会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 81. 发明公开
    • 결합식 난방패널
    • 易于组装的加热面板
    • KR1020120084003A
    • 2012-07-27
    • KR1020110005282
    • 2011-01-19
    • 김희태
    • 김희태
    • E04C2/52F24D3/12
    • E04C2/525E04F2290/023F24D3/12Y02B30/24
    • PURPOSE: A combinable heating panel is provided to be easily installed and carried out, and to reduce damages when the panel is moved. CONSTITUTION: A combinable heating panel comprises a heating pipe(10), an urethane foam(8), a supply pipe(19), a return pipe(20), a supply pipe feeder(21), an inlet(2) of a return part, and the return part(24) of the return pipe. The heating pipe is laid on the urethane foam. The supply and return pipes are formed in one side of the urethane foam. The inlet of the return part is opened in order to be connected to the return part of the return pipe. On the side part symmetrical to the inlet of a steel case feeder, the inlet(2) of the return part is opened.
    • 目的:可组合加热面板易于安装和执行,并减少面板移动时的损坏。 构成:可组合的加热板包括加热管(10),聚氨酯泡沫(8),供应管(19),回流管(20),供给管进料器(21),入口 返回部件和返回管道的返回部件(24)。 加热管铺设在聚氨酯泡沫上。 供应和返回管形成在聚氨酯泡沫的一侧。 返回部件的入口打开以连接到回流管的返回部分。 在与钢箱进料器的入口对称的侧面部分,打开返回部件的入口(2)。
    • 82. 发明公开
    • 골판형 마그네슘 바닥온돌 방열판 및 이의 제조방법
    • 具有腐蚀形状的镁加热板,生产其相同的方法
    • KR1020120074676A
    • 2012-07-06
    • KR1020100136587
    • 2010-12-28
    • 주식회사 포스코재단법인 포항산업과학연구원
    • 유영동
    • E04C2/52F24D19/02F24D3/12B21D53/00
    • E04C2/525B21D53/00F24D3/12F24D19/0213
    • PURPOSE: A corrugated radiator panel made of magnesium materials for a floor heating system and a manufacturing method thereof are provided to reduce the construction period of a heating floor by effectively fixing a radiator panel. CONSTITUTION: A corrugated radiator panel(1) made of magnesium materials for a floor heating system comprises a square magnesium panel(100), upper and lower pipe grooves, and bored holes(400). The upper pipe grooves passing through the left and right sides of the square magnesium panel are straightly formed in the center of the upper side of the square magnesium panel. The lower pipe grooves passing through the left and right sides of a rectangular bottom panel are formed in the center of the lower side of the square magnesium panel. The bored holes are penetrated from the upper part to the lower part of the square magnesium panel. The upper and lower pipe grooves are symmetrically formed around the center line of the square magnesium panel.
    • 目的:提供一种由地板采暖系统的镁材料制成的瓦楞散热板及其制造方法,通过有效地固定散热板来减少加热地板的施工周期。 构成:用于地板采暖系统的由镁材料制成的瓦楞散热板(1)包括方形镁板(100),上下管槽和钻孔(400)。 通过正方形镁板的左右两侧的上管槽直线地形成在正方形镁板的上侧的中心。 通过矩形底板的左右两侧的下管槽形成在方形镁板的下侧的中心。 钻孔从方形镁板的上部到下部穿透。 上下管槽围绕方形镁板的中心线对称地形成。
    • 84. 实用新型
    • 에어벤트용 누수방지캡
    • 用于防止通风孔漏水的盖子
    • KR2020120002742U
    • 2012-04-23
    • KR2020100010497
    • 2010-10-13
    • (주)한국밸콘
    • 허은이
    • F24D19/08F24D3/12
    • F24D19/085F24D3/12Y02B30/24
    • 본 고안은 냉,난방 시스템의 배관파이프를 따라 순환 유동하는 냉,난방수에 포함된 공기를 외부로 배출하기 위한 에어벤트에 관한 것으로서, 더욱 상세하게는 에어벤트의 에어코크에 캡를 구비하고 그 내부에 수분의 량에 따라 수축 또는 팽창되는 수분흡수체를 개재함으로써 공기의 방출이 이루어지도록 하면서 수분의 누수를 방지하는 에어벤트용 누수방지캡에 관한 것이다.
      배관파이프의 적소에 설치되어 배관파이프 내의 공기를 대기중으로 방출시키도록 에어코크가 구비된 에어벤트에 있어서,
      상기 에어코크에 끼워지는 원형의 캡본체와;
      상기 캡본체의 내측에 구비되며, 수분 흡수를 통해 부피가 팽창하고 수분배출을 통해 부피가 수축되는 수분흡수체와;
      상기 캡본체가 상기 에어코크에 끼워지질 때 상기 수분흡수체와 상기 에어코크 사이에 개재되어 상기 에어코크의 선단과 접하는 탄성재질의 실링부재;를 포함하여 구성된 것을 특징으로 한다.
      본 고안의 에어벤트용 누수방지캡은 에어코크를 통한 누수를 방지함과 동시에 원활한 공기의 방출이 이루어지도록 함으로써, 난방수의 원활한 흐름과 함께 배관파이프의 부식 또는 오염을 방지하는 효과가 있다.
    • 85. 发明公开
    • Hot water heating gudle floor panel
    • 热水加热板地板
    • KR20120015534A
    • 2012-02-22
    • KR20100077698
    • 2010-08-12
    • KANG IN BEUM
    • KANG IN BEUM
    • F24D3/12E04F15/18
    • E04C2/525E04F15/203E04F2290/023F24D3/12Y02B30/24
    • PURPOSE: A floor heating system using hot water is provided to reduce vibration and noise transferred from upstairs to downstairs and to reduce the exhaust of carbon monoxide generated through aerated concrete mortar plastering. CONSTITUTION: A floor heating system using hot water comprises vermiculite mortar, an insulation panel(22), a floor panel(10), and rugged parts(18). The vermiculite mortar is spread on the top of a structure. The insulation panel is spread on the vermiculite mortar. The floor panel is spread on the insulation panel. The rugged parts are formed in the floor panel. Hot water pipes are inserted into the rugged parts. A finishing material is attached on the top of the floor panel to cover the rugged parts.
    • 目的:提供使用热水的地板采暖系统,以减少从楼上转移到楼下的振动和噪音,并减少通过加气混凝土砂浆抹灰产生的一氧化碳排放。 构成:使用热水的地板采暖系统包括蛭石砂浆,绝缘板(22),地板镶板(10)和坚固的部件(18)。 蛭石砂浆分布在结构的顶部。 绝缘板铺在蛭石砂浆上。 地板面板铺在绝缘面板上。 坚固的部件形成在地板面板上。 热水管插入坚固的部件。 整理材料安装在地板面板的顶部以覆盖坚固的部件。
    • 86. 发明公开
    • 건축용 황토 단열 복합바닥재의 시공방법
    • 用于施工的松土复合地板的施工方法
    • KR1020110096002A
    • 2011-08-26
    • KR1020100015468
    • 2010-02-20
    • 김용배김영연
    • 김용배김영연
    • F24D3/12E04C2/52
    • F24D3/12E04C2/525E04F2290/023Y02B30/24
    • PURPOSE: A method of constructing a loess insulating composite floor member is provided to decrease sick house syndrome since various poison is removed, far infrared, heat and moisture are appropriately discharged. CONSTITUTION: A method of constructing a loess insulating composite floor member comprises next steps. An insulating members(6) comprising an uneven part is placed on the top of a soundproof seat(4) to form an assembling panel(3). The assembling panels are assembled on a floor slab and a pipe is inserted along an installation line formed on the uneven part of the insulating member of the assembling panel. Loess gypsum-based cement composition and aggregation are mixed at the mass ration of 1 : 0.5 ~ 1 : 3 and then water is mixed with the mixture to loess concrete composition. The loess concrete composition is placed on the top of the assembling panels.
    • 目的:提供一种构建黄土绝缘复合地板构件的方法,以减少病房综合征,因为各种毒物被去除,远红外线,热和湿气被适当地排出。 构成:构造黄土绝缘复合地板构件的方法包括以下步骤。 包括不平坦部分的绝缘构件(6)放置在隔音座(4)的顶部上以形成组装面板(3)。 组装面板组装在楼板上,并且沿着形成在组装面板的绝缘构件的不平坦部分上的安装线插入管。 以1:0.5〜1:3的质量比混合黄土石膏基水泥组合物和聚集体,然后将水与混合物混合成黄土混凝土组成。 将黄土混凝土组合物放置在组装板的顶部。
    • 89. 发明公开
    • 욕실 난방 구조
    • 加热浴室结构
    • KR1020110024589A
    • 2011-03-09
    • KR1020090082648
    • 2009-09-02
    • 재성진흥 주식회사
    • 고용근
    • E04C2/52F24D3/12
    • Y02B30/24E04C2/525E04F2290/023F24D3/12
    • PURPOSE: A heating structure for a bathroom is provided to properly maintain the inner temperature of a bathroom by transferring heat stored in an inorganic material layer to a finishing material. CONSTITUTION: A heating structure for a bath room comprises a waterproof plate(10), a heating pipe(20), an inorganic material layer(30), and a finishing material(40). The waterproof plate is fixed to the floor of a bathroom. A first groove(11) is formed at the center of the waterproof plate except the outline part. The heating pipe is arranged in the first groove. Both ends of the heating pipe are connected to a heating water inlet and a heating water outlet. The inorganic material layer is formed in the first groove. The bottom of the inorganic material layer is located in the heating pipe. The finishing material is fixed to the inorganic material layer.
    • 目的:提供一种用于浴室的加热结构,通过将存储在无机材料层中的热量转移到整理材料来适当地保持浴室的内部温度。 构成:用于浴室的加热结构包括防水板(10),加热管(20),无机材料层(30)和精加工材料(40)。 防水板固定在浴室的地板上。 第一凹槽(11)形成在除了轮廓部分之外的防水板的中心。 加热管布置在第一槽中。 加热管的两端连接到加热水入口和加热水出口。 无机材料层形成在第一槽中。 无机材料层的底部位于加热管中。 整理材料固定在无机材料层上。
    • 90. 发明公开
    • 온돌바닥 배관파이프 교체 방법 및 이에 적합한 교체 구조
    • 底管及其结构的交换方法
    • KR1020100136241A
    • 2010-12-28
    • KR1020090054502
    • 2009-06-18
    • 김희순
    • 김희순
    • F24D3/12E04C2/52
    • F24D3/12E04C2/525E04F2290/023Y02B30/24
    • PURPOSE: A method of replacing an ondol pipe and a replacing structure suitable for the same are provided so that when a groove is formed on ondol, a pipe is installed in the groove and mortar is filled and hardened, then a hanging part is formed on the groove, the hardened mortar is not upwardly protruded and thus a replacing operation is simplified. CONSTITUTION: A method of replacing an ondol pipe comprises the next steps. A given width of groove is formed by cutting the existing mortar from the floor. A new pip is installed on the groove and mortar is filled. When the groove is formed, a hanging part is formed in the groove so that the mortar is not upwardly protruded in a process of being hardened. The inner bottom of the groove is wider than the top. Another groove is formed on the inner surface of the groove.
    • 目的:提供一种替换管道和替代结构的方法,使得当在槽上形成凹槽时,将管安装在凹槽中,并将砂浆填充并硬化,然后将悬挂部分形成在 凹槽,硬化砂浆不向上突出,从而简化了替换操作。 构成:替代管道管道的方法包括下一步骤。 通过从地板上切割现有的砂浆形成给定宽度的槽。 凹槽上安装了一个新口,填充了砂浆。 当形成凹槽时,在凹槽中形成悬垂部分,使得砂浆在硬化过程中不向上突出。 槽的内底比顶部宽。 在槽的内表面上形成另一个槽。