会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 4. 发明专利
    • Piping auxiliary device in railway facility tunnel and piping method
    • 铁路装备隧道和管道方法中的管道辅助装置
    • JP2012229563A
    • 2012-11-22
    • JP2011098574
    • 2011-04-26
    • Takasago Thermal Eng Co Ltd高砂熱学工業株式会社
    • TAHIRA EIJIKONDO HIROSHIYAMAMOTO YUKI
    • E21F17/00B66C23/20
    • PROBLEM TO BE SOLVED: To speedily and reasonably execute a pipe laying work in a tunnel of a railway facility.SOLUTION: A piping auxiliary device in a railway facility tunnel comprises: a rolling tower 2 capable of moving on a rail track 102 and of being assembled or disassembled by connecting or releasing joints 24; a hanging scaffold 3 which is arranged in a manner that protrudes from a side of the rolling tower 2 and enables a worker M to work thereon; a fall prevention jack 4 which is provided at an edge section of the rolling tower 2 and prevents the same from falling by pushing a wall surface of a tunnel 100; and a winch 5 which is arranged on the rolling tower 2 and moves piping 101 up and down inside the tunnel 100.
    • 要解决的问题:在铁路设施的隧道中快速,合理地执行管道铺设工作。 解决方案:铁路设施隧道中的管道辅助设备包括:能够在轨道102上移动并通过连接或释放接头24组装或拆卸的滚动塔架2; 悬挂式脚手架3,其以从滚动塔架2的侧面突出的方式布置,并且使得工人M能够在其上工作; 设置在滚动塔架2的边缘部分的防止落料器4,并且通过推动通道100的壁面来防止其掉落; 以及布置在轧制塔2上并在隧道100内上下运动管道101的绞盘5.版权所有(C)2013,JPO&INPIT
    • 6. 发明专利
    • Construction method for tower structure and crane for construction
    • 塔式结构和起重机施工方法
    • JP2009113922A
    • 2009-05-28
    • JP2007289188
    • 2007-11-07
    • Mitsui Eng & Shipbuild Co Ltd三井造船株式会社
    • MINAMI YOICHIONO JUNJIKAWAMOTO ATSUSHI
    • B66C23/20F03D11/04
    • Y02B10/30Y02E10/72
    • PROBLEM TO BE SOLVED: To provide a construction method suitable for the construction of a high-rise tower structure in a tower structure such as a support or a tower, and a crane for construction. SOLUTION: A carriage 11 mounted with a telescopic leg member 10 thereon is made to self-travel up to a construction place of a windmill 1 for power generation and is carried in. A crane 5 is installed at a top part of the leg member 10 and a windmill tower 2 is constructed by the crane 5. Support members of the windmill tower 2 are piled up by the crane 5, while elongating the leg member 10, the windmill tower 2 and the leg member 10 are linked by a linking arm 12, and the leg member 10 is fixed to the windmill tower 2. Overturning moment acting on the leg member 10 is opposed since the leg member 10 is fixed to the windmill tower 2 via the linking arm 12, and the leg member 10 can be elongated up to a high place without requiring a large-scale counter weight. COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:提供一种适用于在诸如支撑件或塔架的塔架结构中的高层塔式结构的构造和用于构造的起重机的施工方法。 解决方案:在其上安装有可伸缩腿部构件10的滑架11自行行进到用于发电的风车1的结构位置,并被承载。起重机5安装在 腿部构件10和风车塔架2由起重机5构成。风车塔架2的支撑构件由起重机5堆积,同时使腿部构件10,风车塔架2和腿部构件10延伸通过 连接臂12和腿部件10固定在风车塔架2上。作用在腿部件10上的翻转力矩是相反的,因为腿部件10通过连接臂12固定在风车塔架2上,腿部件10 可以伸长到高处,而不需要大的配重。 版权所有(C)2009,JPO&INPIT
    • 8. 发明专利
    • Disassembling crane device of cylindrical structure and disassembling method of cylindrical structure
    • 圆柱结构拆卸起重装置及圆柱结构拆卸方法
    • JP2006016872A
    • 2006-01-19
    • JP2004196472
    • 2004-07-02
    • Nishimatsu Constr Co Ltd西松建設株式会社
    • NAKAMA YUZO
    • E04G23/08B66C23/20
    • PROBLEM TO BE SOLVED: To efficiently disassemble these cylindrical structures in a cylindrical structure having the height unreachable by a crawler type tower crane or a cylindrical structure unable to secure a sufficient space on the periphery.
      SOLUTION: An opening part 3 is formed below a cutting part 1a of the cylindrical structure (a steel chimney 1), and a support member 4 for supporting the lower end of a mast (a steel mast 5) is installed in this opening 3, and a cutting piece 1b of cutting the upper end of the mast is positioned in the suspendible height. The one end side of a wire 6 is liftably suspended from the upper end part vicinity of the mast, and the cutting piece 1b is hung down by hoisting and delivering the other end side by a winch 7. The cylindrical structure is disassembled while successively downwardly transferring a disassembling crane 2 of the constitution by repeating such work.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:为了有效地拆卸具有不能由履带式塔式起重机或不能确保在周边上具有足够空间的圆柱形结构的高度的圆柱形结构中的这些圆柱形结构。 解决方案:开口部分3形成在圆柱形结构(钢烟囱1)的切割部分1a的下方,并且在该安装件中安装用于支撑桅杆(钢桅杆5)的下端的支撑构件4 开口3,切割桅杆的上端的切割片1b位于可悬挂的高度。 线6的一端侧可靠地悬挂在桅杆附近的上端部分上,并通过由绞盘7提升和输送另一端侧而将切割片1b悬挂下来。圆柱形结构在连续向下 通过重复这种工作来转移构造的拆卸起重机2。 版权所有(C)2006,JPO&NCIPI