    • 2. 发明授权
    • 원심성형 피에이치씨 파일용 초고강도 콘크리트 조성물
    • 超高强度混凝土组合物
    • KR101172635B1
    • 2012-08-09
    • KR1020110105525
    • 2011-10-14
    • 주식회사 포스코건설삼표피앤씨 주식회사
    • 시대복손주혁박규연정문홍민기훈신준호부교탁김재호황의성하덕용
    • C04B24/04C04B18/14C04B28/16
    • Y02W30/94C04B24/04C04B14/365C04B18/142C04B28/04C04B2201/50
    • PURPOSE: An ultra strength concrete composition for centrifugal-casting PHC pile is provided to increase strength of the PHC pile, thereby reducing pile damage rate. CONSTITUTION: An ultra strength concrete composition for centrifugal-casting PHC pile comprises unit content in concrete of 120-150kg/m^3, unit combination material amount of 450-650kg/m^3,, fine aggregate content of 450-650kg/m^3, and unit coarse aggregate content of 1,100-1, 350kg/m^3. The binding material additionally includes 0.8-2.0 wt% of chemistry blending material which is polycarboxylate based superplasticizer based on the binding material. The maximum size of the coarse aggregate is 16-25 mm. Among the binding materials, 1-50 wt% of the high strength compound composition is replaced and added based on 100wt% of cement. The admixture is composed of 45-99 wt% of slag and 1-55 wt% of anhydrous gypsum. The cement is three species blister steel Portland cement.
    • 目的:提供一种用于离心铸造PHC桩的超强混凝土组合物,以提高PHC桩的强度,从而降低桩的破坏率。 构成:离心铸造PHC桩的超强度混凝土组成包括混凝土单位含量为120-150kg / m ^ 3,单位组合料量为450-650kg / m ^ 3,细骨料含量为450-650kg / m ^ 3,单位粗骨料含量为1,100-1,350kg / m ^ 3。 粘合材料另外包含0.8-2.0重量%的基于结合材料的基于聚羧酸酯的超增塑剂的化学共混材料。 粗骨料的最大尺寸为16-25毫米。 在粘合材料中,以100重量%的水泥为基础,更换1-50重量%的高强度化合物组合物。 该混合物由45-99wt%的渣和1-55wt%的无水石膏组成。 水泥是三种水泡波特兰水泥。
    • 4. 发明公开
    • 철근을 이용한 건축 구조물의 전단 보강 구조
    • 使用REBAR建筑施工的剪力补偿结构
    • KR1020120038131A
    • 2012-04-23
    • KR1020100099721
    • 2010-10-13
    • 주식회사 포스코건설
    • 이철우서수열정문홍김도훈김평석김형신백재민이영호황재호
    • E04C5/06
    • PURPOSE: A shear reinforcement structure of a structure using reinforcing bars is provided to improve construction performance by improving the shearing force of a structure using shear reinforcing members. CONSTITUTION: A shear reinforcement structure of a structure using reinforcing bars comprises an upper member(10), a lower member(20), and shear members(30). The lower member is vertically separated from the upper member. The shear members are installed between the upper and lower members. Each shear member comprises a top part, a linear part, and a bottom part. The top part is connected to one end of the linear part, and one end of the top part is outward bent. The bottom part is connected to the other end of the linear part, and one end of the bottom part is outward bent.
    • 目的:提供使用钢筋的结构的剪切增强结构,以通过改进使用剪切增强构件的结构的剪切力来改善施工性能。 构成:使用钢筋的结构的剪切加强结构包括上部构件(10),下部构件(20)和剪切构件(30)。 下部构件与上部构件垂直分离。 剪切构件安装在上部和下部构件之间。 每个剪切构件包括顶部,直线部分和底部。 顶部连接到直线部分的一端,顶部的一端向外弯曲。 底部连接到直线部分的另一端,底部的一端向外弯曲。
    • 6. 发明授权
    • CFT 기둥 접합부의 접합기구와 가이드브라켓 및 이를 이용한 접합방법
    • 用于混凝土填充管接头部分的组合装置和导向支架及其组合方法
    • KR101124446B1
    • 2012-03-26
    • KR1020110056914
    • 2011-06-13
    • 주식회사 포스코건설
    • 백재민김도훈이종인정문홍최종문황재호
    • E04B1/21E04B1/58
    • PURPOSE: A bonding device for a CFT-post bonding portion and a bonding method using a guide bracket and the bonding device are provided to satisfy shearing force and constructability by directly fastening the rebar of a slab to a CFT steel pipe. CONSTITUTION: A bonding device for a CFT-post bonding portion comprises a CFT post(10), a guide bracket(100), and one or more rebars(300). The CFT post is formed as a steel pipe(12) and concrete(14) is filled in the CFT post. One or more through holes(13) are formed on the bonding portion of the steel pipe of the CFT post. The guide bracket is composed of one or more insertion portions(120) and a connecting portion(140). The insertion portion is inserted into the steel pipe through the through holes of the CFT post. The connecting portion connects the insertion portions outside the CFT post.
    • 目的:提供一种用于CFT柱接合部分的接合装置和使用导向支架和接合装置的接合方法,以通过将钢坯的钢筋直接紧固到CFT钢管来满足剪切力和构造性能。 构成:用于CFT柱接合部分的接合装置包括CFT柱(10),导向支架(100)和一个或多个钢筋(300)。 CFT柱形成为钢管(12),混凝土(14)填充在CFT柱中。 在CFT柱的钢管的接合部分上形成有一个或多个通孔(13)。 引导支架由一个或多个插入部分(120)和连接部分(140)组成。 插入部分通过CFT柱的通孔插入钢管中。 连接部分将插入部分连接在CFT柱之外。