    • 1. 发明公开
    • 교량 확장 구조
    • 桥梁延伸结构
    • KR1020140001418A
    • 2014-01-07
    • KR1020120068928
    • 2012-06-27
    • (주) 경화엔지니어링(주)고려씨엔씨(주)나우기술
    • 정인혁이종철박병규
    • E01D19/10E01D2/04E01D19/12E01C1/00E01F15/04E04C3/02E04C5/065E04C3/04E01D101/30
    • E01D19/103E01C1/002E01D2/04E01D19/125E01D2101/30E01F15/04E04C3/02E04C5/0653E04C2003/0452E04C2003/046
    • The present invention relates to a structure for extending a bridge comprising piers, copings and a bridge deck, wherein the structure comprises: a supporting bracket part anchored and supported to the side of the coping by PC strands; a new girder part supported and fixed by a bridge bearing installed on the upper side of the supporting bracket part; a new slab part installed to be extended to the new girder part after the outermost region of the upper slab of the bridge deck is demolished; a sidewalk part extended from the side end of the new slab part; and a connection supporting part supporting the sidewalk part by connecting the lower side of the sidewalk part and the side of the new girder part. The structure for extending a bridge is capable of easily extending the width of a roadway according to the increase of traffic volume using an existing bridge, freely extending a sidewalk and varying the width thereof, and securing structural stability and sharply reducing construction periods and construction costs with easy construction even if the bridge is extended according to structural variation.
    • 本发明涉及一种用于延伸桥梁的结构,该桥梁包括墩架,搭接和桥面板,其中,所述结构包括:支撑托架部分,其被PC绞链锚固并支撑在所述应力侧; 由安装在支撑托架部分的上侧的桥式轴承支撑并固定的新的梁架部分; 在桥面上部板块的最外区域被拆除后,安装新的板坯部分延伸到新的大梁部分; 从新的板坯部分的侧端延伸的人行道部分; 以及通过连接人行道部分的下侧和新梁部分的侧面来支撑人行道部分的连接支撑部分。 用于延伸桥梁的结构能够根据现有桥梁的交通量的增加容易地扩展道路的宽度,自由延伸人行道并且改变其宽度,并且确保结构稳定性并且大大减少施工周期和施工成本 即使桥梁根据结构变化而延伸,施工方便。
    • 3. 发明授权
    • 합성형 프리스트레스트 아치 라멘교 시공방법
    • RHAMEN BRIDGE的构造方法
    • KR101242395B1
    • 2013-03-12
    • KR1020120048496
    • 2012-05-08
    • (주)나우기술(주) 경화엔지니어링
    • 정인혁김문영이종철박병규
    • E01D21/00E01D2/00E01D19/12E04C3/10E01D101/32
    • E01D21/00E01D2/00E01D19/125E01D2101/32E04C3/10
    • PURPOSE: A composite prestressed arch rigid-frame bridge construction method is provided to maximize structural efficiency by pre-flexing a girder and to easily plan a rigid-frame bridge. CONSTITUTION: A composite prestressed arch rigid-frame bridge construction method comprises: a step of constructing a base and a wall of the lower structure(S10); a step of producing a main girder frame by assembling a main girder and a horizontal girder which is fixed at an upper end of the wall(S20); a step of fixing the girder frame at the upper end of the wall(S30); a step of pouring and curing a upper slab to the upper side of the main girder(S40); and a step of embedding both sides by putting prestressed concrete inside a pipe, which is inserted at both sides of the main girder, before the upper slab is poured(S50). [Reference numerals] (S10) Foundation and wall construction step; (S20) Main girder manufacturing and main girder frame assembling step; (S30) Main girder frame fixing step; (S40) Upper slab placing step; (S50) PC-strand permanently tensioning step
    • 目的:提供一种复合预应力拱形刚架桥梁施工方法,以通过预弯曲大梁和容易地规划刚性框架桥梁来最大限度地提高结构效率。 构成:复合预应力拱架刚架桥施工方法包括:构造下结构的底座和墙壁的步骤(S10); 通过组装主梁和固定在壁的上端的水平梁来生产主梁架的步骤(S20); 在所述壁的上端固定所述梁架的步骤(S30); 将上板坯浇筑并固化到主梁的上侧的步骤(S40); 以及在浇筑上板坯之前,将预应力混凝土放入插入主梁两侧的管内的步骤(S50)。 (附图标记)(S10)基础和墙施工步骤; (S20)主梁制造和主梁架组装步骤; (S30)主梁架固定步骤; (S40)上板坯放置工序; (S50)PC链永久张紧步骤