会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • 집수정 구조체 및 그 시공방법
    • 其构造方法及其方法
    • KR1020110022275A
    • 2011-03-07
    • KR1020090079804
    • 2009-08-27
    • 시지엔지니어링(주)다해산업(주)우광티엔씨(주)
    • 이정영홍기채황순종박보현
    • E02D29/045E02D31/00E03B11/14E03B3/02E03B3/06
    • E02D29/045E02D31/00E02D2250/0023E02D2300/0029E03B3/02E03B3/06E03B11/14
    • PURPOSE: A collector well structure and a construction method thereof are provided to prevent the separation of a collector well and enable the stable installation of a collector well on the bottom of a foundation. CONSTITUTION: A collector well structure comprises a collector well(100), a fixing frame(110), and a coupling unit(120). The collector well has a water collection space for storing a fixed amount of water. The fixing frame is comprised of an insertion portion(112) and a wing plate portion(114). The insertion portion is vertically inserted into the lower part of the collector well. The wing plate portion is extended from the insertion portion to the outside at a right angle. The coupling unit is located inside the insertion portion of the fixing frame, and an anchor bolt portion(124) is formed at the end thereof. The anchor bolt portion passes through the lower plate of the collector well and is located inside the collector well.
    • 目的:提供一种收集阱结构及其施工方法,以防止收集器井分离,并使收集器能够稳定地安装在基础的底部。 构成:集电器阱结构包括收集阱(100),固定框架(110)和耦合单元(120)。 收集井具有用于储存固定量的水的收集空间。 固定框架包括插入部分(112)和翼板部分(114)。 插入部分垂直插入收集阱的下部。 翼板部分从插入部分以直角延伸到外部。 联接单元位于固定框架的插入部分的内部,并且在其端部形成有锚定螺栓部分(124)。 锚栓螺栓部分通过收集井的下板,并位于收集井内。
    • 3. 发明授权
    • 조립식 집수정
    • 预制水槽
    • KR100975365B1
    • 2010-08-11
    • KR1020080011602
    • 2008-02-05
    • 우광티엔씨(주)시지엔지니어링(주)
    • 홍기채주상준이정영정인수
    • E02D29/045E02D31/00E04H7/04E04H7/18
    • 본 발명은 몸체를 복수의 합성수지로 구성하고, 이를 조립함으로써 시공성과 경제성을 증대시킨 조립식 집수정에 관한 것이다.
      종래의 금속재 집수정은 자체중량이 무거워 운반과정이나 현장설치시 중장비를 동원해야 하므로 설치비용이 상승하는 문제점이 있는데, 이를 해결하기 위하여 본 발명은 복수의 하판부재가 방사상으로 결합되어 구성된 하판과, 상기 하판의 상측에 방사상으로 결합되고, 다시 그 위로 적층되어 집수정의 높이를 이루는 복수의 측판부재로 구성된 측판과, 상기 측판의 상측에 방사상으로 결합되는 복수의 상판부재로 구성된 상판으로 이루어진 집수정에 있어서, 상기 하판부재(10)의 내측에는 복수의 콘크리트부재(16)가 삽입되고, 하판부재(10)의 상측에는 금속판(17)이 결합되되, 상기 하판부재(10) 및 콘크리트부재(16), 금속판(17)에는 서로 대응하는 복수의 관통공(14)(16a)(17a)이 각각 형성되고, 상기 관통공(14)(16a)(17a)에는 볼트(1)가 삽입되어 와셔(2) 및 너트(3)에 의해 결합되는 것을 특징으로 하는 조립식 집수정을 제공한다.
      따라서 본 발명에 의하면, 소형의 금형으로 부품을 성형함으로써 대량생산이 가능해지고 제작단가를 낮출 수 있을 뿐만 아니라, 각 부품이 분리 구성되어 운반이 용이하고, 조립과 설치 또한 용이하여 경제성과 시공성이 우수하다는 장점이 있다. 또한, 측판을 적층하는 구조로 구성함으로써 높이를 가변하여 형성하는 것이 가능해져 건물마다 다양하게 형성되는 콘크리트층의 두께에 효과적으로 대응할 수 있다는 장점이 있다.
      집수정, 합성수지, 조립식, 분리형, 지하수, 배수
    • 6. 发明授权
    • 지하 구조물 양압용 감쇄처리용 구조체 및 이의 시공방법
    • 用于UPLIFT的地下结构减少加工的结构及其构造方法
    • KR100770290B1
    • 2007-10-31
    • KR1020060054419
    • 2006-06-16
    • 우광티엔씨(주)주상준홍기채
    • 이정영홍기채주상준정인호
    • E02D31/12E02D31/10E02D31/02E02D29/045
    • E02D31/12E02D29/045E02D31/02E02D31/025E02D31/10
    • A structure for reducing positive pressure of an underground structure and a construction method thereof are provided to construct drain pipes on the uneven ground without flattening the surface of the ground by using wrinkled pipe with holes for the drain pipe. A structure for reducing positive pressure of an underground structure comprises connection sockets(20), drain pipe(30), a polyethylene film, and a lean concrete layer. The connection socket is connected with pipes in all directions and provided with a cover at one side. The drain pipes are linked with the connection socket. The polyethylene film covers the connection sockets and the drain pipe. The lean concrete layer is formed on the polyethylene film by pouring concrete on the polyethylene film. The drain pipe includes a wrinkled pipes with holes and a non-woven fabric. The non-woven fabric surrounds the outer surface of the wrinkled pipes with holes.
    • 提供一种降低地下结构的正压力的结构及其施工方法,在不平坦的地面上构成排水管,而不会使排水管的带孔的起皱管扁平地面。 用于降低地下结构正压的结构包括连接插座(20),排水管(30),聚乙烯薄膜和贫混凝土层。 连接插座与各个方向的管道相连,并在一侧设有一个盖子。 排水管与连接座连接。 聚乙烯膜覆盖连接插座和排水管。 通过将混凝土浇注在聚乙烯膜上,在聚乙烯薄膜上形成贫混凝土层。 排水管包括带有孔的起皱管和无纺织物。 无纺织物围绕带有孔的起皱管的外表面。
    • 9. 发明授权
    • 스크류파일 시공방법
    • 螺丝刀的构造方法
    • KR101416865B1
    • 2014-07-09
    • KR1020110044716
    • 2011-05-12
    • 시지엔지니어링(주)이엑스티 주식회사주식회사 한라현대산업개발 주식회사
    • 송기용한병권이왕희유종수이정영황순종장동진
    • E02D5/56E02D7/22E02D5/62E02D5/54E02D27/12
    • 본 발명은 스크류파일 시공방법에 관한 것으로서, 내부에 중공이 형성되고, 일측 단부에 상기 중공과 연통되는 토출공이 형성되고, 측면에 복수의 그라우팅공이 형성된 로드부와; 상기 로드부의 외주면의 길이 방향을 따라 나선 형상으로 형성되어 부착된 나선부를 포함하는 스크류파일을 시공하는 방법으로서, 천공기를 이용하여 지반의 최상층에 위치한 매립층을 천공하여 천공부를 형성하는 제1단계와; 상기 천공부에 상기 스크류파일을 삽입하고 상기 토출공을 통하여 공기를 분사하면서 상기 스크류파일을 회전시켜 지반을 천공하면서 상기 매립층의 하측에 위치한 지반에 상기 스크류파일을 관입하는 제2단계와; 상기 매립층의 하측에 위치한 지반의 저항력에 의하여 상기 스크류파일이 더 이상 관입되지 않으면, 상기 토출공과 그라우팅공을 통하여 그라우팅액이 토출되도록 하여 지반을 그라우팅하면서 상기 스크류파일을 일정 높이 인발하는 제3단계와; 일정 높이로 상기 스크류파일이 인발되면 지속적으로 지반을 그라우팅하면서 상기 스크류파일을 다시 관입시키는 제4단계를; 포함하는 것을 특징으로 하는 스크류파일 시공방법. 포함하여 진행함으로써, 스크류파일을 일정 깊이로만 지반에 관입하더라도 지반에 대한 스크류파일의 선단지지력을 향상시키고, 그에 따라 스크류파일을 지반으로 관입하는데 소요되는 시간과 노력을 현저하게 줄일 수 있는 효과가 있다.
    • 10. 发明公开
    • 스크류파일 시공방법
    • 螺丝刀的构造方法
    • KR1020120126704A
    • 2012-11-21
    • KR1020110044716
    • 2011-05-12
    • 시지엔지니어링(주)이엑스티 주식회사주식회사 한라현대산업개발 주식회사
    • 송기용한병권이왕희유종수이정영황순종장동진
    • E02D5/56E02D7/22E02D5/62E02D5/54E02D27/12
    • E02D5/56E02D5/54E02D5/62E02D7/22E02D27/12
    • PURPOSE: A construction method of a screw pile is provided to remarkably reduce time required for inserting a screw pile into the ground by improving the end bearing capacity of the screw pile. CONSTITUTION: A construction method of a screw pile is as follows. A bored portion(4a) is formed by boring an uppermost buried layer(4) of the ground using a boring machine. A screw pile with a discharge hole(120) is inserted into the bored portion. The discharge hole of the screw pile jets air to the bored portion, and the screw pile is rotated to be inserted into a lower layer. When the insertion of the screw pile is stopped, a grouting hole(130) of the screw pile discharges a grout solution to the bored portion, and the screw pile is drawn out of the bored portion at a predetermined height. When the screw pile is drawn out, the ground is continuously grouted, and the screw pile is re-inserted into a lower layer.
    • 目的:提供螺杆桩的施工方法,通过提高螺杆桩的端部承载能力,大大减少将螺栓桩插入地面所需的时间。 构成:螺杆桩的施工方法如下。 通过使用钻孔机将地面的最上面的掩埋层(4)钻孔来形成钻孔部分(4a)。 将具有排出孔(120)的螺旋桩插入到钻孔部分中。 螺杆的排出孔将空气喷射到钻孔部,螺旋桩旋转以插入下层。 当螺钉堆的插入停止时,螺杆桩的灌浆孔(130)将灌浆液排出到钻孔部分,并且将螺杆桩以预定的高度从钻孔部分抽出。 拔出螺旋桩后,地面连续灌浆,将螺钉桩重新插入下层。