    • 1. 发明公开
    • ANCHOR BOLT
    • 锚杆螺栓
    • KR20090067132A
    • 2009-06-24
    • KR20090049574
    • 2009-06-04
    • HAN DONG HN
    • HAN DONG HN
    • F16B13/12F16B13/04
    • An anchor bolt is provided to prevent its flow even when external impact is applied by being easily and firmly united. An anchor bolt(10) comprises a first main body(100) and a second main body(200). In the first main body, a hole(110) is formed along an axial direction. Two or more through-holes(120) are formed along an exterior circumference of the first main body so as to be connected with the hole. The second main body includes a body part(210) and a leg part(220). The second main body is inserted into the first main body through the hole. The leg part is protruded to the outside of the first main body through the through-hole.
    • 即使通过容易且牢固地结合使用外部冲击,也提供一种锚定螺栓以防止其流动。 锚定螺栓(10)包括第一主体(100)和第二主体(200)。 在第一主体中,沿着轴向形成有孔(110)。 沿着第一主体的外周形成两个以上的通孔(120),以与孔连接。 第二主体包括主体部分(210)和腿部部分(220)。 第二主体通过孔插入第一主体。 腿部通过通孔向第一主体的外侧突出。
    • 2. 发明公开
    • METHOD FOR FOUNDATION CONSTRUCTION STRUCTURE OF PEDESTAL
    • 基础施工结构方法
    • KR20090086188A
    • 2009-08-11
    • KR20090065981
    • 2009-07-20
    • HAN DONG HN
    • HAN DONG HN
    • E02D27/42E02D27/28
    • E02D27/42E02D15/02E02D17/00E02D27/28E02D27/50E02D2300/002
    • A foundation method for construction structure of pedestal is provided to shorten the construction period for foundation and thereby minimize obstacle to passage of pedestrian and vehicles. A foundation method for construction structure of pedestal is as follows. One or more first foundation bores are excavated on the ground. Second foundation bores are excavated to be connected to the first foundation bore. A base frame(100) which is already manufactured is settled in one or two of the first and the second foundation bores. Concrete is applied through the base frame within the first and the second foundation bore, and then cured. The base frame comprises a structure mounting part(110), an anchor bolt(120), and a supporting board(130). The structure mounting part comprises a board material(112) on which a ground structure rests and a guide pipe(114) formed on the bottom of the board material. The anchor bolt is formed on the board material, apart from the concrete placing hole. The supporting board is installed in the guide pipe to support the structure mounting part.
    • 提供基座施工结构的基础方法,缩短基础施工期,从而尽可能减少行人和车辆通行障碍。 基座施工结构的基础方法如下。 一个或多个第一个基础孔被挖掘在地面上。 第二个基础孔被挖掘连接到第一个基础孔。 已经制造的基架(100)安置在第一和第二基础孔中的一个或两个中。 混凝土通过底架在第一和第二基础孔内施加,然后固化。 底架包括结构安装部分(110),锚栓(120)和支撑板(130)。 结构安装部分包括其上放置有接地结构的基板材料(112)和形成在基板材料的底部上的引导管(114)。 除了混凝土浇筑孔之外,地板螺栓形成在板材上。 支撑板安装在导管中以支撑结构安装部分。