会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明公开
    • 원심분리를 이용한 가로등지주 연결 기초 콘크리트 구조물 제조 장치 및 제조방법
    • 制造方法和制造设备基础混凝土连接单元路灯推荐使用离心机
    • KR1020110054120A
    • 2011-05-25
    • KR1020090110645
    • 2009-11-17
    • 유한회사 삼학콘크리트
    • 이상준
    • E02D27/42E04H12/22B28B1/20E02D5/34
    • E02D27/42B28B1/20E02D5/34E02D2200/1685E02D2300/002E02D2300/0029E04H12/22
    • PURPOSE: An apparatus and a method for manufacturing a concrete foundation structure for connection of a streetlight post using centrifugation are provided to prevent accidents caused by exposed joints because the joint of a streetlight post and a concrete foundation structure is not exposed to outside. CONSTITUTION: A method for manufacturing a concrete foundation structure for connection of a streetlight post using centrifugation is as follows. A cylindrical frame(20), in which main and shear reinforcing bars are joined, is installed in a lower mold cavity(6) of a mold(1) comprising a pair of upper and lower molds(2,3) in order to form a cylindrical concrete foundation structure whose diameter is greater on the bottom than on the top. A guide pipe is installed to lead wires to the lower body position of the concrete foundation structure in the lower mold. Concrete is filled in the lower mold to bury the frame. Compaction using a vibrating rod and concrete filling are repeated, and the upper mold is coupled to the lower mold. The mold composed of the upper and lower molds is rotated at RPM of 200~300 for 2~5 minutes in a first centrifugal roller, at RPM of 700~800 for 2~5 minutes in a second centrifugal roller, and at RPM of 1300~1400 for 2~5 minutes in a third centrifugal roller. The mold is cured for six hours in a curing room. The upper mold is separated from the lower mold and a completed concrete foundation structure is removed from the lower mold.
    • 目的:提供一种用于制造用于使用离心的路灯连接的混凝土基础结构的装置和方法,以防止由于路灯柱和混凝土基础结构的接头不暴露于外部而导致的露出接头引起的事故。 构成:使用离心法制造用于连接路灯柱的混凝土基础结构的方法如下。 将主和剪切钢筋连接在一起的圆柱形框架(20)安装在包括一对上模和下模(2,3)的模具(1)的下模腔(6)中,以形成 圆柱形混凝土基础结构的底部直径大于顶部直径。 安装引导管将导线引导到下模具中的混凝土基础结构的下体位置。 混凝土填充在下模中以埋设框架。 重复使用振动棒和混凝土填充物的压实,并且上模与下模耦合。 由上下模具组成的模具在第一离心辊中以200〜300rpm的转速旋转2〜5分钟,在第二离心辊中以700〜800转/分2〜5分钟,转速为1300 在第三离心辊中〜1400分2〜5分钟。 模具在固化室中固化6小时。 上模与下模分离,完成的混凝土基础结构从下模移除。
    • 3. 发明公开
    • 원심력을 이용한 콘크리트 경계블록 제조방법 및 그 장치
    • 通过离心力制造边界石的方法及其装置的方法
    • KR1020110025386A
    • 2011-03-10
    • KR1020090083423
    • 2009-09-04
    • 유한회사 삼학콘크리트
    • 이상준
    • B28B1/20B28B1/087
    • PURPOSE: A method and an apparatus for manufacturing concrete boundary block using centrifugal force are provided to closely form the internal structure and the surface structure of the block. CONSTITUTION: A circular mold(10) is formed by combining an upper centrifugal roll casing and a lower centrifugal roll casing. A plurality of upper molding frames(15) and lower molding frames(16) include two receiving parts(17). A plurality of fixing plates(19) is installed between the upper molding frames and the lower molding frames. Extension supporting plates(23) are installed at both ends of the upper molding frames and the lower molding frames.
    • 目的:提供一种使用离心力制造混凝土边界块的方法和装置,以紧密地形成块体的内部结构和表面结构。 构成:通过组合上离心辊壳体和下离心辊壳体形成圆形模具(10)。 多个上模制框架(15)和下模制框架(16)包括两个接收部分(17)。 多个固定板(19)安装在上模制框架和下模制框架之间。 延伸支撑板(23)安装在上模制框架和下模制框架的两端。
    • 4. 发明公开
    • 원심분리를 이용한 가로등지주 연결 기초 콘크리트 구조물 제조 장치 및 제조방법
    • 制造方法和制造设备基础混凝土连接单元路灯推荐使用离心机
    • KR1020120108451A
    • 2012-10-05
    • KR1020110026323
    • 2011-03-24
    • 유한회사 삼학콘크리트
    • 이상준
    • E02D27/42E04H12/22
    • B28B1/20E02D27/42E04H12/22
    • PURPOSE: A manufacturing device and method of a connection of a foundation concrete structure of a streetlamp post using centrifugation are provided to improve an exterior and to prevent safety accidents by preventing a connection of a foundation concrete structure from being exposed to the outside. CONSTITUTION: A manufacturing device of a connection of a foundation concrete structure of a streetlamp post using centrifugation comprises a mold(1), a space(6), and a packing. Rail flanges(4) are formed in both ends of the mold. Multiple bolt fastening holes(5) are formed in the rail flanges and both longitudinal sides of the mold. The mold is composed of upper and lower molds(2,3). The space allows the lower body to have a bigger diameter than the upper body. The packing is formed between the upper and lower molds.
    • 目的:提供一种使用离心法连接路灯柱的基础混凝土结构的制造装置和方法,以改善外部并通过防止基础混凝土结构与外部的接触来防止安全事故。 构成:使用离心的路灯支柱的基础混凝土结构的连接的制造装置包括模具(1),空间(6)和填料。 导轨法兰(4)形成在模具的两端。 多个螺栓紧固孔(5)形成在轨道法兰和模具的两个纵向侧面。 模具由上下模具(2,3)组成。 该空间允许下身具有比上身更大的直径。 包装形成在上模和下模之间。
    • 6. 发明公开
    • 순환자원을 활용한 무시멘트형 비소성 무기 결합재
    • 利用再生资源的非水泥不燃烧无机粘合剂
    • KR1020170106746A
    • 2017-09-22
    • KR1020160030224
    • 2016-03-14
    • 유한회사 삼학콘크리트
    • 이상준문규돈정상화조영근최영철김주형이종원김성준
    • C04B18/14C04B18/06C04B111/00
    • Y02W30/92Y02W30/94
    • 본발명은순환자원을활용한무시멘트형비소성무기결합재에관한것이다. 본발명의무시멘트형비소성무기결합재는순환자원으로고로슬래그미분말을대량함유하되, 화력발전소에서발생하는유동층보일러애시를활성화제로활용하고, 탄산칼슘을더 함유하여혼합함으로써, 시멘트를전혀사용하지않아고온반응을통한이산화탄소배출의문제를근본적으로해소가능하고, 고로슬래그미분말을대량함유하면서도 3일, 7일및 28일의모든재령에서일반시멘트와동등수준의강도를구현하고, 특히조기강도발현이우수하고급결문제를개선하고수화생성물로인한팽창안정성을확보할수 있다.
    • 本发明涉及利用循环资源的无机水泥基可吸收无机粘结剂。 但本发明占空比水泥hyeongbi烧成无机结合材料为含有高炉矿渣在圆形资源,利用从发电厂活化剂产生的流化床锅炉灰的质量,并通过混合进一步含有碳酸钙,它不使用任何水泥高温 它可以从根本上通过反应解决二氧化碳排放问题,因此实现的普通水泥的强度和在包含在所述质量但3天,7天,炉渣28天的所有年龄相同的水平,特别是早期强度优良 可以改善细粒问题并确保由水合产物引起的膨胀稳定性。
    • 8. 发明授权
    • 원심분리를 이용한 가로등지주 연결 기초 콘크리트 구조물 제조 장치 및 제조방법
    • 制造方法和制造装置基本的混凝土连接单元路灯支柱用于离心
    • KR101228825B1
    • 2013-02-01
    • KR1020090110645
    • 2009-11-17
    • 유한회사 삼학콘크리트
    • 이상준
    • E02D27/42E04H12/22B28B1/20E02D5/34
    • 본 발명은 가로등 지주를 고정할 수 있도록 된 기초 콘크리트 구조물에 관한 것으로서, 더욱 상세하게는 양측 단부에 레일플랜지가 형성되고 양측 길이 방향으로 다수의 볼트 체결공이 구비되며 내부에 공간부가 형성된 하부몰드와 이의 상부에는 상부몰드가 결합되며 전체적인 형상이 원형 케이싱관 형태로 이루어진 성형몰드를 구성하고, 상기 성형몰드를 형성하는 상부몰드와 하부몰드는 성형되는 원기둥형태의 기초 콘크리트 구조물 상부몸체와 하부몸체의 직경이 상이하도록 상부몸체 직경 보다 하부몸체 직경이 더 크게 형성되도록 된 공간부를 구성하며, 상기 성형몰드를 이루는 상부몰드와 하부몰드의 사이에는 패킹이 포함되는 구성으로서, 본 발명은 가로등 지주의 기초 콘크리트 구조물로 사용될 수 있도록 함으로 연결부가 지상으로 노출되지 않아 외관이 미려하도록 한 가로등지주의 기초 콘크리트 구조물을 제공할 수 있도록 한 원심분리를 이용한 가로등지주 연결 기초 콘크리트 구조물 제조 장치 및 제조방법에 관한 것이다.
      원심력 성형, 기초 콘크리트 구조물, 성형몰드, 가로등지주
    • 9. 发明授权
    • 원심력을 이용한 콘크리트 경계블록 제조방법 및 그 장치
    • 通过离心力制造边界石的方法及其装置的方法
    • KR101101978B1
    • 2012-01-02
    • KR1020090083423
    • 2009-09-04
    • 유한회사 삼학콘크리트
    • 이상준
    • B28B1/20B28B1/087
    • 본 발명은 콘크리트 경계블록을 원심력을 이용하여 경계블록의 내ㆍ외부는 물론 표면을 시멘트 페이스트로 코팅시킴으로써 압축강도가 증대될 뿐 아니라 표면이 치밀하게 조직되어 표면미세공극이 최소화되고 이로 인한 표면조직의 흡수율역시 최소화되어 동결융해에 대한 저항성을 향상시키고자함과 동시에
      하나의 원심롤 케이싱 내부에 다수의 성형틀의 내장이 가능하면서 그 성형틀의 지지ㆍ고정은 하나의 인장철근에 의하여 이루어지고 다수의 성형틀의 탈형역시 지지ㆍ고정된 인장철근의 원터치 탈형에 의하여 다수의 성형틀이 동시에 모두 탈형되도록 하여 탈형이 간단하고 용이하게 이루어지도록 함에 있고, 하나의 원심롤 케이싱 내에 원터치 탈형이 가능한 다수의 성형틀의 내장이 가능하여 완제품의 대량생산이 가능하도록 함에 그 목적이 있다.
      이러한 목적을 달성하기위한 구성으로는, 상부 원심롤 케이싱과 하부 원심롤 케이싱의 결합으로 이루어진 원형 몰드와; 인장철근에 지지되는 2개의 수납부를 갖는 다수의 상부 성형틀 및 하부 성형틀과; 상부 성형틀과 하부 성형틀 사이에 각각 설치되며 양측 통공에 인장철근이 끼워진 다수의 고정판과; 상·하부 성형틀 수납부에 각각 채워진 몰타르가 서로 붙지 않도록 막음판 역할을 하는 격판과; 상ㆍ하부 성형틀 양측 최단부에 위치하고 양측에 인장 철근이 끼워진 인장 지지판과; 인장 스크류로 고정판을 밀면서 인장철근을 당겨 각각의 상부 성형틀과 하부 성형틀을 상부 원심롤 케이싱과 하부 원심롤 케이싱에 지지될 수 있도록 하는 구성이다.
      본 발명의 효과는 원심력에 의하여 콘크리트 경계블록의 내ㆍ외부조직이 강화될 뿐만 아니라 시멘트 페이스트의 코팅막이 표면의 미세공극을 최소화되게 함으로써 표면조직의 강화로 인한 흡수율의 감소 및 동결융해에 대한 저항성이 향상되게 되고, 원터치 탈형에 의해 다수개의 성형틀이 동시에 모두 탈형되는 구성이므로 탈형이 간단하고 용이하게 되며, 하나의 원심롤 케이싱 내부에 다수개의 성형틀이 내장되는 구성이므로 경계블록의 대량생산으로 인한 효율성 이 향상된 유용한 발명이다.
      경계블록, 원심력, 원형몰드, 중공부, 상·하부 성형틀