    • Vertical loading testing method for ground for utilizing foundation of existing structure
    • 用于现有结构基础的垂直加载测试方法
    • JP2005036581A
    • 2005-02-10
    • JP2003276631
    • 2003-07-18
    • Takenaka Komuten Co Ltd株式会社竹中工務店
    • UCHIDA AKIHIKOTSUCHIYA TOMIOHAMADA JUNJIOKAMOTO KENYAMASHITA KIYOSHIKAKURAI MASAAKI
    • E02D1/00
    • PROBLEM TO BE SOLVED: To provide a vertical loading testing method of the directly under ground confirming availability of the directly under ground of a structure without pulling down a foundation of the existing structure.
      SOLUTION: A part of a foundation slab coming into contact with the ground surface of the existing structure is separated from the peripheral part in a predetermined size and shape to form a loading slab. A loading testing jack together with a load meter and a displacement meter are installed on the loading slab in an approximately vertical posture to have such a constitution that loading test reaction force is taken in a beam of the existing structure or a slab, and the jack is driven to perform a loading test. After the completion of the loading test, the loading slab is removed to restore the foundation slab, alternatively the loading slab is again combined with the foundation slab to restore the foundation slab.
      COPYRIGHT: (C)2005,JPO&NCIPI
    • 要解决的问题:提供一种直接地下直立荷载测试方法,可确认直接在结构下的结构,而不会拉动现有结构的基础。 解决方案:与现有结构的地表面接触的基础板的一部分以预定的尺寸和形状与周边部​​分分离以形成装载板。 负载测试千斤顶与负载表和位移计一起以大致垂直的姿态安装在装载板上,以具有在现有结构或板坯的梁中加载测试反作用力的结构,并且千斤顶 被驱动进行加载测试。 装载试验完成后,拆卸装载板,恢复基础板,或者将装载板再次与基础板结合,以恢复基础板。 版权所有(C)2005,JPO&NCIPI
    • 9. 发明专利
    • GUIDE PIPE FOR COMPACTION PILE
    • JPH05209409A
    • 1993-08-20
    • JP34123990
    • 1990-11-30
    • TAKENAKA KOMUTEN COTAKENAKA DOBOKU
    • KAKURAI MASAAKIYAMASHITA KIYOSHITSUCHIYA TOMIOKURITA YOSHIHIKOFUKUHARA TAKUHEI
    • E02D3/08E02D5/20E02D5/34E02D5/62
    • PURPOSE:To prevent muddy water or the like from erupting while a compaction pile is driven in by a method wherein the front end of a guide pipe is shielded watertightly with a covering material equipped with a plurality of cut grooves, and a plurality of such guide pipes are integrally attached to a reinforcing bar basket to be used for construction of a continuous underground wall. CONSTITUTION:A guide pipe 1 is constructed in such structure that the front end thereof is shielded watertightly with a cover 12. A number of cut grooves 15 are formed on the cover 12 so that the grooves extend radially from the center of the cover, and thereby breaking of the cover by driving-in of a compaction pile 2 is made easy. A reinforcing material in upside-down conical shape in 45 deg. inclination is provided to the inside of the guide pipe for making correction to centering of the compaction pile 2 easy. Then a specified number of guide pipes 1 are integrally attached to appropriate positions of a reinforcing bar basket 4 for cast-in-place concrete 3, and are inserted together with the reinforcing bar basket 4 into an excavated hole. Thereby the compaction piles 2 can be driven correctly into point ground and water accompanying excavation and underground water erupting around the compaction piles can be prevented from flowing backward.