会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • 샌드위치 타입의 육상트랙 경기장 시공방법
    • 沙滩式履带板的施工方法
    • KR1020130086871A
    • 2013-08-05
    • KR1020120007934
    • 2012-01-26
    • 한창무
    • 한창무
    • E01C13/00E01C13/06
    • E01C13/00E01C13/003E01C13/06E01C13/065
    • PURPOSE: A sandwich type athletic field construction method is provided to prevent cracking, lifting and the settlement of a base layer by maintaining proper elasticity, cushion, and various material properties necessary for an athletic track game. CONSTITUTION: A sandwich type athletic field construction method comprises a soil compaction step, a first rubble laying and compaction step, a second rubble laying and compaction step, a first pitch asphalt laying and compaction step, a second pitch asphalt laying and compaction step, a rubber chip and soft liquid urethane mixture laying step, a rubber chip and semi-rigid liquid urethane mixture laying step, and an emboss layer laying and line marking step. The second pitch asphalt laying and compaction step comprises a primer applying step. A rubber chip, a urethane chip, and two-liquid type soft polyurethane liquid are mixed for being applied after applying the primer. [Reference numerals] (AA) Construction process; (BB) Line marking step; (CC) Emboss layer laying step; (DD) Semi-rigid liquid urethane layer laying step; (EE) Soft liquid urethane layer laying step; (FF) Second pitch asphalt laying and compaction step; (GG) First pitch asphalt laying and compaction step; (HH) Second rubble laying and compaction step; (II) First rubble laying and compaction step; (JJ) Foundation-soil compaction step
    • 目的:提供一种夹心式运动场施工方法,通过保持运动轨迹游戏所需的适当的弹性,缓冲和各种材料特性来防止基层的开裂,提升和沉降。 构成:三明治型运动场施工方法包括土壤压实步骤,第一瓦砾敷设和压实步骤,第二瓦砾铺设和压实步骤,第一沥青沥青铺设和压实步骤,第二沥青沥青铺设和压实步骤, 橡胶芯片和软液氨基甲酸酯混合物铺设步骤,橡胶芯片和半刚性液体聚氨酯混合物铺设步骤,以及压花层铺设和线标记步骤。 第二沥青沥青铺设和压实步骤包括底漆施涂步骤。 将橡胶芯片,聚氨酯芯片和双液型软质聚氨酯液体混合,以在涂布底漆之后进行涂布。 (附图标记)(AA)施工过程; (BB)行标记步骤; (CC)压花层铺设步骤; (DD)半刚性液体聚氨酯层铺设步骤; (EE)柔软液体聚氨酯层铺设步骤; (FF)二级沥青铺设和压实步骤; (GG)沥青铺设沥青和压实步骤; (HH)第二瓦砾敷设和压实步骤; (二)瓦砾堆放和压实步骤; (JJ)基础土壤压实步骤