会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明公开
    • 환원철 제조 장치 및 그 제조 방법
    • 制造热还原铁的装置及其制造方法
    • KR1020110029940A
    • 2011-03-23
    • KR1020090087824
    • 2009-09-17
    • 주식회사 포스코
    • 신명균김동원김상현이준혁
    • C21B13/06
    • C21B13/0033C21B13/143C21B2100/02C21B2100/06C21B2100/40C21B2100/66C21B2100/80F27D17/004
    • PURPOSE: An apparatus and a method for manufacturing hot reduced iron are provided to simplify mineral drying and transfer processes by properly drying mineral and charging the dried mineral directly into a mineral layer formed in a reduction furnace. CONSTITUTION: A method for manufacturing hot reduced iron comprises steps of: drying mineral in a mineral dryer(10), supplying the dried mineral to one or more reduction furnaces(201), reducing mineral in the reduction furnaces to obtain reduced iron, discharging exhaust gas from the reduction furnaces, dividing the exhaust gas to provide mineral transfer gas, and transferring the sensible heat of the exhaust gas to the mineral transfer gas through heat exchange between the exhaust gas and the mineral transfer gas.
    • 目的:提供一种用于制造热还原铁的设备和方法,以通过适当地干燥矿物并将干燥的矿物直接加入到还原炉中形成的矿物层中来简化矿物干燥和转移过程。 构成:制造热还原铁的方法包括以下步骤:在矿物干燥器(10)中干燥矿物质,将干燥的矿物质供应到一个或多个还原炉(201),还原炉中的矿物减少以获得还原铁,排出废气 分离废气以提供矿物质转移气体,并通过废气和矿物转移气体之间的热交换将废气的显热转移到矿物转移气体。
    • 3. 发明公开
    • 용철제조설비에서 버너연소실 막힘방지장치
    • 用于防止燃烧室在煤焦炉设备中堵塞的装置
    • KR1020020015899A
    • 2002-03-02
    • KR1020000049035
    • 2000-08-23
    • 주식회사 포스코뵈스트-알핀 인두스트리안라겐바우 게엠바하재단법인 포항산업과학연구원
    • 이준혁신명균주상훈
    • C21B13/00
    • C21B13/14C21B13/002C21B13/0033
    • PURPOSE: A device for preventing blockage of the burner chamber in a coal based ironmaking equipment is provided which prevents blockage in the lower part of the burner chamber and the curved parts of gas pipes by forming a gas film using nitrogen on the lower part of the body of a combustion chamber. CONSTITUTION: The device(20) for preventing blockage of the burner chamber in a coal based ironmaking equipment comprises plural nozzles(9) which are formed on the inner wall part of the body of a combustion chamber(6) of a burner(5), connected to a nitrogen gas supply line(10) equipped with a first switch valve(10a), and eject nitrogen gas so as to form a nitrogen gas film on the inner wall of the combustion chamber(6); a collector(11) which is connected to the curved parts of gas pipes(2b,3b,4b) connected to the lower part of the combustion chamber(6) and equipped with a second switch valve(12) so as to open or close an exit and a gate(13) opening or closing an entrance; and a controller controlling opening or closing time points of the first and second switch valves(10a,12) and the gate(13), wherein the device further comprises a sensor member(15) which is installed in the neighborhood of the inner upper part of the collector(11) so as to control switching operation of the gate(13) and the second switch valve(12) by sensing a maximum collection amount of foreign substance which is stacked by being vertically dropped from the combustion chamber(6).
    • 目的:提供一种用于防止在煤基炼铁设备中堵塞燃烧器室的装置,其通过在氮气的下部形成使用氮的气体膜来防止燃烧器室的下部和气体管道的弯曲部分的堵塞 燃烧室的主体。 构成:用于防止在煤基炼铁设备中堵塞燃烧器室的装置(20)包括形成在燃烧器(5)的燃烧室(6)的主体的内壁部分上的多个喷嘴(9) 连接到配备有第一切换阀(10a)的氮气供给管线(10),并且排出氮气以在所述燃烧室(6)的内壁上形成氮气膜; 与所述燃烧室(6)的下部连接的燃气管(2b,3b,4b)的弯曲部分连接并具有第二切换阀(12)以便打开或关闭的收集器(11) 出口和门(13)打开或关闭入口; 以及控制器,其控制所述第一和第二切换阀(10a,12)和所述闸门(13)的打开或关闭时间点,其中所述装置还包括传感器构件(15),所述传感器构件安装在所述内部上部 通过感测通过从燃烧室(6)垂直下落而堆积的异物的最大收集量来控制闸板(13)和第二切换阀(12)的切换动作。
    • 4. 发明公开
    • 일반탄 및 분철광석을 이용한 용철제조설비에서 미분광석추가장입장치
    • 使用非炼焦煤和细铁矿冶炼设备附加充电铁轴承材料的装置
    • KR1020020015898A
    • 2002-03-02
    • KR1020000049034
    • 2000-08-23
    • 주식회사 포스코뵈스트-알핀 인두스트리안라겐바우 게엠바하재단법인 포항산업과학연구원
    • 신명균주상훈이준혁
    • C22B5/14
    • PURPOSE: An apparatus for additionally charging fine iron bearing materials in an ironmaking equipment using non-coking coal and fine iron ore is provided which improves working productivity of the ironmaking process by directly charging the fine iron bearing materials into an ore pipe. CONSTITUTION: The apparatus for additionally charging fine iron bearing materials in an ironmaking equipment using non-coking coal and fine iron ore comprises a high temperature dust collection tank(9) collecting fine ore scattered from a preheating furnace(4); a storage tank(10) which is connected to the high temperature dust collection tank(9) by a firs transfer pipe(11), and into which fine iron bearing materials are supplied, or supplemented through a transfer belt line(13); an equal pressure distribution part(20) consisting of an upper storage tank(21) which is connected to the storage tank(10) by a second transfer pipe(17) and equipped with an upper level switch(22), a pressure equalization tank(23) which is connected to the upper storage tank(21) by a first switch valve(24a), and to which a first nitrogen gas pipe(29a) and a gas discharge pipe(29c) are connected, and a lower tank(25) which is connected to the pressure equalization tank(23) by a second switch valve(24b), to which a second nitrogen gas pipe(29b) is connected, and which is equipped with a lower level switch(26) and a rotation extractor(28) that is opened or closed according to signals of a weight measuring device(27) continuously measuring the weight variations; and a charging pipe(30) which guides and supplies fine ore discharged from the rotation extractor(28) into a third ore pipe(2a).
    • 目的:提供一种使用非炼焦煤和细铁矿石在炼铁设备中额外装入精细铁轴承材料的装置,通过将铁精矿直接装入矿石管道,提高炼铁工艺的工作生产率。 构成:用于在炼焦设备中使用非炼焦煤和精细铁矿石另外装入精细铁轴承材料的装置包括:收集从预热炉(4)散落的细矿石的高温集尘箱(9)。 储罐(10),通过第一转运管(11)连接到高温除尘器(9)上,并通过转印带(13)补充细铁载体材料; 由上部储罐(21)构成的等压分配部(20),上部储罐(21)通过第二输送管(17)与第二输送管(17)连接并配备有上位开关(22),压力平衡罐 (23),其通过第一切换阀(24a)连接到上部储罐(21),第一氮气管道(29a)和气体排出管道(29c)连接到所述第一开关阀 25),其通过连接有第二氮气管(29b)的第二开关阀(24b)连接到压力平衡罐(23),并且配备有下部开关(26)和旋转 提取器(28),其根据连续测量重量变化的重量测量装置(27)的信号而打开或关闭; 以及将从旋转取出器(28)排出的细矿石引导并供给到第三矿石管(2a)的充气管(30)。
    • 5. 发明公开
    • 일반탄 및 분철광석을 이용한 용철제조공정에 있어서유동층붕괴 방지장치
    • 用于使用半软化焦煤和粉碎铁矿石在铁矿制造工艺中防止流化床破坏的装置
    • KR1020010045380A
    • 2001-06-05
    • KR1019990048645
    • 1999-11-04
    • 주식회사 포스코뵈스트-알핀 인두스트리안라겐바우 게엠바하재단법인 포항산업과학연구원
    • 신명균이준혁
    • C21B13/00
    • C21B13/0033
    • PURPOSE: An apparatus is provided to form a fluidized bed which is stable in a fluidized bed reduction furnace by preventing temporary disruption of fluidized bed in the fluidized bed reduction furnace caused during the generation of pressure peak in the ingot iron manufacturing process directly using semi-soft coking coal and pulverized iron ore. CONSTITUTION: The apparatus for preventing disruption of fluidized bed in the ingot iron manufacturing process using semi-soft coking coal and pulverized iron ore comprises a compressor (2) compressing flue gas flown in through the flue gas pipe, wherein the compressor is connected to a flue gas pipe (2a) which is installed at the rear side of a water dust collector (19) so that some of the flue gas can be diverged from the water dust collector; a compressed gas storing vessel (3) for storing the flue gas which is compressed by passing through the compressor (2); a gas pipe (4) one end of which is connected to the compressed gas storing vessel (3), and through which the compressed gas is flown; a control valve (5) opening or closing the gas flow of the gas pipe (4); and a gas blowing pipe (6) to which the other end of the gas pipe (4) is connected, wherein the gas blowing pipe (6) connects a reduction gas inlet pipe (13a) of a final reduction furnace (13) with a melting and gasifying furnace (14).
    • 目的:提供一种设备,用于形成流化床,流化床在流化床还原炉中稳定,通过防止在铸铁制造过程中直接使用半导体制造过程中产生压力峰值期间流化床还原炉中的流化床的暂时破坏, 软焦煤和粉碎铁矿石。 构成:在使用半软焦煤和粉碎铁矿石的锭铁制造工艺中防止流化床破裂的装置包括压缩机(2),压缩通过烟气管道流动的烟道,其中压缩机连接到 烟道气管(2a),其安装在集尘器(19)的后侧,使得一些烟道气可以从水集尘器分流; 用于储存通过压缩机(2)压缩的烟道气的压缩气体储存容器(3); 一个气体管道(4),其一端连接到压缩气体储存容器(3),压缩气体通过该管道流动; 打开或关闭气体管道(4)的气流的控制阀(5); 和气体管道(4)的另一端连接的气体吹送管(6),其中,所述气体吹送管(6)将最终还原炉(13)的还原气体导入管(13a)与 熔化气化炉(14)。
    • 6. 发明授权
    • 부착물제거장치가 구비된 용융선철제조장치
    • 用于制造具有沉积物去除装置的熔融生铁的设备
    • KR100286654B1
    • 2001-05-02
    • KR1019980031293
    • 1998-07-31
    • 주식회사 포스코재단법인 포항산업과학연구원
    • 이준혁신명균이상덕
    • C21B11/02C21B13/02
    • 본 발명은 일반탄을 이용하여 용융선철을 제조하는 장치에 관한 것으로서, 일반탄을 이용한 용융선철제조장치에 있어서 용융가스화로에서 발생되는 고온의 가스를 배출하기 위한 가스 상승관 및 냉각가스 인입관에 부착되는 부착물을 조업중단없이 용이하게 제거할 수 있는 용융선철제조장치를 제공하고자 하는데, 그 목적이 있다. 본 발명은 철광석을 하부에서 취입한 산소와 상부에서 장입된 석탄을 이용하여 용융선철을 제조하는 용융가스화로, 이 용융가스화로에서 생성된 고온의 가스를 배출하기 위한 가스 상승관, 및 이 가스 상승관을 통과하는 고온의 가스를 냉각시키기 위한 냉각가스 인입관을 포함하여 구성되는 용융선철제조장치에 있어서, 상기 가스 상승관및 냉각수 인입관에 부착된 부착물을 제거하기 위한 부착물 제거 장치를 추가로 포함하고; 상기 부착물 제거장치는 상기 냉각가스 인입관내를 이동가능하게 크기화되고 회전에 의해 부착물을 제거하도록 형성되는 제거판, 그 일단은 상기 제거판에 고정되고 그 타단은 회전모터에 연결되어 있는 회전축, 그 일단이 상기 제거판에 고정되고 그 외부에 나사산이 형성되고 그 내부는 상기 회전축이 왕복운동가능하도록 형성된 회전축 수용홀이 형성되어 있는 구동전달축으로 이루어지는 부착물제거장치가 구비된 용융선철제조장치를 그 요지로 한다.
    • 7. 发明授权
    • 충진층형 환원로의 충진층 상부내에서 발생되는 과열방지장치
    • 用于防止包装式减薄轴包装袋部分过热的装置
    • KR100270104B1
    • 2000-10-16
    • KR1019980031292
    • 1998-07-31
    • 주식회사 포스코재단법인 포항산업과학연구원
    • 신명균이상덕이준혁
    • C21B11/00
    • 본 발명은 일반탄 및 괴광석을 이용하여 용철을 제조하는 장치에 있어서 충진층을 형성하여 철광석을 환원하는 충진층형 환원로에 관한 것으로서, 환원로의 상부에서 과도한 탄소석출반응 및 국부적이고 집중적인 광석의 환원반응등에 의해 야기되는 과열현상을 방지할 수 있는 충진층형 환원로의 충진층상부내에서 발생되는 과열방지장치를 제공하고자 하는데, 그 목적이 있다.
      본 발명은 충진층형 환원로에 있어서, 상기 환원로의 상부를 일정간격을 두고 에워싸도록 구성되는 환상관; 상기 수집진장치에서 냉각된 환원로 배가스를 상기 환상관으로 공급하도록 구성되는 냉각가스도관; 상기 환상관에 가스소통관계로 연결되어 냉각 배가스를 상기 환원로의 상부에 공급하도록 구성되는 다수 개의 풍구; 상기 환원로 상부내의 충진층 온도를 측정 하도록 구성되는 온도계; 상기 냉각가스도관에 구비되어 상기 온도계에서 측정된 환원로 상부내의 충진층 온도와 연계하여 작동되도록 구성되는 가스유량조절밸브; 상기 배가스 배출관과 가스유량조절밸브사이의 냉각가스도관에 설치되어 냉각가스를 승압시키기 위한 승압기; 및 상기 환상관과 가스유량조절밸브사이의 냉각가스도관에 구비되어 환원로내의 환원가스가 냉각가스도관을 통해 역류하는 것을 차단하기 위한 가스 역류 차단수단을 포함하여 구성되는 충진층형 환원로의 충진층상부내에서 발생되는 과열방지장치를 그 요지로 한다.