    • Construction work management method for soil improving construction method and processing machine for soil improvement
    • 土壤改良施工方法及加工机械施工工程管理方法
    • JP2008101388A
    • 2008-05-01
    • JP2006284692
    • 2006-10-19
    • Takenaka Doboku Co Ltd株式会社竹中土木
    • OOTA YOSHITOMOONISHI TSUNEYASU
    • E02D3/12
    • PROBLEM TO BE SOLVED: To provide a construction work management method for a soil improving construction method, and also to provide a processing machine for soil improvement.
      SOLUTION: Test construction work for excavation/intrusion by using a processing machine 1 for soil improvement is performed at a position close to a boring data sampling position for providing clear soil composition. N-value data, etc. of a construction place to sample each of intrusion speed, intrusion depth, hours required for intrusion, a load torque value or a load current value of an electric motor being a power source for intrusion of the processing machine 1 for soil improvement, and an excavation resistance value at excavation time in the test construction work by using the processing machine 1 for soil improvement, are gatherered every intrusion depth until the intrusion reaches a supporting layer made clear by the boring data. Each of an estimated depth at the sampled supporting layer reaching time, an estimated load torque value or an estimated current value of the electric motor at the supporting layer reaching time, an estimated intrusion speed at the supporting layer reaching time, and an estimated excavation resistance value at the supporting layer reaching time is adopted as reference values for determining reaching at the supporting layer to carry the construction work after this according to the soil improving construction method forward in order from an adjacent position.
      COPYRIGHT: (C)2008,JPO&INPIT
    • 要解决的问题:提供一种土壤改良施工方法的施工工作管理方法,还提供一种土壤改良加工机。 解决方案:通过使用用于土壤改良的加工机1进行挖掘/侵入试验的施工工作,在靠近钻孔数据采样位置的位置进行,以提供清澈的土壤组成。 施加场所的N值数据等,以对入侵速度,入侵深度,入侵所需的时间,作为用于侵入处理机1的电源的电动机的负载转矩值或负载电流值进行采样 通过使用处理机1进行土壤改良,对于土壤改良和挖掘时间的挖掘时间的挖掘抗力值进行了整理,直到侵入到达由无聊数据清楚的支撑层为止。 取样支撑层的估计深度达到时间,估计负载转矩值或电动机在支撑层到达时间的估计电流值,估计的支撑层到达时间的入侵速度以及估计的开挖阻力 采用支撑层到达时间的值作为确定到达支撑层的参考值,以便根据土壤改良施工方法从相邻位置起依次进行施工。 版权所有(C)2008,JPO&INPIT