B2
    • 2016-08-16
    • US14108701
    • 2013-12-17
    • International Business Machines Corporation
    • Ashish BilloreSudipta Biswas
    • G06F9/46G06F9/50
    • G06Q10/06316G06F9/5038G06F9/5083G06F2209/5021G06F2209/506
    • A computer manages methods for determining workload placement in a computing environment. The computer receives a plurality of workloads with associated information, wherein the associated information for each workload contains at least: contract information, billing information, and resource availability information. The computer determines a profitability factor for each workload of the plurality of workloads, wherein the profitability factor is at least based on the billing information. The computer determines a penalty factor for each workload of the plurality of workloads, wherein the penalty factor is at least based on the contract information. The computer determines a preference factor for each workload of the plurality of workloads, wherein the preference factor is at least based on the resource availability information. The computer assigns a priority ordering for each of the workloads from the plurality of workloads.
    • 计算机管理用于在计算环境中确定工作负载布局的方法。 计算机接收具有关联信息的多个工作负载,其中每个工作负载的关联信息至少包含:合同信息,计费信息和资源可用性信息。 所述计算机确定所述多个工作负载的每个工作负载的盈利能力因子,其中所述盈利因素至少基于所述计费信息。 计算机确定多个工作负载中的每个工作负荷的罚因子,其中惩罚因子至少基于合同信息。 所述计算机确定所述多个工作负载中的每个工作负荷的偏好因子,其中所述偏好因子至少基于所述资源可用性信息。 计算机为来自多个工作负载的每个工作负载分配优先顺序。
    • 8. 发明申请
    • OPTIMIZATION OF WORKLOAD PLACEMENT
    • 工作放置优化
    • US20150169366A1
    • 2015-06-18
    • US14108701
    • 2013-12-17
    • International Business Machines Corporation
    • Ashish BilloreSudipta Biswas
    • G06F9/48
    • G06Q10/06316G06F9/5038G06F9/5083G06F2209/5021G06F2209/506
    • A computer manages methods for determining workload placement in a computing environment. The computer receives a plurality of workloads with associated information, wherein the associated information for each workload contains at least: contract information, billing information, and resource availability information. The computer determines a profitability factor for each workload of the plurality of workloads, wherein the profitability factor is at least based on the billing information. The computer determines a penalty factor for each workload of the plurality of workloads, wherein the penalty factor is at least based on the contract information. The computer determines a preference factor for each workload of the plurality of workloads, wherein the preference factor is at least based on the resource availability information. The computer assigns a priority ordering for each of the workloads from the plurality of workloads.
    • 计算机管理用于在计算环境中确定工作负载布局的方法。 计算机接收具有关联信息的多个工作负载,其中每个工作负载的关联信息至少包含:合同信息,计费信息和资源可用性信息。 所述计算机确定所述多个工作负载的每个工作负载的盈利能力因子,其中所述盈利因素至少基于所述计费信息。 计算机确定多个工作负载中的每个工作负荷的罚因子,其中惩罚因子至少基于合同信息。 所述计算机确定所述多个工作负载中的每个工作负荷的偏好因子,其中所述偏好因子至少基于所述资源可用性信息。 计算机为来自多个工作负载的每个工作负载分配优先顺序。