    • 2. 发明公开
    • 제어봉제어계통 코일전류 감시장치를 이용한 제어봉 낙하시간 측정방법
    • 用于监测线控电流控制系统的装置和使用该方法测量控制线的下降时间的方法
    • KR1020120083756A
    • 2012-07-26
    • KR1020110005078
    • 2011-01-18
    • 한국수력원자력 주식회사
    • 정한영박승우신중진
    • G21C17/10G21C7/36
    • Y02E30/39
    • PURPOSE: A method for measuring falling time of a control rod using a monitoring apparatus of a control rod control system coil current is provided to acquire a current waveform flowing in a control rod coil by using a current sensor and a shunt resistance. CONSTITUTION: A power control box(100) applies a current for driving a control rod to a control rod coil(200). The control rod coil is installed around the control rod. The control rod coil includes a round up coil, a stationary coil, and a moving coil. A shunt resistance(300) includes a voltage measurement part(310) in order to measure a voltage of the shunt resistance. A current sensor(400) measures a current flowing in the control rod coil. A signal processor(500) amplifies a waveform according to the voltage applied to the shunt resistance and a current measured by a current sensor. The signal processor isolates a coil current monitoring analyzer(700) from the power control box. A signal pick-up controlling part(600) processes a pick-up signal.
    • 目的:提供一种使用控制棒控制系统线圈电流的监视装置来测量控制棒的下降时间的方法,以通过使用电流传感器和分流电阻来获取在控制棒线圈中流动的电流波形。 构成:功率控制箱(100)将用于驱动控制棒的电流施加到控制棒线圈(200)。 控制杆线圈安装在控制杆周围。 控制棒线圈包括圆形线圈,固定线圈和动圈。 分流电阻(300)包括电压测量部(310),以测量分流电阻的电压。 电流传感器(400)测量在控制棒线圈中流动的电流。 信号处理器(500)根据施加到分流电阻的电压和由电流传感器测量的电流放大波形。 信号处理器将线圈电流监测分析仪(700)与功率控制盒隔离。 信号拾取控制部(600)处理拾取信号。
    • 3. 发明授权
    • 제어봉의 낙하 시간을 측정하기 위한 방법 및 컴퓨터 판독 가능한 기록 매체
    • 用于测量下降时间的方法和计算机可读记录介质
    • KR101104875B1
    • 2012-01-17
    • KR1020090072043
    • 2009-08-05
    • 한국수력원자력 주식회사
    • 신호철배성만박문규박동환
    • G21C7/00G21C7/36G21C17/10
    • Y02E30/39
    • 본 발명은 원자력발전소의 계획 예방정비 기간 중 원자로 보증정지 상태에서 원자로 비상정지 명령에 따라 제어봉의 낙하 속응성이 기술지침서의 제한치 이내에 있는지를 확인하여 측정 신뢰도를 높이는 제어봉의 낙하시간 측정 방법 및 컴퓨터 판독 가능한 기록 매체가 개시된다. 본 발명에 따르면, 원자력 발전소 원자로내의 제어봉 제어계통의 제어봉 낙하시간 분석에 있어, 자성체인 제어봉 구동축이 원자로 내부로 낙하하는 동안 제어봉 구동장치 내의 이동 권선을 통과할 때 유도되는 기전력 신호를 다해상도 웨이블릿 변환을 이용하여 신호가 지닌 웨이블릿 함수와 스케일 함수로 분리하여 근사 계수와 상세 계수를 시간 축으로 표현하고, 웨이블릿의 스케일이 변하는 불연속선 분리 특성과 노이즈 제거 특성을 이용하여 제어봉 낙하 시작점과 종료점을 탐색하여 자동으로 제어봉 낙하시간을 정밀하게 분석 가능하게 하는 제어봉의 낙하시간 측정 방법 및 그 방법을 실행하기 위한 컴퓨터 프로그램을 기록한 컴퓨터 판독 가능한 기록 매체가 제공된다.
      제어봉, 웨이블릿, 스케일, 근사 계수, 상세 계수, 낙하 시점
    • 5. 发明授权
    • 온라인을 이용한 가압 중수형 원자로의 국부과출력보호를 제공하기 위한 방법 및 시스템
    • 方法和系统,用于提供在线使用的区域过热保护
    • KR100982215B1
    • 2010-09-14
    • KR1020080107786
    • 2008-10-31
    • 한국전력공사
    • 이은기김용배박동환최훈차균호
    • G21C7/36G21C17/00
    • Y02E30/39
    • 가압 중수형 원자로의 노심에서 발생할 수 있는 국부지역의 출력과다(국부과출력)로 핵연료가 손상되는 것을 방지하기 위하여 온라인을 이용한 가압 중수형 원자로의 국부과출력보호를 제공하기 위한 방법 및 시스템이 개시된다. 본 발명에 따르면, 2초마다 원자로 노심상태에 대응하는 국부과출력보호를 위한 정지설정치를 계산하여 ROP 시스템에 제공하거나 계측기 교정값을 제공할 수 있다. 이를 위해 노심상태를 핵설계에 준하여 계산하되 노심상태를 반영하기위한 각종 측정자료를 경계조건으로 하는 핵설계 및 열수력 설계가 가능하며, 실측 정보를 사용하기 위한 국부과출력보호의 정지설정치 평가 방법을 제공한다. 아울러 디지털형식으로 계산된 값을 ROP 시스템이나 계측기 교정시스템에 제공하기 위한 디지털-아날로그 변환기도 개별 계측기마다 구성될 수 있다.
      이에, 본 발명은 정상운전 중인 가압 중수로에 적용하는 경우 국부과출력보호 정지설정치를 최소 5%이상 향상 시킬 수 있고 경년열화 가압중수로의 경우 전출력운전 불가 시기를 늦춰 발전소 이용율 증대와 경제성을 향상시킬 수 있으며, 경년열화가 진행되지 않은 중수로의 경우도 핵연료교체시 불필요한 출력 감발을 회피할 수 있어 경제성 이익을 도모할 수 있다.
      가압중수로, 국부과출력 보호, 온라인 감시, 실시간 감시, 계측기, 계측기 교정,
    • 6. 发明授权
    • 원자력 발전소 안전 계통의 유지보수 및 테스트 패널 장치
    • 원자력발전소안전계통의유지보수및테스트패널장장
    • KR100928564B1
    • 2009-11-25
    • KR1020070105254
    • 2007-10-18
    • 삼창기업 주식회사
    • 이창규김성종박동철손창호김중선이상용
    • G21C7/36G21C17/00
    • Y02E30/39
    • 본 발명은 원자력 발전소 안전 계통의 유지 및 테스터 패널(MTP:Maintenance and Test Panel) 장치에 관한 것으로서, 본 발명은 터치패널과; 상기 터치패널에 입력된 아날로그신호를 디지털 데이터 신호로 변환하여 처리하는 터치감지부와; 상기 터치패널에 대한 구동과 상기 터치감지부에서 제공되는 데이터를 처리하는 터치 제어 모듈과; 상기 터치 제어 모듈에 연결되고, 상기 터치 제어 모듈에서 처리된 데이터를 전송하는 제1광통신 모듈과; 상기 제1광통신 모듈로부터 데이터를 수신하는 제2광통신 모듈과; 상기 상기 제2광통신 모듈에 연결되고, 상기 제2광통신 모듈에 수신된 데이터를 PCI 슬롯을 통해 RTOS 기반으로 안정되게 입출력하며, 다양한 확장성을 가지는 인터페이스 카드와; 상기 인터페이스 카드에 연결되고, 상기 인터페이스 카드로부터 전송된 데이터를 처리하고, 디스플레이부가 구동되도록 제어하는 제어부; 및 상기 제어부에서 처리된 데이터에 대한 GUI(Grapic User Interface) 설계화면을 표시하는 디스플레이부를 포함하여 이루어지는 것이다.
      테스터 패널(MTP), 터치감지부, 터치 제어 모듈, 광통신 모듈, 인터페이스 카드, GUI(Grapic User Interface)
    • 提供核电站安全系统中的维护和测试面板设备,通过使用基于PCI(外设部件互连)总线的光通信,快速传输数据。 触摸检测器(20)将输入到触摸面板(10)的模拟信号转换为数字数据信号。 触摸控制模块(30)处理触摸面板的驱动和触摸检测器的数据。 第一光通信模块(40)发送在触摸控制模块中处理的数据。 第二光通信模块(50)从第一光通信模块接收数据。 接口卡(60)连接到第二光通信模块。 接口卡基于RTOS(实时操作系统)通过PCI插槽输入和输出在第二个光通信模块中接收到的数据。 控制器(70)处理从接口卡发送的数据。 显示单元(80)显示在控制器中处理的数据的GUI(图形用户界面)设计显示。
    • 8. 发明公开
    • 원자력 발전소 안전 계통의 유지보수 및 테스트 패널 장치
    • 核电厂安全系统维护和测试面板设备
    • KR1020090039541A
    • 2009-04-22
    • KR1020070105254
    • 2007-10-18
    • 삼창기업 주식회사
    • 이창규김성종박동철손창호김중선이상용
    • G21C7/36G21C17/00
    • Y02E30/39
    • A maintenance and test panel apparatus in a safety system of a nuclear plant is provided to transmit data quickly by using the PCI(Peripheral Component Interconnect) bus based optical communication. A touch detector(20) converts an analog signal inputted to a touch panel(10) into a digital data signal. A touch control module(30) processes the driving of the touch panel and the data of the touch detector. A first optical communication module(40) transmits data processed in the touch control module. A second optical communication module(50) receives data from the first optical communication module. An interface card(60) is connected to the second optical communication module. The interface card inputs and outputs data received in the second optical communication module through a PCI slot based on an RTOS(Real Time Operating System). A controller(70) processes data transmitted from the interface card. A display unit(80) displays the GUI(Graphic User Interface) design display for data processed in the controller.
    • 提供核电站安全系统中的维护和测试面板装置,通过使用基于PCI(外围组件互连)总线的光通信来快速传输数据。 触摸检测器(20)将输入到触摸面板(10)的模拟信号转换为数字数据信号。 触摸控制模块(30)处理触摸面板的驱动和触摸检测器的数据。 第一光通信模块(40)发送在触摸控制模块中处理的数据。 第二光通信模块(50)从第一光通信模块接收数据。 接口卡(60)连接到第二光通信模块。 接口卡通过基于RTOS(实时操作系统)的PCI插槽输入和输出在第二光通信模块中接收的数据。 控制器(70)处理从接口卡发送的数据。 显示单元(80)显示用于在控制器中处理的数据的GUI(图形用户界面)设计显示。
    • 9. 发明公开
    • 현장기기연계모듈
    • 组件接口模块
    • KR1020090022929A
    • 2009-03-04
    • KR1020070088629
    • 2007-08-31
    • 두산중공업 주식회사
    • 조창호이성진김성태구영호임성한김봉석이관중
    • G21C7/36G21D3/04G21C7/00
    • Y02E30/39
    • A device interface module is provided to prevent bad effect in operation of a power plant by rapidly managing malfunction of devices related to safety. A device interface module(100) comprises a hardware-based processor(121, 122) and an interface controller(110). The hardware-based processor calculates a control signal by performing a control logic for driving a device(170) based on an operation signal inputted from an operation control device(160). The interface controller receives an operation signal from the operation control device or a device condition signal from the device. The interface controller outputs a control signal calculated by the hardware-based processor into the device or outputs a device condition signal received from the device into the operation control device. The operation control device includes a loop controller(162), a diverse protection system(164), a diverse manual ESF actuation switch(166), and an auxiliary controller(168).
    • 提供了一种设备接口模块,通过快速管理与安全相关的设备故障,防止发电厂运行中的不良影响。 设备接口模块(100)包括基于硬件的处理器(121,122)和接口控制器(110)。 基于硬件的处理器基于从操作控制装置(160)输入的操作信号,执行用于驱动装置(170)的控制逻辑来计算控制信号。 接口控制器从操作控制装置接收操作信号或从设备接收设备状态信号。 接口控制器将由基于硬件的处理器计算出的控制信号输出到设备中,或者将从设备接收的设备状态信号输出到操作控制设备中。 操作控制装置包括环路控制器(162),多样化保护系统(164),多样化的手动ESF致动开关(166)和辅助控制器(168)。
    • 10. 发明授权
    • 독립적 이중화 구조 리던던시를 갖는 디지털 원자로보호계통 및 그 방법
    • 독립적이중화구조리던던시를갖는디지털원자로보호계통및그방독립적
    • KR100875467B1
    • 2008-12-22
    • KR1020060122449
    • 2006-12-05
    • 한국원자력연구원
    • 이철권허섭김동훈황인구박기용이현철이동영최종균김창회
    • G21D3/04G21C7/36G21D3/00G21C7/00
    • Y02E30/39
    • A programmable logic controller based digital reactor protection system with an independent double structure redundancy per a channel and a method thereof are provided to improve stability and reliability of a nuclear power plant so as to maintain the nuclear power plant in a safety state and to prevent radioactive rays and radioactive materials from being leaked to the outside. A programmable logic controller based digital reactor protection system with an independent double structure redundancy per a channel includes four channels(200) of a redundancy structure which operates independently. Each channel includes a first group and a second group. The first group includes a first bistable processor(201a) among double bistable processors and a first coincidence processor(202a) among double coincidence processors. The second group includes a second bistable processor(201b) among the dual bistable processors and a second coincidence processor(202b) among the dual coincidence processors. The first and second bistable processors generate trip signals by comparing input signals with a predetermined stored trip set value on the basis of a plurality of sensing signals indicating states of reactor systems. The first and second coincidence processors generate a final trip signal by performing 2/4 logic compounding of the trip signals outputted from the bistable processors of a corresponding group among the four channels. A reactor is stopped by driving a reactor trip breaker or engineered safety features are operated by driving an engineered safety features-component control system according to the final trip signal by independent operation of the first and second groups of the redundancy structure in each channel.
    • 提供了一种基于可编程逻辑控制器的数字电抗器保护系统,每个通道具有独立的双重结构冗余及其方法,以提高核电站的稳定性和可靠性,从而保持核电站处于安全状态并防止放射性 射线和放射性物质泄漏到外面。 基于可编程逻辑控制器的数字电抗器保护系统每个通道具有独立的双重结构冗余,包括独立工作的冗余结构的四个通道(200)。 每个频道包括第一组和第二组。 第一组包括双重双稳态处理器中的第一双稳态处理器(201a)和双重重合处理器中的第一重合处理器(202a)。 第二组包括双重双稳态处理器中的第二双稳态处理器(201b)和双重重合处理器中的第二重合处理器(202b)。 第一和第二双稳态处理器基于指示反应堆系统的状态的多个感测信号,通过将输入信号与预定存储的跳闸设定值进行比较来产生跳闸信号。 第一和第二一致处理器通过对四个通道中对应组的双稳态处理器输出的跳闸信号进行2/4逻辑复合来产生最终跳闸信号。 通过驱动反应堆跳闸断路器来停止反应堆,或通过独立操作每个通道中的第一组和第二组冗余结构,根据最终跳闸信号驱动设计的安全特征组件控制系统来操作设计的安全特征。