会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Method of repairing shroud head, and repair structure of the same
    • 修复头发的方法及其修复结构
    • JP2010256289A
    • 2010-11-11
    • JP2009109515
    • 2009-04-28
    • Toshiba Corp株式会社東芝
    • HATAKE HARUHIKOSATO KATSUHIROHIROSE KINZOMOTOKI HIDEOSATO TANOSHIKINUGASA KUNIHIKOMORI HIROSHIFUJITA TOMOKITAJIMA TOMOKO
    • G21C19/02
    • PROBLEM TO BE SOLVED: To reuse a shroud head for a core shroud by repairing a guide pin and a suspension rod deformed by an earthquake or the like by an underwater remote operation to make them replaceable.
      SOLUTION: In this method of repairing the shroud head, when the guide pin or suspension rod of the shroud head 4 temporarily mounted in a DS pool is deformed, a part or the whole of the guide pin disposed in a guide pin bracket 15 of the shroud head 4 is cut and removed in the DS pool 12, a new guide pin 20 is introduced to the removed part and installed in it, or a part or the whole of the suspension rod disposed in a suspension rod bracket of the shroud head 4 is cut and removed in the DS pool 12, a new suspension rod is introduced to the removed part and installed in it.
      COPYRIGHT: (C)2011,JPO&INPIT
    • 要解决的问题:通过修理通过水下遥控操作使地震等变形的引导销和悬架杆来重新使用用于芯护罩的护罩头,以使其可更换。

      解决方案:在这种修理护罩头的方法中,当临时安装在DS池中的护罩头4的引导销或悬架杆变形时,引导销的一部分或全部设置在引导销支架 护罩头4的15在DS池12中被切割和移除,一个新的引导销20被引入被移除的部分并安装在其中,或者悬挂杆的一部分或全部被布置在 护罩头4在DS池12中被切割和移除,将新的悬挂杆引入去除的部分并安装在其中。 版权所有(C)2011,JPO&INPIT

    • 3. 发明专利
    • Electrical discharge machining electrode
    • 电动放电加工电极
    • JP2006218565A
    • 2006-08-24
    • JP2005033487
    • 2005-02-09
    • Toshiba Corp株式会社東芝
    • UEKI TATSUYAHIROSE KINZOTOKUNAGA YOSHIHARU
    • B23H1/04
    • PROBLEM TO BE SOLVED: To provide an electrical discharge machining electrode for efficiently carrying out machining by performing continuous machining from roughing to finishing without replacing the electrode when the electrical discharge machining of a structure is carried out in machining liquid such as water by remote control, and by discharging machining chips produced between the electrical discharge machining electrode and a workpiece during the electrical discharge machining.
      SOLUTION: The electrical discharge machining electrode includes a cylindrical electrode body 2 with one end in an axial direction serving as a machined end 3, and with the other end serving as a device connection end 4. A rough machined part 5 and a finish machined part 6 are formed in sequence from the machined end side to the device connection end side on an outer peripheral face of the electrode body 2. Continuous machining chip guide grooves 10a-10h are formed on the outer peripheral faces of the rough machined part and the finish machined part. The machining chip guide grooves are linearly and spirally formed, and machining liquid jet openings 9a-9i are provided on a position shifted from the center of an end face of the machined end.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种放电加工电极,用于通过从粗加工到精加工进行连续加工而无需更换电极来有效地进行加工,而在通过如下方式在加工液体如水中进行结构的放电加工时 并且通过在放电加工期间放电在放电加工电极和工件之间产生的加工芯片。 解决方案:放电加工电极包括一个作为加工端3的轴向一端的圆柱形电极体2,另一端用作器件连接端4.粗加工部分5和 精加工部6从电极体2的外周面的机械加工端侧到器件连接端侧依次形成。连续加工芯片引导槽10a-10h形成在粗加工部的外周面上 和精加工零件。 加工芯片引导槽线性地并螺旋地形成,并且在从加工端的端面的中心偏移的位置上设置加工液体喷射口9a-9i。 版权所有(C)2006,JPO&NCIPI
    • 4. 发明专利
    • Device and method for electric discharge machining outside core shroud
    • JP2004317181A
    • 2004-11-11
    • JP2003108491
    • 2003-04-11
    • Toshiba Corp株式会社東芝
    • KOJIMA MASAYOSHIHIDAKA YUKIAKISUDO KAZUOWATANABE YUSUKEKASAI SHIGERUHIROSE KINZO
    • G21C19/02B23H9/00
    • PROBLEM TO BE SOLVED: To provide a device and a method for electric discharge machining outside a core shroud which easily and efficiently enables electrical discharge machining while maintaining the integrity of structures without causing any fractures or deformations of them.
      SOLUTION: While the device is equipped with a central rod 8 which is fixed and located in the central position of a top guide arranged on a core shroud, a turning flat car 9 which is turnably arranged on the central rod 8 and can turn along the periphery of an upper end of the core shroud and a turning arm 15 which is located vertically below along the outer peripheral surface of the core shroud from the turning flat car 9, is shaped like a drooping rod and can move up and down and turn as a device which enables a tool to gain access to a machining position outside the core shroud; the device includes an electrical discharge machine 7a which is detachably mounted at a lower end of an access device 5. The electric discharge machine 7a has a chuck 23 locked to a locking part 16 arranged at a lower end of the turning arm 15 of the access device 5, a mast 7 with an arm which is linked to the chuck 23, droops and can rotate by itself and an electrical discharge machine which is arranged at a lower end of the mast with the arm and conducts electric discharge machining in a machining position.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 6. 发明专利
    • Device and method for reinforcing reactor core spray system pipe
    • 用于增强反应堆芯喷涂系统管的装置和方法
    • JP2009264850A
    • 2009-11-12
    • JP2008113116
    • 2008-04-23
    • Toshiba Corp株式会社東芝
    • SUGANUMA NAOTAKAABURA AKINORISUDO KAZUOSATO TANOSHIHATAKE HARUHIKOHIDAKA YUKIAKIMATSUNAGA KEIJIHIROSE KINZO
    • G21C15/18G21D1/00
    • G21C15/18F16L13/06F16L43/02Y02E30/40Y10T29/49718
    • PROBLEM TO BE SOLVED: To prevent the occurrence of cracks or the development of generated cracks for all welded lines in a reactor core spray system piping, while protecting welding seams even if cracks develop and ultimately damage the reactor core spray system piping, and keeping the function of a reactor core spray system at the occurrence of a loss of coolant accident. SOLUTION: A device for reinforcing a reactor core spray system piping is disposed on the outer peripheral side of the welded part of a reactor core spray system piping 4 and across the welded line 10 of a welded part, and holds the outer peripheral surface of the reactor core spray system piping 4 at a position symmetrically with respect to an axis. The device includes bolts 13 and 14 serving as a mechanical fastening mechanism for applying a compression force from the outer peripheral side of the reactor core spray system piping onto a welded part formed on a clamp 21 or the like. COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题为了防止反应堆堆芯喷射系统管道中的所有焊接线产生裂缝或产生裂缝,同时即使裂纹发生并且最终损坏反应堆堆芯喷射系统管道也能保护焊缝, 并且在发生冷却剂事故损失的情况下保持反应堆堆芯喷雾系统的功能。 解决方案:用于加强反应堆堆芯喷射系统管道的装置设置在反应堆堆芯喷射系统管道4的焊接部分的外周侧上并跨过焊接部分的焊接线10,并且保持外周 反应堆芯喷雾系统管道4的表面在相对于轴对称的位置。 该装置包括用作机械紧固机构的螺栓13和14,用于将压力从反应堆芯喷射系统管道的外周侧施加到形成在夹具21等上的焊接部分上。 版权所有(C)2010,JPO&INPIT
    • 7. 发明专利
    • Core shroud replacement method
    • 核心SHROUD替代方法
    • JP2008232678A
    • 2008-10-02
    • JP2007069592
    • 2007-03-16
    • Toshiba Corp株式会社東芝
    • SUDO KAZUOSATO TANOSHIABURA AKINORIHIROSE KINZOKATSUMA SHINICHIYASUDA TOSHIHIRO
    • G21C19/02G21C13/00
    • Y02E30/40
    • PROBLEM TO BE SOLVED: To shorten greatly a period from manufacture of a new core shroud until finish of a replacement work through conveyance into the core shroud and an apparatus assembly work.
      SOLUTION: This method has a core shroud manufacturing process for manufacturing the core shroud on an operation floor over a reactor pressure vessel, and performing installation of a load supporting plate of the core shroud; a core shroud installation process for suspending and installing the manufactured core shroud from the operation floor into the reactor pressure vessel; a load supporting plate carrying-out process for carrying out in a body the load supporting plate to the operation floor side after installation of the core shroud; and an incore apparatus assembly process for dividing an internal space of the core shroud into an upper side working domain and a lower side working domain based on an installation height position of a core support plate, and advancing an assembly work of incore apparatuses by accessing each working domain respectively individually.
      COPYRIGHT: (C)2009,JPO&INPIT
    • 要解决的问题:从制造新的芯护罩到完成更换作业到运输到芯护罩和设备组装工作之间的时间大大缩短。 解决方案:该方法具有用于在反应堆压力容器上的操作台上制造芯护罩的核心护罩制造工艺,并且执行芯护罩的负载支撑板的安装; 用于将制造的芯护罩从操作底板悬挂并安装到反应堆压力容器中的核心护罩安装过程; 用于在安装芯护罩之后,在负载支承板上运行到操作底板侧的负载支承板执行过程; 以及基于芯支撑板的安装高度位置将芯护罩的内部空间分割成上侧工作区域和下侧工作区域的焚烧装置组装处理,并且通过访问每个工作区域来进行焚烧装置的组装工作 分别单独工作。 版权所有(C)2009,JPO&INPIT
    • 8. 发明专利
    • Jet pump replacement method
    • 喷射泵更换方法
    • JP2008134108A
    • 2008-06-12
    • JP2006319325
    • 2006-11-27
    • Toshiba Corp株式会社東芝
    • ABURA AKINORIYASUDA TOSHIHIROSUDO KAZUOHATAKE HARUHIKOKINUGASA KUNIHIKOMORI HIROSHIUENO KENICHIHIROSE KINZO
    • G21C19/02G21C15/25
    • Y02E30/40
    • PROBLEM TO BE SOLVED: To shorten a working time in a reactor to the utmost, and to thereby reduce an exposure dose of an operator, by performing each installation work of a riser tube and a diffuser simultaneously when performing a jet pump replacement work.
      SOLUTION: In this jet pump replacement method for replacing the jet pump arranged on an annular part between a core shroud of a reactor pressure vessel and an inner wall of the reactor pressure vessel, for circulating a coolant in the core in the connected state to a recirculation system, an installation work of the riser tube 11, a riser brace 13 and the diffuser 14 constituting the jet pump at the replacement time is performed simultaneously in a procedure wherein each work does not interfere with each other.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:为了最大限度地缩短反应器中的工作时间,并且由此减少操作者的曝光剂量,通过在执行喷射泵更换时同时执行提升管和扩散器的每次安装工作 工作。 解决方案:在该喷射泵更换方法中,用于更换布置在反应堆压力容器的芯护罩和反应堆压力容器的内壁之间的环形部分上的喷射泵,用于使连接的核心中的冷却剂循环 状态到再循环系统,在其中每个工件不彼此干扰的过程中同时执行提升管11,升降器支架13和构成喷射泵的更换时间的扩散器14的安装工作。 版权所有(C)2008,JPO&INPIT
    • 9. 发明专利
    • Machining device of reactor pressure vessel and its machining method
    • 反应堆压力容器加工装置及其加工方法
    • JP2005345296A
    • 2005-12-15
    • JP2004166032
    • 2004-06-03
    • Toshiba Corp株式会社東芝
    • HIROSE KINZOHIDAKA YUKIAKI
    • G21C19/02G21C19/20
    • PROBLEM TO BE SOLVED: To provide a reactor bottom structure machining device and its machining method capable of various kinds of machine works to the reactor bottom structure by remote control of the machining device inserted/removed through a penetration hole of control rod driving mechanism housing from the pedestal side positioned under a reactor pressure vessel, and storing inside a chip recovery hose. SOLUTION: A weld zone of a stub tube which is a machining object in the reactor pressure vessel is enclosed by a cylindrical member, to thereby put the inside of the cylindrical member into the aerial state, and a machining head part of the machining device is inserted into the inside of the control rod driving mechanism housing which is a machining object or into the through hole of the reactor pressure vessel for allowing the control rod driving mechanism housing to penetrate, from the pedestal side supporting the reactor pressure vessel from below. Then, the control rod driving mechanism housing or the stub tube which is the machining object is cut circularly, or a machining work of an excess thickness part after cutting is performed on the trace of a reactor bottom shape of the reactor pressure vessel. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供一种通过远程控制通过控制杆驱动的穿孔插入/移除的加工装置的反应堆底部结构加工装置及其加工方法,其能够对反应堆底部结构进行各种机械加工 机构壳体从位于反应堆压力容器下方的基座侧,并且存储在芯片回收软管内部。 解决方案:作为反应堆压力容器中的加工对象的短截线管的焊接区域由圆筒形构件包围,从而将圆筒构件的内部置于空中状态,并且将加工头部分 加工装置插入到作为加工对象的控制棒驱动机构壳体的内部或反应堆压力容器的通孔中,用于允许控制杆驱动机构壳体从支撑反应堆压力容器的基座侧穿透 下面。 然后,将作为加工对象的控制棒驱动机构壳体或短截线圆形地切割,或者对反应堆压力容器的反应器底部形状的轨迹进行切割后的多余厚度部分的加工加工。 版权所有(C)2006,JPO&NCIPI
    • 10. 发明专利
    • Work trestle inside nuclear reactor
    • 核反应堆内的工作目标
    • JP2007178334A
    • 2007-07-12
    • JP2005378714
    • 2005-12-28
    • Toshiba Corp株式会社東芝
    • HATAKE HARUHIKOHIROSE KINZOYAMAGUCHI OSAMUSUDO KAZUOYASUDA TOSHIHIROABURA AKINORIUENO KENICHI
    • G21C19/02
    • PROBLEM TO BE SOLVED: To efficiently restore an original jet pump structure not depending solely on remote operation without causing the problem related to exposure when jet pumps are replaced.
      SOLUTION: Working floors 3, 4, 5, 6 are arranged, inside a nuclear reactor pressure vessel, on the reactor bottom section, a recirculation nozzle section of the jet pump and a riser brace section and above the jet pump. The uppermost working floor 6 arranged above the jet pump is provided with a plurality of segments divided circumferentially and capable of being opened and closed, and can be opened circumferentially in an arbitrary direction. The working floor 5 disposed in the riser brace is provided with a rotary table 25 capable of being turned around the circumference of a column and a rotary drive mechanism 26 for driving the rotary table.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:为了有效地恢复原始喷射泵结构,而不是仅仅依赖于远程操作,而不会在喷射泵更换时引起与曝光有关的问题。 解决方案:工作层3,4,5,6在反应堆底部的核反应堆压力容器内部,喷射泵的再循环喷嘴部分和提升管支架部分以及喷射泵上方布置。 布置在喷射泵上方的最上层的工作台面6设置有沿圆周方向分割并能够打开和关闭的多个段,并且可沿任意方向周向地开放。 设置在立管支架中的工作台5设置有能够绕柱的圆周转动的旋转台25和用于驱动旋转台的旋转驱动机构26。 版权所有(C)2007,JPO&INPIT