会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明公开
    • 고온수 냉각 및 스팀 배출 장치
    • 热温水冷却和蒸汽排放装置
    • KR1020140083074A
    • 2014-07-04
    • KR1020120149117
    • 2012-12-20
    • 주식회사 포스코
    • 송은상김병철이건우김동원
    • F27B3/10F27B3/19F27D17/00C21C5/52
    • Y02P10/216Y02P10/283C21C5/527F27D7/02F27D17/002
    • The present invention discloses an apparatus for cooling high temperature water and discharging steam which can quickly and safely separate and discharge water and steam from large volume of high temperature water used as cooling water for high temperature gas during blowing of a steel making process. According to an embodiment of the present invention, the apparatus for cooling high temperature water and discharging steam comprises a separating housing which has a sealed structure, wherein a steam outlet and a water outlet are placed to face each other in the vertical direction; a high temperature water supply unit which supplies high temperature water into the inner space of the separating housing; multiple separating diaphragms which have drain apertures to drop high temperature water supplied from the high temperature water supply unit and are placed separately with a certain distance by blocking the inner space of the separating housing in a horizontal direction; and a cooling water supply unit which supplies cooling water between separating diaphragms by spraying cooling water in the direction crossing the high temperature water dropped from the drain aperture.
    • 本发明公开了一种用于冷却高温水和排出蒸汽的装置,其可以在制吹过程中快速安全地分离和排出大量用作高温气体的冷却水的高温水的水和蒸汽。 根据本发明的实施例,用于冷却高温水并排出蒸汽的装置包括具有密封结构的分离壳体,其中蒸汽出口和出水口在垂直方向上彼此面对放置; 高温供水单元,其将高温水供应到分离壳体的内部空间中; 多个分离膜片,其具有排放孔以降低从高温供水单元供应的高温水,并通过在水平方向上阻挡分离壳体的内部空间而分开放置一定距离; 以及冷却水供给单元,其通过在从排水孔落下的高温水的方向喷射冷却水,在分离膜之间供给冷却水。
    • 6. 发明公开
    • 야금로 특히 강을 생산하기 위한 전기로의 연속 공급 컨베이어에 의해 이송된 적재 재료의 조절 및 추적 시스템과 방법
    • 冶金炉连续供电输送机运输的材料充电方法与控制与跟踪系统,特别是用于生产钢铁的电炉
    • KR1020130138209A
    • 2013-12-18
    • KR1020137006750
    • 2011-08-15
    • 테노바 에스.피.에이.
    • 아쌍티,프란체스코,알베르토,마리아지렐리,레나토레알리,실비오,마리아
    • F27B3/18F27B3/28F27D13/00F27D19/00F27D21/00B65G43/08C21C5/52
    • B65G43/08C21C5/527C21C2005/5282C21C2005/5288F27B3/18F27B3/28F27D13/002F27D19/00F27D21/0035Y02P10/216
    • 본 발명은 야금로(3) 특히 강을 생산하기 위한 전기로의 연속 공급 컨베이어(2)에 의해 이송된 적재 재료의 조절 및 추적 방법과 조절 및 추적 시스템에 관한 것으로서, 상기 연속 컨베이어(2)는, 컨베이어의 입구 단부로부터 시작하여 컨베이어의 출구 단부를 향해, 차례대로, 야금로(3)에 공급되어야 하는 적재 재료의 적재 섹션(2A), 적재된 적재 재료의 사전가열 섹션(2B) 및 사전가열된 적재 재료를 상기 야금로(3) 내로 유입시키는 유입 섹션(2C)을 포함하며, 상기 적재 섹션(2A)을 따라, 적어도, 재료의 제 1 적재 스테이션(200)이 존재하고, 상기 방법은: 미리 정해진 적재 재료 방식(단계 100)에 따라 상기 제 1 적재 스테이션(200) 내에 적재되어야 하는 제 1 적재 부분의 재료의 중량과 유형을 결정하는 단계(101); 상기 제 1 적재 스테이션(200)에 상기 제 1 적재 부분을 공급하는 단계(102); 상기 제 1 적재 부분의 중량을 탐지하는 단계(103); 상기 연속 컨베이어(2) 위에 상기 제 1 적재 부분(C1)을 배출하는 단계(104); 식별 수단(M1, M1', M1'')을 통해 제 1 적재 부분(C1)을 표시하는 단계(105); 상기 연속 컨베이어(2) 위에 배출된 상기 제 1 적재 부분(C1)의 전체 치수들을 탐지하는 단계(106); 연속 컨베이어(2)의 상기 적재 섹션(2A)을 따라 이동하는 상기 제 1 적재 부분(C1)의 전진 속도를 추정하고, 추가적인 적재 부분의 가능한 그 다음 적재 스테이션(200n) 또는 상기 사전가열 섹션(2B)에 유입되는 상기 제 1 적재 부분(C1)의 도달시간을 추정하는 단계(107, 108); 상기 사전가열 섹션(2B)의 입구에 인접하여, 상기 연속 컨베이어(2) 위에 배출된 적재 재료에서, 각각의 식별 수단(M1, Mn)에 의해, 상기 제 1 적재 부분(C1) 및 그 뒤에 상기 연속 컨베이어(2) 위에 배출된 가능한 추가적인 적재 부분(Cn)을 인식하는 단계(115); 상기 제 1 적재 부분(C1)의 전진 속도 및 상기 사전가열 섹션(2B)을 따라 그 뒤에 상기 연속 컨베이어(2) 위에 배출된 가능한 추가적인 적재 부분(Cn)의 전진 속도를 추정하고, 야금로(3) 내의 상기 유입 섹션(2C)에 도달하는 각각의 도달시간을 추정하는 단계(117, 118)로 구성된 단계들을 포함하는 것을 특징으로 한다.
    • 8. 发明公开
    • 전기로에서의 제강 방법
    • 电炉冶炼方法
    • KR1020130002513A
    • 2013-01-08
    • KR1020110063501
    • 2011-06-29
    • 현대제철 주식회사
    • 장진수유석현조원재
    • C21C5/52
    • Y02P10/216C21C5/527C21C7/0006
    • PURPOSE: A steelmaking method in an electric furnace is provided to reduce surface defects by controlling the mixing ratio of pig iron for controlling the critical concentration of Cu. CONSTITUTION: A steelmaking method in an electric furnace is as follows. The mixing ratio of pig iron among main materials charged in an electric furnace is calculated according to the following expression. The total mixing ratio of the main materials charged in the electric furnace is controlled based on the calculated mixing ratio of the pig iron. The expression is αxT-β. The α is a coefficient between 3 and 4. The T is the thickness of a hot rolled coil. The β is a constant value between 5 and 6. [Reference numerals] (AA) Reference; (BB) Coil thickness(mm); (CC) Coil thickness; (DD) Critical Cu(%) in molten steel
    • 目的:提供电炉中的炼钢方法,通过控制生铁的混合比控制Cu的临界浓度来减少表面缺陷。 构成:电炉中的炼钢方法如下。 根据以下表达式计算在电炉中装入的主要材料中的生铁的混合比。 基于计算出的生铁混合比来控制装在电炉中的主要材料的总混合比。 表达式为αxT-β。 α是3和4之间的系数.T是热轧线圈的厚度。 β为5〜6之间的常数值。 (BB)线圈厚度(mm); (CC)线圈厚度; (DD)钢水临界Cu(%)
    • 9. 发明公开
    • 전기로에서의 용강 탈린제 및 탈린 방법
    • 用于电炉中的金属的去氢化剂和使用它的去磷化方法
    • KR1020120132909A
    • 2012-12-10
    • KR1020110051307
    • 2011-05-30
    • 현대제철 주식회사
    • 김해곤이광근
    • C21C7/064C21C5/52
    • Y02P10/216C21C7/0645C21C5/527C21C2200/00
    • PURPOSE: A molten steel dephosphorizing agent and a dephosphorizing method for an electric furnace are provided to improve the recovery rate of molten steel and substitute quicklime by recycling KR(Kanvara Reactor) slag in the electric furnace. CONSTITUTION: A molten steel dephosphorizing method for an electric furnace comprises the steps of: charging scraps and a predetermined amount of quicklime into the electric furnace(S11), melting the scraps with arc heat(S12), blowing oxygen into the electric furnace for an oxygen refining process(S13), and accelerating a dephosphorizing process by injecting 1.6-2.1 kg of KR slag per 1 kg of quicklime into molten steel through a water-cooling lance to compensate shortage of quicklime(S14). [Reference numerals] (AA) Start; (BB) End; (S11) Charging scrap and quicklime to electric converter; (S12) Melting scrap; (S13) Blowing oxygen; (S14) Injecting about 2Kg of KR slag per 1K of quicklime as substitute of quicklime; (S15) Removing phosphorous oxide reacting with CaO of KR slag as slag
    • 目的:提供一种钢水脱磷剂和电炉的脱磷方法,以提高钢水的回收率,并通过在电炉中回收KR(Kanvara反应器)炉渣来代替生石灰。 构成:电炉的钢水脱磷方法包括以下步骤:向电炉中加入废料和预定量的生石灰(S11),用电弧加热熔化废料(S12),将氧气吹入电炉中 氧气精炼工艺(S13),并通过水冷喷枪将每1kg生石灰注入1.6-2.1kg KR渣,以补偿生石灰不足,从而加速脱磷过程(S14)。 (附图标记)(AA)开始; (BB)结束; (S11)向电动转换器充电废料和生石灰; (S12)熔融废料; (S13)吹氧; (S14)每1K生石灰注入约2Kg的KR渣作为生石灰的替代品; (S15)除去与KR渣的CaO反应的氧化磷作为渣
    • 10. 发明公开
    • 전기로용 가탄 랜스
    • 供应电炉用碳材料
    • KR1020120033060A
    • 2012-04-06
    • KR1020100094658
    • 2010-09-29
    • 현대제철 주식회사
    • 모성국
    • C21C5/52
    • Y02P10/216C21C5/527C21C2300/02F27D3/0033F27D2003/169F27D2003/185
    • PURPOSE: A carbonizing lance for an electric furnace is provided to easily supply supplementary materials by mixing and supplying a carbonizing mate and the supplementary materials at a proper ratio through a single lance. CONSTITUTION: A carbonizing lance for an electric furnace comprises a carbonizing body(110) and a combiner(120). The carbonizing body can be inserted into an electric furnace. The combiner is formed at the entrance of the carbonizing body in order to put a carbonizing mate and supplementary materials into the carbonizing body. The combiner comprises a combiner body, a carbonizing mate injection part formed on the side thereof, and a supplementary material injection part formed on the side thereof, separate from the carbonizing mate injection part in a horizontal direction.
    • 目的:提供一种用于电炉的碳化喷枪,以通过单喷枪混合和供应碳化配合物和补充材料,以适当的比例容易地供应补充材料。 构成:用于电炉的碳化喷枪包括碳化体(110)和组合器(120)。 碳化体可以插入电炉中。 在碳化体的入口处形成组合器,以将碳化物和补充材料放入碳化体中。 组合器包括组合器主体,形成在其一侧的碳化配合注入部分和形成在侧面上的补充材料注入部分,其在水平方向上与碳化配合注入部分分离。