会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • CONCRETE BLOCK AND RETAINING WALL
    • JPH09144035A
    • 1997-06-03
    • JP29814295
    • 1995-11-16
    • MOROZUMI KK
    • MOROZUMI MASAYUKIBABA TAKESHI
    • E02D29/02
    • PROBLEM TO BE SOLVED: To improve the operating efficiency of retaining-wall forming construction works by forming this retaining wall of a tabular wall-surface composing section, a back board section installed on the rear of the composing section and a fixing section integrally connecting the back board section. SOLUTION: Back board sections 14 are formed tabularly of concrete at regular intervals on the rear side of a wall-surface composing member 12. The back board sections 14 are connected and fixed integrally onto the rear of the wall-surface composing member 12 by fixing sections 16 at that time, and a concrete block 10 is formed as a whole. When the back board sections 14 are placed so as to be abutted against the face of a slope and a section between the rear of the wall-surface composing section 12 and the face of the slope is filled with ready-mixed concrete, the weight of the concrete is applied to the back board sections 14, and floating is prevented. Through-holes 18 are formed to the back board sections 14, sections among the fixing sections 16 at two places are formed in through-holes 20, and concrete is flowed preferably. The quantity of a bearing member 22 projected is adjusted, and the angle of the grade of the composing section 12 is adjusted. Accordingly, operation efficiency forming a retaining wall can be improved remarkably.
    • 6. 发明专利
    • WATER STORAGE SYSTEM OF RAINWATER, ETC.
    • JPH10331213A
    • 1998-12-15
    • JP14497297
    • 1997-06-03
    • MOROZUMI KKSEIBUTSU KANKYO SYST KOGAKU KE
    • MOROZUMI MASAYUKINAKAMURA TSUTOMU
    • E03B3/02E03B11/14
    • PROBLEM TO BE SOLVED: To improve water permeability, and to collect water passed through surface soil efficiently, by spreading pelletized soil, with which the complex of a fixed quantity of a water-soluble high-molecular compound and a clay mineral is mixed, all over up to specified depth and installing a water collecting tank to the lower section of a pelletized clay layer. SOLUTION: Soil such as a dug-up ground is supplied with an aqueous solution of a water- soluble high-molecular compound containing the complex of a fixed quantity of the water-soluble high-molecular compound and a clay mineral in an atomized shape. The aqueous solution of the water-soluble high-molecular compound is dried mainly by hot air, and soil is discharged into a screen, and spread all over a culvert system successively in descending order of grain size. A branch pipe and a main pipe 10b are communicated in a plane in a checkered shape and mounted under a pelletized soil layer 12. A large number of holes are formed to an upper section in a culvert collecting path 10, and the culvert collecting path 10 is inclined and disposed so that water passed through the pelletized soil layer 12 is collected into a water collecting tank 14 set up to a lower section. The top face of the culvert collecting path 10 is covered with a water-permeable mat. The culvert collecting path 10 is communicated with the lower section of the water collecting tank 14, and water is overflowed from the water collecting tank 14 and discharged from a discharge opening. Accordingly, the water permeability of deteriorated surface soil can be improved.