热词
    • 6. 发明专利
    • EXECUTION OF CONTINUOUS UNDERGROUND WALL
    • JPH0238619A
    • 1990-02-08
    • JP18829388
    • 1988-07-29
    • TOA HARBOR WORKS CO LTD
    • TATE AKIRA
    • E02D5/20E02D5/18
    • PURPOSE:To build a wall that needs less works of welding by erecting an antecedent reinforcing steel cage consisting of cross reinforcements to both sides of which box steels are penetrated and fixed into a slot and erecting a succeeding reinforced cage between antecedent walls after placing and hardening concrete. CONSTITUTION:A continuous underground wall antecedent unit wall reinforced cage 5 has joint members consisting of box steels 3 on the ends of both sides thereof. Cross reinforcements 2 of the reinforcement cage are placed by penetrating the box steels 3, and the cross reinforcements 2 and box steels 3 are fixed with spot welding. According to the constitution, the reinforced cage 5 is hung and erected into a slot as an antecedent panel, and concrete is placed respectively between box steels to build antecedent unit walls (A) after placing concrete into each of box steels 3 and hardening. After that, a succeeding panel reinforced cage 7 is erected between the antecedent unit walls to place concrete. Accordingly, works of welding between joint members and cross reinforcements are reduced.
    • 7. 发明专利
    • Method for setting long and large pipe
    • 用于设置长管和大管的方法
    • JP2003000090A
    • 2003-01-07
    • JP2001192399
    • 2001-06-26
    • Marino Forum 21Nkk CorpToa Harbor Works Co Ltd日本鋼管株式会社東亜建設工業株式会社社団法人マリノフォーラム二十一
    • YONEZAWA MASAYUKIMORIKAWA MASAOASADA TORUKATO KENTATE AKIRA
    • A01K61/00
    • Y02A40/81
    • PROBLEM TO BE SOLVED: To provide a method for easily and efficiently setting a long and large pipe even under severe oceanographic weather conditions without the need of any large-sized lifting equipment. SOLUTION: This method for setting a long and large pipe 1 comprises the following practice: adjoining the tip of the pipe 1 previously mounted with buoys 3 for weight reduction, an upending buoy 4 of an appropriate length is attached to the pipe 1 and a weight 5 is attached to the other end of the pipe 1; the resultant pipe 1 is towed, in a condition of being suspended undersea through a buoy 16, to a location of a buoy 2 moored at a specified setting site; the buoy 16 is then detached and the pipe 1 is subsequently raised upright, and a wire 17 set on the buoy 2 is attached to the tip of the pipe 1 followed by lifting the pipe 1 with the wire 17 to unify the pipe 1 and the buoy 2 together.
    • 要解决的问题:即使在严苛的海洋气象条件下,也不需要任何大型起重设备,即可提供一种便于高效地设置长,大管道的方法。 解决方案:用于设置长管1的方法包括以下做法:将预先安装有浮体3的管1的前端邻接以减轻重量,将适当长度的升降浮标4附接到管1上, 5连接到管1的另一端; 在通过浮标16悬挂在下面的情况下,将所得到的管道1拖到停泊在指定设置位置的浮标2的位置; 然后拆下浮标16,然后将管1竖立起来,并且将设置在浮标2上的导线17附接到管1的尖端,然后用导线17提升管1以使管1和 浮标2在一起。