    • 3. 发明专利
    • Construction method for foundation structure
    • 基础结构施工方法
    • JP2007023602A
    • 2007-02-01
    • JP2005207037
    • 2005-07-15
    • Taisei Corp大成建設株式会社
    • AOSHIMA KAZUKIMASHIMA MASATO
    • E02D27/12E02D7/22E02D13/00E02D27/34
    • PROBLEM TO BE SOLVED: To provide a construction method for a foundation structure of such type that a foundation of a structure is put on a head part of an existing pile buried into the ground to form a joint condition of the existing pile and the foundation of the structure into a semi-rigid joint condition conforming to prospects in design.
      SOLUTION: This construction method for the foundation structure comprises a process for burying the existing pile 1 provided with a tool engaging with a rotary press-fitting device in the pile head part protrudedly into the ground by using the rotary press-fitting device, a process for removing the tool, a process for forming a cavity E enlarged toward a downward part between a side face of the pile head part and an inner peripheral face of a form 3 by putting and covering the mold 3 whose inner peripheral face is inclined on the pile head part, a process for placing leveling concrete around the form 3 while preventing flowing-in of concrete into the cavity E, and a process for placing foundation concrete becoming the foundation 2 of the structure on the hardened leveling concrete.
      COPYRIGHT: (C)2007,JPO&INPIT
    • 要解决的问题:提供一种这样的基础结构的施工方法,即将结构的基础放在埋在地下的现有桩的头部上以形成现有桩的接合状态 结构成为符合设计前景的半刚性接头状态的基础。 解决方案:该基础结构的施工方法包括:通过使用旋转压配装置将设置有与旋转压配装置接合的工具的现有桩1埋入桩头部突出地放入地面的过程 ,去除工具的方法,通过放置和覆盖其内周面为模具3的模具3形成朝向桩头部分的侧面和形状3的内周面之间的向下部分扩大的空腔E的工艺 倾斜在桩头部分上,是一种在混凝土进入腔体E的同时防止混凝土进入腔体E的过程,同时防止混凝土流入腔体E中,并且将基础混凝土置于硬化的流平混凝土的基础2上。 版权所有(C)2007,JPO&INPIT
    • 4. 发明专利
    • Support structure of concrete foundation, and pile foundation structure
    • 混凝土基础支撑结构和桩基础结构
    • JP2005133423A
    • 2005-05-26
    • JP2003370573
    • 2003-10-30
    • Taisei Corp大成建設株式会社
    • KAWABATA KAZUMIMASHIMA MASATOAOSHIMA KAZUKI
    • E02D27/12
    • PROBLEM TO BE SOLVED: To obtain sufficient bearing power by a pile with a comparatively simple structure in supporting a concrete foundation by the pile, and to suppress bending stress generated to a pile head and the foundation to reduce the cross section of the pile and foundation and to further prevent the damage of the pile head.
      SOLUTION: The upper end of the pile 1 opened at the upper end is supported abutting against a bottom face 2a of the concrete foundation 2. The transmission of tensile force is thereby suppressed to reduce the bending moment of the pile head. A cup-shaped closing member 3 is mounted on the upper end of the pile 1, and a part of the concrete foundation 2 projects into the pile 1 using the closing member 3 as a form to secure the transmission ability of horizontal external force by the projecting part 2b. Further, the lower part of the projecting part 2b is not brought into contact with an internal wall 1c of the pile 1 to suppress the generation of bending moment by the so-called leverage.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:为了通过桩具有相对简单的结构来支撑桩的混凝土基础获得足够的承载力,并且抑制对桩头和基础产生的弯曲应力以减小桩的横截面 桩和基础,并进一步防止桩头的损坏。 解决方案:在上端开口的桩1的上端被支撑抵靠混凝土基座2的底面2a。由此抑制张力的传递以减小桩头的弯矩。 一个杯状的关闭件3安装在绒头1的上端,一部分混凝土基座2使用封闭件3作为一种形式突出到桩1中,以确保水平外力的传播能力 突出部分2b。 此外,突出部2b的下部不与桩1的内壁1c接触,以通过所谓的杠杆来抑制弯矩的产生。 版权所有(C)2005,JPO&NCIPI
    • 5. 发明专利
    • Concrete foundation bearing structure
    • 混凝土基础承载结构
    • JP2005113494A
    • 2005-04-28
    • JP2003348714
    • 2003-10-07
    • Taisei Corp大成建設株式会社
    • KAWABATA KAZUMIMASHIMA MASATOAOSHIMA KAZUKI
    • E02D5/28E02D5/34E02D27/12
    • PROBLEM TO BE SOLVED: To provide a concrete foundation bearing structure by a pile, which is constructed at a low cost with good workability, and exerts sufficient bearing force while protecting a pile head from being damaged.
      SOLUTION: According to the concrete foundation bearing structure, a concrete foundation 2 is borne and mounted on the pile head of the pile 1, and the pile head of the pile 1 is embedded in the concrete foundation 2 such that a side surface of the pile 1 over an area from a pile head upper edge of the pile 1 down to a predetermined location in a pile axial direction makes contact with the concrete foundation 2. Herein a distance from the pile head upper edge down to the predetermined location in the pile axial direction is set to a value that can transmit shearing force from the concrete foundation 2 to the pile 1.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种以低成本,良好的可加工性构造的桩的混凝土基础承载结构,并且在保护桩头不被损坏的同时施加足够的承载力。

      解决方案:根据混凝土基础轴承结构,将一个混凝土基础2承载在桩1的桩头上,桩1的桩头嵌入混凝土基础2,使得侧面 从堆桩1的桩头上边缘到堆桩轴向方向上的预定位置的一个区域上的桩1与该混凝土基座2接触。这里距离桩头上边缘的距离向下到达预定位置 桩的轴向设定为可将剪切力从混凝土基础2传递到桩1的值。版权所有(C)2005,JPO&NCIPI

    • 7. 发明专利
    • Soil improvement method using microorganism
    • 使用微生物的土壤改良方法
    • JP2012107502A
    • 2012-06-07
    • JP2012022144
    • 2012-02-03
    • Taisei Corp大成建設株式会社
    • TAKAHATA AKIRAAOKI TOMOYUKIHORIKOSHI KENICHIWATANABE TORUOKUBO HIDEYAAOSHIMA KAZUKIKANEDA KAZUHIRO
    • E02D3/10E02D3/12E02D27/34
    • PROBLEM TO BE SOLVED: To provide a soil improvement method which reduces a construction cost and a maintenance cost, can be applied to underground soil of a preconstruction site and an existing building, and increases resistance to ground liquefaction with a method facilitating removal.SOLUTION: Nutrient required for metabolism of microorganisms existing in ground is supplied into the ground so as to promote the metabolism of the microorganisms, and resistance to ground liquefaction is increased by a metabolite of the microorganisms. The nutrient can also be supplied into the ground together with the microorganisms. The microorganisms for use in the invention are changed depending on the type of metabolic reaction. The resistance to the liquefaction is increased mainly by a decrease in the water saturation of the ground (production of nitrogen and carbon dioxide gas by the microorganisms) and an increase in viscosity (production of a biopolymer).
    • 要解决的问题:为了提供一种降低施工成本和维护成本的土壤改良方法,可以应用于预建筑地点和现有建筑物的地下土壤,并且通过方便移除的方法增加对地面液化的抵抗力 。 解决方案:将存在于地面中的微生物代谢所需的营养物质供应到地面,以促进微生物的代谢,并且通过微生物的代谢物增加对地面液化的抵抗力。 营养物质也可以与微生物一起提供给地面。 用于本发明的微生物根据代谢反应的类型而改变。 主要是通过降低地面的水饱和度(由微生物产生氮气和二氧化碳气体)和粘度的升高(生物聚合物的生产)来提高对液化的抵抗力。 版权所有(C)2012,JPO&INPIT
    • 8. 发明专利
    • Soil improving method using microorganism
    • 使用微生物的土壤改良方法
    • JP2009263934A
    • 2009-11-12
    • JP2008113084
    • 2008-04-23
    • Taisei Corp大成建設株式会社
    • TAKAHATA AKIRAAOKI TOMOYUKIHORIKOSHI KENICHIWATANABE TORUOKUBO HIDEYAAOSHIMA KAZUKIKANEDA KAZUHIRO
    • E02D3/10C09K17/32C09K103/00C12N1/20E02D27/34
    • PROBLEM TO BE SOLVED: To provide a soil improving method which realizes low construction cost and maintenance cost, which can be applied to a site before construction and an underground substrate of an existing building, and which can improve resistance to liquefaction of the ground by a method for easy removal.
      SOLUTION: Nourishment necessary for metabolism of a microorganism which exists in the ground is supplied to the ground, and the metabolism of the microorganism is promoted. Then the resistance to liquefaction of the ground is improved by the metabolite of the microorganism. The nourishment can also be supplied to the ground with the microorganism. The microorganism used for the soil improving method varies with metabolism reactions, but it improves resistance to liquefaction mainly because of a drop in the degree of water saturation of the ground (the formation of nitrogen and carbon dioxide gas by the microorganism) and an increase in viscosity (the formation of biopolymer).
      COPYRIGHT: (C)2010,JPO&INPIT
    • 要解决的问题:提供一种实现低施工成本和维护成本的土壤改良方法,其可以应用于施工前的现场和现有建筑物的地下基底,并且可以改善对液化的抵抗力 通过方便地去除的方法进行研磨。 解决方案:将存在于地下的微生物的代谢所需的营养物质供给到地面,促进微生物的代谢。 然后通过微生物的代谢物改善了地面液化的抵抗力。 营养也可以用微生物提供给地面。 用于土壤改良方法的微生物随着代谢反应而变化,但是主要是由于地下水饱和度的降低(微生物的氮和二氧化碳气体的形成)的降低而提高了液化的抵抗力, 粘度(生物聚合物的形成)。 版权所有(C)2010,JPO&INPIT
    • 9. 发明专利
    • Method for removing existing pile
    • 移除现有桩的方法
    • JP2003064680A
    • 2003-03-05
    • JP2001258725
    • 2001-08-28
    • Taisei Corp大成建設株式会社
    • MORITA YOSHIHIKOAOSHIMA KAZUKI
    • E02D9/02
    • PROBLEM TO BE SOLVED: To provide a method for removing an existing pile, in which the existing pile is not crushed in a casing intruded into ground, in which the existing pile can be easily pulled out, which enables the safe and efficient removal of the existing pile, and which allows a posthole after the removal of the existing pile to be closely backfilled with sediment, so as to be capable of offering stable ground.
      SOLUTION: This method for removing the existing pile comprises: a process in which the double-structure casing, composed of outside and inside pipes which are relatively movable in an axial direction, is intruded into the ground around the existing pile, in which the inside pipe and the pile are pulled out together in such a manner that the outside pipe is left behind, and in which the outside pipe is pulled out; and a process for backfilling a space part of the posthole.
      COPYRIGHT: (C)2003,JPO
    • 要解决的问题:提供一种用于去除现有桩的方法,其中现有的桩在被侵入地下的套管中不被破碎,其中现有的桩可以容易地被拉出,这使得能够安全和有效地移除 现有的桩,并且允许在现有桩的移除之后的后孔被严重地填充沉积物,以便能够提供稳定的地面。 解决方案:这种去除现有桩的方法包括:将由轴向上可相对移动的外管和内管组成的双层结构外壳侵入现有桩周围的地面, 将管和桩一起拉出,使得外管留下,外管被拉出; 以及用于回填后孔的空间部分的过程。
    • 10. 发明专利
    • Underground structure joint structure
    • 地下结构接头结构
    • JP2012177250A
    • 2012-09-13
    • JP2011040314
    • 2011-02-25
    • Taisei Corp大成建設株式会社
    • HORII YOSHIHIROAOSHIMA KAZUKINAGAO TOSHIMASAKOBAYASHI HARUOKOBAYASHI SHOICHIKOMURO TSUTOMU
    • E02D27/12E02D27/34
    • PROBLEM TO BE SOLVED: To provide an underground structure joint structure that can easily secure the soundness of a lower underground structure during an assumed earthquake.SOLUTION: There is provided the underground structure joint structure for joining an existent pile 3 and a new foundation 5 which are stacked one over the other under the ground. An upper recessed part 20 forming a gap part between the existent pile 3 and new foundation 5 is formed on at least one of contact surfaces of the existent pile 3 and new foundation 5, a lower hole 12 extending downward from an under surface of the upper recessed part 20 is formed on the lower surface of the upper recessed part 20, and an upper hole 21 extending upward from an upper surface of the upper recessed part 20 is formed at the position on the upper surface of the upper recessed part 20 facing the lower hole 12. A dowel steel material 30 which is not fixed while having one end inserted into the upper hole 21 and the other end inserted into the lower hole 12 is arranged in the upper recessed part 20.
    • 要解决的问题:提供一种地下结构接头结构,其可以在假定的地震期间容易地确保下部地下结构的健全性。 解决方案:提供了一种地下结构接头结构,用于将存在的桩3和一个在地下堆叠的新基础5相连接。 在现有桩3和新基座5的至少一个接触表面上形成有形成在现有桩3和新地基5之间的间隙部分的上凹部20,从上部的下表面向下延伸的下孔12 凹部20形成在上凹部20的下表面上,从上凹部20的上表面向上延伸的上孔21形成在上凹部20的上表面上的面向上凹部20的上表面的位置。 下部孔12.布置在上部凹部20中的,一端未插入上孔21而另一端插入下孔12中的定位销钢材30。(C) 2012年,JPO&INPIT