会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明授权
    • 볼타입케이싱 및 자동공기조절장치와 입도조정골재를 이용한 해상 연약지반 개량공법
    • KR102288513B1
    • 2021-08-10
    • KR1020210006371
    • 2021-01-15
    • E02D3/12E02D3/08E02D3/046
    • 본발명은, 볼타입케이싱및 자동공기조절장치를구비한입도조정골재컴팩션파일장치(100)를이용하여연약지반내부에다짐말뚝을형성하는해상연약지반개량공법에있어서, 자동위치결정시스템(200)을이용하여, 볼타입케이싱파이프(130)의관입위치를결정하는측량공정(S100); 자동공기조절장치(300)를가동하여볼타입케이싱파이프(130) 내부의공기압을기설정된압력으로유지하면서, 볼타입케이싱파이프(130)를하강시키는관입공정(S200); 상기볼타입케이싱파이프(130) 내부에입도조정골재를투입하는투입공정(S300); 상기자동공기조절장치(300)를지속적으로작동시켜볼타입케이싱파이프(130) 내부의공기압을기설정된압력으로유지하면서, 볼타입케이싱파이프(130)를일정높이상승시키는인발공정(S400); 상기관입공정(S200) 내지인발공정(S400)을반복실행하여입도조정골재투입과입도조정골재다짐을통해입도조정골재다짐말뚝을형성하는반복공정(S500);을포함하되, 상기관입공정(S200), 투입공정(S300), 인발공정(S400) 및반복공정(S500)이진행되는동안, 관입심도센서(330)에의해상기볼타입케이싱파이프(130)의심도가측정되며, 상기관입심도센서(330)에의해측정된볼타입케이싱파이프(130) 선단의관입심도에따라, 공기압측정센서(380) 및상기자동공기조절장치(300)에의해상기볼타입케이싱파이프(130) 내부의공기압이기설정된압력으로유지되고, 상기관입공정(S200), 투입공정(S300), 인발공정(S400) 및반복공정(S500)이진행되는동안유지되는기설정공기압은, 상기볼타입케이싱파이프(130)의선단위치를기준으로, 지표면~20m, 21m~30m, 31m~40m, 41m~50m, 51m~60m, 61m~70m의구간으로분류하여관입심도가깊어질수록순차적으로증가되며, 상기입도조정골재는쇄석, 자갈, 콘크리트쇄석, 석분, 모래, 고로슬래그중 적어도하나이상을포함하는것을특징으로하는볼타입케이싱및 자동공기조절장치와입도조정골재를이용한해상연약지반개량공법에관한것이다.
    • 4. 发明授权
    • PC강연선을 이용한 지반보강장치 및 지반보강공법
    • 使用PC双绞线加强接地的装置和方法
    • KR101346635B1
    • 2014-01-02
    • KR1020110064398
    • 2011-06-30
    • 나현주
    • 나현주
    • E02D17/20E02D5/80E02D3/12E02D3/08E02D5/54E02D5/58
    • 본 발명은 PC강연선을 이용한 지반보강장치에 관한 것으로, 탄성과 유연성이 우수한 PC 강연선을 이용하여 가볍고 작업이 용이한 것은 물론 PC 강연선의 재료상의 특성 및 탄성력을 이용한 정착기술을 통해 지반 처짐이나 붕괴에 대한 위험을 줄여 지반보강 효율을 향상시켜 주고, 천공홀의 직경이 커 다수의 PC강연선을 설치해야 할 경우 간격유지수단을 이용하여 천공홀의 직경에 맞게 다수의 PC강연선의 간격을 일정하게 유지하면서 일체로 연결한 후 설치함으로써 천공홀 내에서 PC강연선이 일방향으로 치우치지 않으면서 충전재와 일체화 되어 지반 보강 효율이 향상될 수 있도록 하는 PC강연선을 이용한 지반보강장치를 제공함에 있다.
      상기 목적 달성을 위한 본 발명은 적어도 하나 이상의 벌브를 형성하는 2개의 PC강연선; 상기 PC강연선들의 일단에 고정되어 탄성 스프링에 의해 활개하는 적어도 하나 이상의 확경 날개를 구비하는 확경 정착체; 상기 PC강연선들의 타단이 관통하도록 설치되어 천공홀 입구 주변지반을 고정하기 위한 지압판; 및 상기 PC강연선들이 인장된 상태에서 상기 지압판과 상기 PC강연선을 체결하여 고정하는 체결장치; 상기 2개의 PC강연선이 놓여지고 양단에 볼트홀이 형성된 받침판과, 상기 받침판의 상부에 놓여져 상기 2개의 강연선이 일정간격으로 이격되도록 하고 양단에 상기 볼트홀에 대응되는 볼트홀이 형성된 간격유지판과, 상기 받침판과 간격유지판의 볼트홀을 통해 체결되어 2개의 PC강연선이 받침판과 간격유지판 사이에서 고정될 수 있도록 하는 U볼트 및 너트로 구성되는 간격유지수단;을 포함하여 구성된 것을 그 기술적 요지로 한다.
    • 5. 发明授权
    • 경사 형성된 천공홀 입구부에 있어서 다단 보강 그라우트 주입 공법을 통한 지반보강방법
    • 钻孔入口部分附加GROUT注入段的地基加固方法
    • KR101314117B1
    • 2013-10-04
    • KR1020120138936
    • 2012-12-03
    • 지반이엔씨 주식회사
    • 원명수
    • E02D17/20E02D3/12E02D3/08E02D5/80
    • E02D17/20E02D3/08E02D3/12E02D5/80E02D2250/003E02D2600/30
    • PURPOSE: A ground reinforcing method using a multilayer reinforcing grout injection method in an inlet of a bored hole formed to be inclined is provided to maximize a sealing effect of grout as a filling state is confirmed or as grouting materials are repeatedly injected in the inlet of the bored hole. CONSTITUTION: A ground reinforcing method using a multilayer reinforcing grout injection method in an inlet of a bored hole formed to be inclined comprises as follows. Foundation grouting materials are filled in the bored hole in which a soil nailing is inserted. A hose for confirming the discharge of air is installed in the inlet of the bored hole, and discharged soil and the grouting materials are mixed so that the inlet of the bored hole is sealed. Reinforcing grouting materials are pressurized and filled in the inlet of the bored hole many times after predetermined time. [Reference numerals] (AA) Start; (BB,DD) No; (CC,EE) Yes; (FF) End; (S10) Form a bored hall; (S20) Fill the bored hall with grouting materials; (S30) Complete the filling of the bored hall; (S40) Seal the inlet of the bored hall; (S50) Install a hose made of reinforcing grouting materials; (S60) Compress and inject the reinforcing grouting materials; (S70) Discharge air
    • 目的:提供一种在多孔增强灌浆注入法中形成倾斜孔的入口处的地面增强方法,以确保填充状态下灌浆的密封效果最大化,或灌浆材料反复注入到 无聊的洞。 构成:在形成为倾斜的钻孔的入口中使用多层增强灌浆注入法的地面加固方法包括如下。 基础灌浆材料填充在插入土钉的钻孔中。 用于确认排出空气的软管安装在钻孔的入口处,排出的土壤和灌浆材料混合,使得钻孔的入口被密封。 加固灌浆材料在预定时间后多次加压填充钻孔的入口。 (附图标记)(AA)开始; (BB,DD)否; (CC,EE)是; (FF)结束; (S10)形成无聊的大厅; (S20)灌注灌注材料; (S30)完成无聊大厅的填充; (S40)密封无孔大厅的入口; (S50)安装由增强灌浆材料制成的软管; (S60)压缩注射增强灌浆材料; (S70)排出空气
    • 6. 发明公开
    • 지반보강장치
    • 用于加固地面的装置
    • KR1020130061977A
    • 2013-06-12
    • KR1020110128326
    • 2011-12-02
    • 서호택
    • 서호택
    • E02D3/08E02D17/20E02D5/54E02D5/80
    • E02D3/08E02D5/54E02D5/80E02D17/20E02D2200/146E02D2300/0034
    • PURPOSE: A device for reinforcing the ground is provided to maximize ground reinforcement effects by expanding to be firmly fixed to the inner wall of a borehole after insertion and sufficiently applying tension. CONSTITUTION: A device(10) for reinforcing the ground comprises a head guide part, a mounting wing part(200), and a joint part(300). The head guide part is formed into a predetermined length and comprises joint holes at a regular gap. The mounting wing part is joined to the joint hole of the head guide part. The mounting wing part is symmetrically spread on the joint hole through the elasticity of an elastic spring. The joint part is joined to one end of the head guide part, a PC concrete strand(400), and a rebar.
    • 目的:提供一种用于加强地面的装置,以便通过扩张将地面增强效果最大化,以便在插入后牢固地固定在钻孔的内壁上并充分施加张力。 构成:用于加强地面的装置(10)包括头部引导部分,安装翼部分(200)和接合部分(300)。 头部引导部分形成预定长度并且包括在规则间隙处的接合孔。 安装翼部与头部引导部的接合孔接合。 安装翼部分通过弹性弹簧的弹性对称地分布在接头孔上。 接头部分连接到头部引导部分的一端,PC混凝土绞线(400)和钢筋。
    • 7. 发明公开
    • 연약지반의 개량공법
    • 弱地面加固方法
    • KR1020130054782A
    • 2013-05-27
    • KR1020110120369
    • 2011-11-17
    • 김치열
    • 김양기김치열
    • E02D3/08E02D3/10E02D27/26E02D17/18
    • E02D3/08E02D3/10E02D17/18E02D27/26E02D2200/13E02D2300/0004
    • PURPOSE: A reinforcing method for flimsy ground is provided to reduce environmental destruction and a construction cost by reducing the demand for soil and to shorten a construction period. CONSTITUTION: A reinforcing method for flimsy ground comprises the following steps: forming a back(2) around flimsy ground and injecting grout into a container(10) on the top of the bank; installing a drain mat(3) on the top of the flimsy ground and forming a horizontal drain layer made of drain materials on the top; and throwing the container to the flimsy ground on the top of the bank using a throwing device(200) or storing the container in a storage body for layering on the flimsy ground and loading as an overburden load. The container is made of the recycled goods of a synthetic resin material.
    • 目的:通过减少对土壤的需求并缩短施工期,为脆弱地面提供加固方法,减少环境破坏和施工成本。 构成:脆弱地面的加固方法包括以下步骤:在脆弱的地面上形成背部(2),并将浆料注入到银行顶部的容器(10)中; 在薄弱的地面的顶部安装排水垫(3),并在顶部形成由排水材料制成的水平排水层; 并使用投掷装置(200)将容器投入到银行顶部的脆弱地面上,或者将该容器储存在存储体中,以分层在脆弱的地面上并作为上覆载荷加载。 容器由合成树脂材料的回收物料制成。
    • 8. 发明公开
    • 백호 진동다짐 팽이말뚝기초 공법
    • 顶层基础的后桥振动方法
    • KR1020120102825A
    • 2012-09-19
    • KR1020110014468
    • 2011-02-18
    • 이창남
    • 이창남
    • E02D5/46E02D5/48E02D27/14E02D7/18E02D3/08E02D3/046
    • E02D5/46E02D3/046E02D3/08E02D5/48E02D7/18E02D27/14
    • PURPOSE: A top-base method using the vibration of a backhoe is provided to efficiently insert a top pile into the ground by securely compacting the ground. CONSTITUTION: A top-base method using the vibration of a backhoe is as follows. The ground to be reinforced is excavated, and rubble is spread on the excavated surface. A top hole is formed by compacting the excavated surface using a backhoe with a vibration compactor, and concrete or rubble and sand is put into the top hole and is compacted. The process is repeated. [Reference numerals] (11) Compacting using a backhoe; (1-10) Compacting using a backhoe + concrete(or sand+rubble); (AA) Foundation; (BB) Bottom surface of the foundation; (CC) Spreading rubble; (DD,EE) Construction order
    • 目的:提供使用反铲振动的顶基方法,通过牢固地压实地面,将顶层桩高效地插入地面。 构成:使用反铲振动的顶基方法如下。 被加固的地面被挖掘,瓦砾铺展在挖掘的地面上。 通过使用具有振动压实机的反铲式压实挖掘表面形成顶孔,并将混凝土或瓦砾和砂放入顶孔中并压实。 重复该过程。 (附图标记)(11)使用反铲的压实; (1-10)使用反铲+混凝土(或沙+瓦砾)进行压实; (AA)基金会; (BB)基础底面; (CC)散布瓦砾; (DD,EE)施工单