会员体验
专利管家(专利管理)
工作空间(专利管理)
风险监控(情报监控)
数据分析(专利分析)
侵权分析(诉讼无效)
联系我们
交流群
官方交流:
QQ群: 891211   
微信请扫码    >>>
现在联系顾问~
热词
    • 1. 发明专利
    • Sanitization facility
    • 桑拿设施
    • JP2006181504A
    • 2006-07-13
    • JP2004378914
    • 2004-12-28
    • Tatsumi Sangyo:Kk株式会社たつみ産業
    • NIWAYAMA KOJI
    • C02F3/00B01D53/38B01D53/81E03F5/18
    • Y02A50/2358Y02A50/2359
    • PROBLEM TO BE SOLVED: To provide a sanitization facility which has an excellent deodorizing function and can independently be constructed inconspicuously, whose construction work can be done efficiently and whose maintenance cost can be reduced. SOLUTION: The sanitization facility comprises a septic tank 2 and a deodorization unit 1. The septic tank 2 has a vent 23 and is buried in the ground. The deodorization unit 1 has a ventilation pipe 10, comprises a packing material 15 and is also buried in the ground. The ventilation pipe 10 has a porous structure and one end 101 of the ventilation pipe is connected to the vent 23 of the septic tank 2. The packing material 15 is granular. The ventilation pipe 10 is also buried in the ground and the packing material 15 is arranged around the ventilation pipe 10. COPYRIGHT: (C)2006,JPO&NCIPI
    • 要解决的问题:提供具有优良除臭功能的消毒设备,可以独立地构造不明显,其施工工作可以有效地进行,并且可以降低维护成本。 解决方案:消毒设备包括化粪池2和除臭单元1.化粪池2具有通风口23并被埋在地下。 除臭装置1具有通风管10,其包括填料15,也被埋在地下。 通气管10具有多孔结构,并且通气管的一端101连接到化粪池2的通气口23.包装材料15是颗粒状的。 通风管10也埋在地下,包装材料15布置在通风管10的周围。(C)版权所有(C)2006,JPO&NCIPI
    • 3. 发明专利
    • Slab protecting device for cleaning tank
    • 用于清洁罐的SLAB保护装置
    • JP2003334572A
    • 2003-11-25
    • JP2002141854
    • 2002-05-16
    • Tatsumi Sangyo:Kk株式会社たつみ産業
    • NIWAYAMA KOJI
    • E03F5/18C02F3/00
    • Y02A20/216
    • PROBLEM TO BE SOLVED: To provide a slab protecting device for a cleaning tank, which securely protects a concrete in the curing process against damage or change of properties, in an easy and less costly manner and is suitable for space saving, and a method for forming a slab for the cleaning tank. SOLUTION: This slab protecting device comprises a protecting frame 3, a protecting cover 4 and tie bars 51. The protecting frame 3 has two opening faces opposed to each other and the protecting cover 4 is available separately from the protecting frame 3, placed on the upper part of the protecting frame 3 and covers one of the two mutually opposite opening faces. The tie bar 51 fixes the protecting cover 4 to the protecting frame 3. COPYRIGHT: (C)2004,JPO
    • 要解决的问题:提供一种用于清洁罐的板坯保护装置,其以易于且较便宜的方式可靠地保护固化过程中的混凝土免受损坏或特性的改变,并且适于节省空间,并且 一种用于形成用于清洗槽的板坯的方法。 解决方案:该板坯保护装置包括保护框架3,保护盖4和连接杆51.保护框架3具有彼此相对的两个开口面,并且保护盖4与保护框架3分开可用, 放置在保护框架3的上部并且覆盖两个彼此相对的开口面中的一个。 连接杆51将保护盖4固定在保护框架3上。版权所有(C)2004,JPO
    • 5. 发明专利
    • 太陽光発電システム
    • 太阳能发电系统
    • JP2015034967A
    • 2015-02-19
    • JP2014076953
    • 2014-04-03
    • 株式会社たつみ産業Tatsumi Sangyo:Kk
    • NIWAYAMA KOJI
    • G09F19/22G09F23/00
    • 【課題】高度の広告機能を有し、広告機能を付加したにも関わらず、発電能力が低下したり、太陽電池アレイ敷設作業工程が犠牲になることのないコストの安価な広告機能付太陽光発電システムを提供すること。【解決手段】太陽電池アレイ1は、受光面で見た色彩が互いに異なる第1太陽電池パネル11A及び第2太陽電池パネル11Bを含み、互いに間隔Dを隔てて、設置領域5に敷設されている。広告部3は、設置領域5の面上に付された地上広告部31と、第1太陽電池パネル11A又は第2太陽電池パネル11Bの色彩との組み合わせによって構成されている。【選択図】図1
    • 要解决的问题:为了提供具有广告功能的太阳能发电系统,其发电容量不劣化,或者不牺牲太阳能电池阵列配置工作过程,而不管广告功能的添加,并且具有广告功能 高级别。解决方案:太阳能电池阵列1包括第一太阳能电池板11A和在光接收表面上观察到不同色调的第二太阳能电池板11B,它们被设置在距离D的安装区域5上。广告部分 3由设置在安装区域5的表面上的地面广告部分31和第一太阳能电池板11A或第二太阳能电池板11B的色调组合形成。
    • 6. 发明专利
    • Base concrete molding member, purification equipment including it and installation method of purification equipment
    • 基础混凝土模具成员,净化设备及其净化设备的安装方法
    • JP2006102723A
    • 2006-04-20
    • JP2004296830
    • 2004-10-08
    • Tatsumi Sangyo:Kk株式会社たつみ産業
    • NIWAYAMA KOJI
    • C02F3/00
    • PROBLEM TO BE SOLVED: To provide a base concrete molding member having lightweight properties, capable of realizing the shortening of an execution period to stably manufacture base concrete of high quality and capable of achieving space saving with refreshed appearance, purification equipment including it and an installation method of purification equipment.
      SOLUTION: A lid plate part 10 has leg parts 15 erected on its one side 101 and a through-hole 17 is provided within the plane of the lid plate part 10 to pierce the lid plate part 10 from the other side 102 to one side 101. The base concrete molding member 1 is combined with a blower 3 and a purification tank 7 to be used in the purification equipment. The purification tank 7 includes outside connecting piping 70 having a rising part 71 and the blower 3 includes an air feed pipe 30 to be placed on the other side 102 of the base concrete molding member 1. The air feed pipe 30 is connected to the rising part 71 of the outside connecting piping 70 through the through-hole 17.
      COPYRIGHT: (C)2006,JPO&NCIPI
    • 解决问题:为了提供具有轻质性能的基础混凝土模制构件,能够实现缩短执行期间,以稳定地制造高质量的基础混凝土并且能够实现更新外观实现节省空间,包括其的净化设备 和净化设备的安装方法。 解决方案:盖板部分10具有竖立在其一侧101上的腿部15,并且在盖板部10的平面内设置有通孔17,以将盖板部10从另一侧102刺穿到 一侧101.基础混凝土模制构件1与用于净化设备的鼓风机3和净化罐7组合。 净化槽7包括具有升降部分71的外部连接管道70,鼓风机3包括一个放置在基础混凝土模制构件1的另一侧102上的供气管30.供气管30连接到上升的 通过通孔17连接外部连接配管70的部分71。(C)2006,JPO&NCIPI
    • 7. 发明专利
    • Base concrete board, tank supporting equipment and its installation method
    • 基础混凝土板,油罐支撑设备及其安装方法
    • JP2003019709A
    • 2003-01-21
    • JP2001207584
    • 2001-07-09
    • Tatsumi Sangyo:Kk株式会社たつみ産業
    • NIWAYAMA KOJI
    • E02D27/01B28B23/02
    • PROBLEM TO BE SOLVED: To provide a base concrete board capable of being adapted to a supporting object having various dimensions while deterioration in strength caused by poor temperature control or laying or banding together of reinforcing bars is prevented and shortening of a construction working process and prevention of a danger are achieved. SOLUTION: The base concrete board is prefabricated in a plant. A horizontal reinforcement 12 and a vertical reinforcement 13 are arranged inside a concrete base body 11. A part of the horizontal reinforcement 12 is extended in a specific direction, and projected from at least one side surface of the concrete base body 11 to form a connecting projected part 15.
    • 要解决的问题:提供一种能够适应于具有各种尺寸的支撑物体的基础混凝土板,同时防止由于温度控制不良或钢筋的铺设或捆扎在一起而导致的强度降低,并且缩短了施工工作过程和防止 实现了危险。 解决方案:基础混凝土板在工厂预制。 水平加强件12和纵向加强件13布置在混凝土基体11的内部。水平加强件12的一部分沿特定方向延伸并且从混凝土基体11的至少一个侧表面突出以形成连接 投影部分15。