会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • Solvent injection recovery process
    • 溶剂注射回收过程
    • US09115577B2
    • 2015-08-25
    • US13576956
    • 2011-02-03
    • Jostein AlvestadAurelie LagisquetEimund Gilje
    • Jostein AlvestadAurelie LagisquetEimund Gilje
    • E21B43/24C09K8/592
    • E21B43/24C09K8/592E21B43/2408
    • A process for the recovery of hydrocarbon such as bitumen/EHO from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps: preheating an area around and between the wells by circulating hot solvent through the completed interval of each of the wells until sufficient hydraulic communication between both wells is achieved; injecting one of more hydrocarbon solvents into the upper injection well at or above critical temperature of the solvent or solvent mixture, thereby causing a mixture of hydrocarbon and solvent to flow by gravity drainage to the lower production well; and producing the hydrocarbon to the surface through the lower production well.
    • 一种从含烃地层中回收烃类沥青/ EHO的方法,其中位于上部注入井和较低的生产井中,该方法包括以下步骤:通过循环热溶剂通过 每个井的完井间隔达到两井之间充分的液压连通; 在溶剂或溶剂混合物的临界温度或更高的温度下将更多的烃溶剂注入上部注入井中,从而使烃和溶剂的混合物通过重力排放流向下部生产井; 并通过较低的生产井将烃生产到表面。
    • 3. 发明申请
    • SOLVENT AND GAS INJECTION RECOVERY PROCESS
    • 溶剂和气体注入恢复过程
    • US20130025858A1
    • 2013-01-31
    • US13577120
    • 2011-02-03
    • Lars HøierJostein AlvestadAurelie LagisquetEimund Gilje
    • Lars HøierJostein AlvestadAurelie LagisquetEimund Gilje
    • E21B43/22
    • E21B43/24
    • A process for the recovery of hydrocarbon such as bitumen/EHO from a hydrocarbon bearing formation in which are situated an upper injection well and a lower production well, the method comprising the steps: preheating an area around and between the wells by circulating hot solvent through the completed interval of each of the wells until sufficient hydraulic communication between both wells is achieved; injecting one of more hydrocarbon solvents into the upper injection well at or above critical temperature of the solvent or solvent mixture, thereby causing a mixture of hydrocarbon and solvent to flow by gravity drainage to the lower production well; and producing the hydrocarbon to the surface through the lower production well. A non-condensable gas may be injected into the solvent chamber created by the hydrocarbon solvent.
    • 一种从含烃地层中回收烃类沥青/ EHO的方法,其中位于上部注入井和较低的生产井中,该方法包括以下步骤:通过循环热溶剂通过 每个井的完井间隔达到两井之间充分的液压连通; 在溶剂或溶剂混合物的临界温度或更高的温度下将更多的烃溶剂注入上部注入井中,从而使烃和溶剂的混合物通过重力排放流向下部生产井; 并通过较低的生产井将烃生产到表面。 可以将不可冷凝的气体注入由烃溶剂产生的溶剂室中。