会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 6. 发明授权
    • 덕트일체형 중공슬래브
    • HOLLOWCORE SLAB集成通风机
    • KR101576615B1
    • 2015-12-11
    • KR1020140102356
    • 2014-08-08
    • 삼성물산 주식회사
    • 김기동함명균김용태김용남오상준
    • E04B9/02E04B5/48
    • E04B9/02E04B5/48
    • 본발명은길이방향으로관통되고폭 방향으로적어도하나이상형성되는중공을가지며, 내부에긴장재가배치되어프리스트레스가가해지는중공슬래브; 상기중공슬래브의중공내에삽입설치되는관부재; 상기관부재의외면을감싸는띠형태의부재로서, 상기관부재의길이방향으로일정간격마다결합되는스페이서; 상기중공슬래부의중공과상기관부재의외면사이의이격공간에충진되는단열폼; 및, 상기중공슬래브의하부면일정위치마다상기중공과연결되도록천공되는연결구멍;을포함하여구성되되, 상기연결구멍에메인덕트또는디퓨져가연결되는것을특징으로하는덕트일체형중공슬래브에관한것이다.
    • 根据本发明的通风管道整体式中空板包括:沿纵向贯穿的中空板,并且设置有沿横向形成的一个或多个中空空间和设置在其中以预应力的钢筋; 插入中空板的中空空间中的管构件; 隔离件,其是包围管构件的带状构件,并且以规则的间隔沿长度方向安装在管构件上; 绝缘泡沫填充在中空板的中空空间与管构件的外表面之间的间隙中; 以及在某些位置处在中空板的下表面上钻孔并连接到中空空间的连接孔。 主管道或扩散器连接到连接孔。
    • 9. 发明公开
    • 프리캐스트 콘크리트 골조와 단위객실의 캐빈유닛을 이용한 건축물의 복합화 시공방법
    • 使用预制混凝土框架和室型CAVIN单元的复杂建筑方法
    • KR1020160017842A
    • 2016-02-17
    • KR1020140101116
    • 2014-08-06
    • 삼성물산 주식회사스타코 주식회사
    • 전병갑김용남이민형전진수최우일김태훈이상영정현출김성철박민구
    • E04B1/348E04B1/343E04H1/00
    • E04B1/34807E04B5/043E04B5/17
    • 본발명은공장에서미리제작된단위객실형태의캐빈유닛을이용하여다층(多層) 건축물을시공하는방법에서, 프리캐스트콘크리트(Precast Concrete) 부재로 2층이상의골조를완성하는제1단계; 상기제1단계과정을거쳐완성된골조내부에상기캐빈유닛을삽입(Infill)하는제2단계; 상기캐빈유닛을배치한후, 상기골조에접속하는제3단계; 및, 각층의외장및 설비시설을포함한마감공사를진행하는제4단계;를포함하여구성되는것을특징으로한다. 또한본 발명은공장에서미리제작된단위객실형태의캐빈유닛을이용하여다층(多層) 건축물을시공하는방법에서, 1층슬래브를완성하는제1´단계; 상기 1층슬래브위에상기캐빈유닛을계획된장소에적치(Stack) 및설치하는제2´단계; 프리캐스트콘크리트부재로 1층골조를완성하는동시에 2층바닥슬래브를완성하는제3´단계; 상기 2층바닥슬래브위에캐빈유닛을계획된장소에적치및 설치하는제4´단계; 및, 상기제1´단계내지제4´단계를계획층까지반복한후, 각층의외장및 설비시설을포함한마감공사를진행하는제5´단계;를포함하여구성되되, 상기골조공사와상기캐빈유닛의적치및 설치공사가한 개층씩동시에시공되는것을특징으로한다.
    • 本发明涉及一种使用在工厂预先制造的房型舱单元构造多层建筑物的方法,其中该方法包括:第一步骤,用预制混凝土构件完成两层或多层层框; 将舱单元填充到通过第一步完成的框架中的第二步骤; 第三步骤,设置机舱单元,然后连接到框架; 以及执行包括每层的外部和设施的整理结构的第四步骤。 此外,本发明涉及一种使用在工厂中预先制造的室型机舱单元来构造多层建筑物的方法,其中该方法包括:完成第一层板坯的第一步骤; 在第一层板上的预定位置堆叠并安装舱单元的第二步骤; 用预制混凝土构件完成第一层框架并同时完成第二层底板的第三步骤; 在第二层底板上的规划位置上堆叠和安装机舱单元的第四步骤; 以及将第一步骤至第四步骤重复到计划层的第五步骤,然后执行包括每个层的外部和设施的精加工结构,其中框架结构和堆叠和安装机舱单元的构造被同时执行 对于每一层
    • 10. 发明授权
    • 전이층이 있는 고층건축물의 공기단축을 위한 패스트업 공법
    • 高速公路建筑减速快速铺设方法
    • KR101395196B1
    • 2014-05-16
    • KR1020120137004
    • 2012-11-29
    • 삼성물산 주식회사
    • 박현일김용남서종해전병갑
    • E04B1/35
    • The present invention relates to a method for constructing a low-rise part and a high-rise part simultaneously after constructing a transition floor when constructing a high-rise building which is divided into the low-rise part and the high-rise part based on the transition floor in which a planar state is transited, and, to a fast-up method in which a construction method for a word of fast and a construction method for a word of up are combined, wherein the construction method for a word of fast is to construct the high-rise part while skipping over a middle floor and the construction method for a word of up is to construct upwards. The fast-up method according to the present invention is a construction method for the high-rise building divided into the low-rise part and the high-rise part based on the transition floor in which the planar state is transited, and comprises: a first step of constructing a core and columns over the transition floor; a second step of constructing the transition floor while supported at the position of the transition floor by the core and the columns; and a third step of simultaneously proceeding with the frame construction of the low-rise part under the transition floor and the frame construction of the high-rise part over the transition floor.
    • 本发明涉及一种在构建高层建筑物后,在构建高层建筑物之后,在构建高层建筑物之后,同时构建低层建筑物和高层建筑物的方法,该高层建筑物分为低层建筑物和高层建筑物,基于 转移平面状态的过渡层,组合用于单词快速构造方法和施工方法的快速方法,其中,快速单词的构造方法 是在跳过中间层的同时建造高层建筑,上一层楼的施工方法是向上建造。 根据本发明的快速方法是基于平面状态转移的过渡楼层的高层建筑物分为低层部分和高层部分的构造方法,包括: 在过渡层建造核心和柱的第一步; 构建过渡楼层的第二步,同时由铁心和列支撑在过渡楼层的位置; 以及第三步骤,同时进行过渡楼下的低层部分的框架结构和过渡层的高层部分的框架结构。