    • 1. 发明专利
    • Construction administration system for sludge dredger
    • 泥浆灌溉施工管理系统
    • JPS6117643A
    • 1986-01-25
    • JP13799484
    • 1984-07-05
    • Toa Harbor Works Co Ltd
    • KOBAYASHI HIROFUMIKIMURA MASAOHORISAWA MASATO
    • E02F3/88E02F3/90E02F9/26G01S15/88
    • E02F9/26E02F3/907
    • PURPOSE:To raise the accuracy of construction work by a method in which an echo sounder is provided from the swinging direction of a suction head to each given direction to measure the top position of each sludge, the jumping height of the sludge, and distances from the seabed face. CONSTITUTION:Echo sounders 6F and 6B capable of measuring the distance of sludge 5 of the seabed from the sludge face are set at a distance of about 1m on front side F and back side B at almost right angle to the swinging angle S of a suction head 3, by which the depth of construction is detected. The depth of the head 3 in the sludge is detected by the sounder 6R provided ahead of the swinging direction S, and the jumping height of sludge 5 is detected by the sounder 6L provided in the back side. Since the finish face in the sounder 6L can be controlled on the basis of relationships of the measured values by the sounders 6B and 6L, the dredging performance can be raised by preventing incomplete dredging work and also minimizing the loss by overdredging.
    • 目的:通过以下方法提高施工工作的准确性:从吸头的摆动方向向每个给定方向提供回声测深仪,以测量每个污泥的顶部位置,污泥的跳跃高度和距离 海床面。 构成:能够测量海底污泥5与污泥面的距离的回波测深器6F和6B设置在前侧F和后侧B的大约1m处的距离与抽吸的摆动角度S几乎成直角 头3,检测到施工深度。 通过设置在摆动方向S前方的发声器6R检测污泥中的头部3的深度,并且通过设置在后侧的发声器6L检测污泥5的跳跃高度。 由于可以根据发声器6B和6L的测量值的关系来控制发声器6L中的完成面,因此可以通过防止不完全的疏浚作业并且还通过过度疏浚来最小化损失来提高疏浚性能。
    • 2. 发明专利
    • Detection of dredged sludge amount in sludge dredger
    • 在泥浆干燥剂中检测干燥的泥沙量
    • JPS6117644A
    • 1986-01-25
    • JP13799584
    • 1984-07-05
    • Toa Harbor Works Co Ltd
    • KOBAYASHI HIROFUMIKIMURA MASAOHORISAWA MASATO
    • E02F3/88E02F3/90E02F9/26G01F23/28G01F23/296G01S15/88
    • E02F9/26E02F3/907
    • PURPOSE:To grasp exactly the advancing condition of dredging work by a method in which a gyroscope for detecting the swinging angles of a suction head is provided, an echo sounder is provided in a given direction from the swinging direction, and the dredging work amount is calculated. CONSTITUTION:Echo sounders 6F and 6B capable of measuring the distance of sludge 5 of seabed from the sludge face are set at the distance of about 1m on the front side F and back side B at almost right angle to the swinging direction S of a suction head, by which the depth of dredging work is detected. The swinging width is detected by a gyroscope 8 and the dredging amount is calculated from the detected values of swinging width and dredging depth. By detecting the swinging speeds of the head 3, the efficiency of dredging work can be known. Since the dredging amount can be soon obtained during the dredging work, the advancing condition of the dredging work can be determined to make the construction administration of the dredging work easier.
    • 目的:通过提供用于检测吸头的摆动角度的陀螺仪的方法,精确掌握疏浚工作的进展情况,从摆动方向向给定方向设置回波测深仪,疏浚作业量为 计算。 构成:能够测量海底污泥5与污泥面距离的回波测深仪6F和6B设置在前侧F和后侧B的距离大约1m处,与吸力的摆动方向S几乎成直角 检测疏浚工作的深度。 通过陀螺仪8检测摆动宽度,根据检测到的摆动宽度和疏浚深度的值计算疏浚量。 通过检测头3的摆动速度,可以知道疏浚作业的效率。 由于疏浚工作中可以很快获得疏浚量,可以确定疏浚工作的进展状况,使疏浚工程的施工管理更加方便。
    • 5. 发明专利
    • CONCRETE PLACEMENT METHOD
    • JPH03224992A
    • 1991-10-03
    • JP1933090
    • 1990-01-31
    • TOA HARBOR WORKS CO LTD
    • INOUE TAKAHIROKOBAYASHI HIROFUMIMURAKAMI TAKAO
    • E21D11/10E01D1/00E01D4/00E01D21/00E01D101/24E01D101/26E21D9/00
    • PURPOSE:To make execution of work easy by a method wherein sensor heads and reflecting boards are installed on both sides of a form timbering and on fixed points corresponding to them, and displacements measured with the above- mentioned instruments are displayed and concrete is placed according to the displayed displacements. CONSTITUTION:Sensor head 10, 10A, numbered five in total, are fixed to two positions on the underside on both the right and the left sides of a gantry 5 and to a position on the gable side of a tunnel. Reflecting boards 11, 11A are then provided, facing each of the sensor heads, and are fixed to the ground GL. Laser beams emitted from the sensor heads 10, 10A are reflected with the reflecting boards 11, 11A and the distance between each of the sensor heads and each of the reflecting boards is measured out of the time required for returning of the reflected beam. According to displacements confirmed by the above-mentioned measurement, quantity of concrete to be placed and the measured displacement of a form timbering are shown on a CRT, and speed and positions for concrete placement is then adjusted by visual observation of the display so that the displacements become roughly identical on both the right and the left sides of the form timbering.