会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • 터릿용 보링 바의 치공구
    • B。。。。。
    • KR1020110049998A
    • 2011-05-13
    • KR1020090106802
    • 2009-11-06
    • 두산인프라코어 주식회사
    • 여재민
    • B23B29/24B23B29/30B23B29/12B23B29/02
    • PURPOSE: A jig tool of a boring bar for a turret is provided to reduce the re-installation time of a boring bar since first and second jig tool bodies are being mounted after the removal of the boring bar. CONSTITUTION: A jig tool of a boring bar for a turret comprises first and second jig tool bodies(200,210) and first and second jig tool covers(220,230). The first jig tool body is installed on one side of a tool post body(30). The second jig tool body is installed in a tool mounting position of a turret rotated in a tool post body. The first and second jig tool bodies comprise first and second concave receiving portions. The first and second jig tool covers are installed on the outside of the first and second jig tool bodies, respectively. The first and second jig tool covers comprise third and fourth receiving portions.
    • 目的:提供了一种用于转塔的镗杆的夹具工具,用于减少镗杆的重新安装时间,因为在移除镗杆之后安装了第一和第二夹具工具主体。 构成:用于转塔的镗杆的夹具工具包括第一和第二夹具工具主体(200,210)和第一和第二夹具工具盖(220,230)。 第一夹具工具主体安装在工具主体(30)的一侧。 第二夹具工具主体安装在转动在工具主体中的转台的工具安装位置。 第一和第二夹具工具主体包括第一和第二凹入物接收部分。 第一和第二夹具工具盖分别安装在第一和第二夹具工具本体的外侧上。 第一和第二夹具工具盖包括第三和第四接收部分。