会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 2. 发明授权
    • 차양 장치
    • 遮阳篷
    • KR101707840B1
    • 2017-02-27
    • KR1020150063284
    • 2015-05-06
    • 썬파크 주식회사
    • 이윤규이승건
    • E06B9/303E06B9/38
    • 본발명에의한차양장치는, 구동모터에의하여회전하는회전부재, 상기구동모터및 회전부재가내부에설치되는모터박스부, 기설정된길이및 폭을가지고, 상기모터박스부에대하여승하강하거나길이방향과평행한수평방향의회동축을중심으로회동하여각도가조절되는다수개의슬랫, 상기회전부재를통하여상기구동모터의구동력을전달받아서상기슬랫을상기모터박스부에대하여승하강시키는승강와이어, 상기회전부재를통하여상기구동모터의구동력을전달받아서상기슬랫을회동축을중심으로회동시키는각도조절와이어, 및상기모터박스부의저면에회동가능하게설치되어상기모터박스부및 슬랫사이의직사광선또는시야를차폐하는차폐부재를포함한다. 이에, 차양장치의직사광선또는시야차폐효과를향상시킬수 있는효과가있다.
    • 8. 发明公开
    • 건축물의 벽체 방수구조
    • 建筑墙防水结构
    • KR1020090111411A
    • 2009-10-27
    • KR1020080037000
    • 2008-04-22
    • 썬파크 주식회사
    • 이윤규신용태
    • E04F13/08
    • E04F13/0898
    • PURPOSE: A waterproof structure of a building wall is provided to prevent additional water leakage into insulation materials when water infiltrates through a clearance between exterior materials. CONSTITUTION: A waterproof structure of a building wall comprises a wall concrete(C), exterior materials(100), horizontal members, and leakage prevention units(200). The exterior materials finish the wall concrete. The horizontal members are installed on the top and bottom of the wall concrete to connect the exterior materials. The leakage prevention units are installed on the right and left sides of the wall concrete in the vertical direction to the ground, thereby preventing a water leakage through side clearances of the exterior materials.
    • 目的:提供建筑墙体的防水结构,以防止水渗入外部材料间隙时,进一步渗漏到绝缘材料中。 构成:建筑物墙体的防水结构包括墙体混凝土(C),外部材料(100),水平构件和防漏单元(200)。 外墙材料完成墙体混凝土。 水平构件安装在墙体混凝土的顶部和底部,以连接外部材料。 防漏装置安装在墙体混凝土的左右两侧,与地面垂直,从而防止外部材料的侧面漏水。
    • 9. 发明公开
    • 건축물의 벽체구조
    • 造成墙体结构
    • KR1020090111410A
    • 2009-10-27
    • KR1020080036999
    • 2008-04-22
    • 썬파크 주식회사
    • 이윤규신용태
    • E04F13/08
    • E04F13/0851E04F13/083
    • PURPOSE: A wall structure of a building is provided to prevent reconstruction due to accumulation of clearance in case of attaching a plurality of exterior materials to the wall. CONSTITUTION: A wall structure of a building comprises a wall concrete(C), a joint bracket(10) of metal material, exterior materials(20,20T,20B), and a fixing member. The joint bracket is installed on the wall concrete. The exterior materials are provided to correspond to the joint bracket. The fixing member is installed on each exterior material to fix it to the joint bracket. The fixing member includes a first fixing member and a second fixing member which are installed on the exterior material surface facing the fixing bracket.
    • 目的:提供建筑物的墙壁结构,以防止在将多个外部材料附接到墙壁的情况下由于间隙的积聚而导致的重建。 构成:建筑物的墙体结构包括墙壁混凝土(C),金属材料的接合支架(10),外部材料(20,20T,20B)和固定构件。 接头支架安装在墙体上。 外部材料被提供以对应于接头支架。 固定构件安装在每个外部材料上以将其固定到接头支架上。 固定构件包括安装在面向固定支架的外部材料表面上的第一固定构件和第二固定构件。
    • 10. 发明公开
    • 건축물의 창호와 마감 타일 구조
    • 建筑窗户和建筑结构
    • KR1020090025513A
    • 2009-03-11
    • KR1020070090428
    • 2007-09-06
    • 썬파크 주식회사
    • 이윤규신용태
    • E04F13/08E04C2/20
    • E06B1/62E04F13/073
    • A window and door and finishing tile structure of building is provided that the finishing quality is improved since the outer tube of building is not polluted due to the calking material. A window and door and finishing tile structure of building comprises an exterior wall(100) shielding the concrete structure etc. and constructs the outer tube of building, window and door(200) which leave penetrated interior and exterior space open and closed, a sleeve(300) of the metal material in which the bonding groove is formed to outdoor, a water leakage prevention member(400) preventing the water leakage to indoor, a finishing tile(500) closing the step height gin site between the exterior wall and window and door.
    • 提供了建筑物的门窗和整理砖结构,因为建筑物的外管由于夹缝材料而没有被污染,因此整理质量得到改善。 建筑物的窗户和门和整理瓦片结构包括屏蔽混凝土结构等的外壁(100),并且构造建筑物,窗户和门(200)的外管,其穿透内部和外部空间打开和关闭,套筒 将形成有接合槽的金属材料(300)设置在室外,防止漏水到室内的防漏水部件(400),封闭外墙和窗户之间的台阶高度站点的精加工瓦(500) 和门。